您好,欢迎访问三七文档
世纪东方嘉园Ⅱ区3#楼1目录1、编制依据····································································22、施工安排····································································33、施工准备····································································44、主要施工方法······························································104.1管路布置与固定···························································104.2砼浇筑技术措施···························································124.3施工缝的位置与处理·····················································174.4砼的养护····································································184.5砼试块制作·································································195、质量要求····································································206、成品保护····································································247、安全文明、环保施工措施···············································25世纪东方嘉园Ⅱ区3#楼21、编制依据序号图纸、规程规范及标准名称代号1施工图纸、施工组织设计2《混凝土结构工程施工质量验收标准》GB50204-20023《建筑安装工程施工质量统一验收标准》;DBJ01-26-20034《混凝土泵送施工技术规程》JGJ/T10-95;5《建筑机械使用安全技术规程》JGJ33-866《预拌砼质量管理规程》DBJ01-6-907《高层建筑砼结构技术规程》JGJ3-20028《中华人民共和国环境保护法》9《建设工程质量管理条例》中华人民共和国国务院令第279号10《北京市建设工程施工试验实行有见证取样和送检制度的暂行规定》京建法[1997]144号11《北京市建设工程施工试验实行有见证取样和送检制度的暂行规定》的补充通知京建法[1998]50号12结构长城杯工程质量评审标准DBJ/T01-69-200313集团公司ISO9002及14000程序文件世纪东方嘉园Ⅱ区3#楼320m2-A轴竖向砼泵管(每层拉设)稳固架子钢管支架支撑水平管6m×10m砼泵房窗口1-G轴2-21轴1-1轴2-19轴1-J轴北砼泵管设置平面位置图2、施工安排2.1为加快施工进度,地下底板及地下一层分为5个施工流水段,地上分为8个流水段(墙体、顶板)。见附图。2.2采用预拌砼。。1)根据工程分段情况,按下图所示位置设置地泵:2)首层以上采用HBT50C型砼地泵2台输送,布料杆布料,必要时与塔吊配合。砼地泵及泵管布置如下图所示:2.3砼表面要求一次达到清水砼标准。世纪东方嘉园Ⅱ区3#楼地泵地泵-0.600地上首层二层泵管主线地泵地泵及泵管布置剖面图地下一层100×100木方世纪东方嘉园Ⅱ区3#楼43、施工准备3.1现场准备3.1.1根据现场实际情况,砼运输车由东侧施工道路进出场。3.1.2由水泵房接出N100水管至西侧现场,提供施工用水。3.1.3地泵旁边设1米×2米×2米沉淀池。3.1.4配置治理扬尘的洒水管及喷头。3.1.5西侧设百页箱一个。3.2预拌砼供应商的选择3.2.1选择有实力、守信誉,重质量的厂家。(北京市建工集团有限责任公司)3.2.2砼运输距离3公里。3.3各部位预拌砼用量表部位强度等级抗渗等级砼量m³垫层C15245基础底板C30S61960-1层墙体C30250-1层顶板C30600地下室外墙C30S61301-7层墙体C30每层6801-7层顶板C30每层3908-16层墙体C25每层6808-16层顶板C25每层38017-21层墙体C25每层680世纪东方嘉园Ⅱ区3#楼517-21层顶板C25每层380水箱间墙体C25186水箱间顶板C25403.4施工机具准备序号名称单位数量备注1振捣棒φ50条202振捣棒φ30条103振捣器台104空压机台15强力吸尘器台13.5劳动用品准备序号名称单位数量备注1劳保服套152胶鞋手套套303护目镜个103.6管理人员及劳动力的配备3.6.1管理人员的配备工作内容人数(个)所属部门姓名前后方协调工作1工程组夏学强解决砼施工过程中的技术问题2技术组王金文砼供应外联工作1工程组杨寿刚现场材料供应和实施砼浇筑指挥2工程组、质检组杨寿刚孙本福世纪东方嘉园Ⅱ区3#楼6交通协调2安全组赵润春协调砼供应情况2搅拌站夏学强3.6.2劳动力配备:序号工种人数1振捣工202抹灰工203普工304信号工45电工23.7施工联络方式3.7.1编制砼搅拌站、项目部管理人员、施工队管理人员电话联络表。3.7.2施工现场主要指挥人员配备6部对讲机。3.7.3制定轮流值班表,确保联系及时到位。3#楼砼试模及用具表序号试模及用具名称规格型号单位数量1砼试模100×100×100mm组202震动台800×800×330处13砂浆试模70.7×70.7×70.7组44塌落度桶上口直径100mm下口直径200mm筒高300mm个25油刷子2寸只56铁抹子只47油灰刀2寸只28捣棒Ф16长600mm根29钢卷尺5m只210铁铲把211手推车辆1世纪东方嘉园Ⅱ区3#楼712铁桶只113高低温度计只114扫帚把215温度计只203.8试验准备1)由试验员准备坍落桶等测试器具,试模、震动台以及其他有关工具2)试验计划世纪东方嘉园Ⅱ区3#楼砼工程试验工作计划部位强度等级抗渗等级砼量m³标养组数抗渗组数结构实体见证数量垫层C1524535基础底板C30S6196019555-1层墙体C302505552-1层顶板C30600553地下室外墙C30S613055511-7层墙体C30每层6808841-7层顶板C30每层3908848-16层墙体C25每层6808848-16层顶板C25每层28088417-21层墙体C25每层48088417-21层顶板C25每层280884水箱间墙体C25186281水箱间顶板C2540211世纪东方嘉园Ⅱ区3#楼83.9技术方面的准备工作3.9.1由技术组向质检组、工程组及施工队从施工方法到技术措施及质量标准做好各部位砼浇筑的交底工作,并作到层层交底,并随时抽查交底情况,视情况给予奖励和惩罚。3.9.2材料、机具、人员等准备必须由技术组提供计算依据,计划上报,不能盲目运作。3.9.3新规范、新标准,原内容发生很多改动,由技术组组织各组进行学习、领会。3.9.4根据新的资料整理办法,提前收集、整理各项施工资料,避免事后补写。3.10预拌砼技术要求:3.10.1基础底板外墙内墙顶板楼梯及地上墙板楼梯砼技术要求序号项目技术要求1用量////2强度等级C30C35C25大体积砼C30S63初凝时间6h6h4h6h4终凝时间12126h12h5水泥品种P.O42.5P.O42.5P.O32.5P.O42.56砼最大含碱量3Kg/m33Kg/m3/3Kg/m37水灰比0.550.550.550.558砂率35~45%35~45%35~45%35~45%9灰砂比1:2-1:2.51:2-1:2.51:2-1:2.51:2-1:2.510坍落度140-180140-180140-180100-140世纪东方嘉园Ⅱ区3#楼911最小水泥用量280Kg/m3280Kg/m3225Kg/m3280Kg/m312供应速度30m3/h30m3/h18m3/h30m3/h13砼最大含氯量0.3%0.3%1%0.3%注:1、砼从出站到施工现场时间超过1h视为无效砼,责令退回。2、随车提供各种相关资料:商品合格证、砼运输单、各种材料复试报告单及合格证、砼碱含量报告及含氯量计算书等。3、防水砼坍落度要求100-140mm。3.11地下基础底板、地下一层、地上墙体和顶板砼的施工。(进入冬施阶段见冬施施工方案)3.11.1砼地泵泵送要点3.11.1.1一般要求a.泵管按2.2砼地泵及泵管布置图进行支设。b.浇筑前必须检查泵管的连接,固定及地泵试运转的情况;砼浇筑完毕后对地泵和泵管及时进行修理,以保证拖式泵正常工作。世纪东方嘉园Ⅱ区3#楼104、主要施工方法4.1管路布置与固定1)管路布置原则:距离尽可能短,弯管尽可能少,管路连接要牢固,稳定各管卡位置不得与地面支撑物接触,管卡在水平方向距离支撑物100mm,距离地面100mm,水平管通过自然地面向上弯起每3m设一个固定节点,垂直管下端的弯管不能作为上部管道的支撑点,管道采用Φ125mm无缝高压泵输送。管道接头应有橡胶垫圈,接头密封严密,保证卡箍处不漏浆。2)泵体引出的水平管进须转弯处用90°弯管,并设泵送承台。垂直泵管用钢管架子围抱,水平泵管与垂直泵管相交处下部加顶撑与砼泵出口锥管直接相接,输送管用马凳支撑(见后图)。3)本工程采用结构内布管的形式配管地下从-0.60m地面向下接管,地上从首层窗洞口进入建筑物,沿预留洞口向上伸展到浇筑平面时,甩出弯管接水平管,直到要浇筑部位。4)泵管要在以下部位进行固定:①泵管与拖式输送泵接口部位附近:该处受到的冲击力最大,双道钢管架固定。②泵管进入楼层,在门窗处进行固定:用钢管夹住窗口两侧并通过木楔个固定泵管。③泵管在首层由水平管变成立管处进行固定:通过架料钢管借助上下楼板将泵管固定。④垂直管在每层楼板(洞口)进行固定:垂直泵管通过木楔将泵管在楼板预留洞口和塞死。5)泵送的准备世纪东方嘉园Ⅱ区3#楼11①检查泵机就位是否牢固,布管是否正确,搅拌机砼罐车导入缸料槽布置是否正确。②检查水源、电源、接通情况,测电压(≥380V),并注意保护电缆线,不得使电缆在工作过程中受到损坏。6)泵送程序①泵送砼前,先泵两斗清水以湿润管路,料斗,砼缸。②泵适量与砼同配合比无石子砂浆。③在料斗中砂浆未完全泵完,料位在搅拌轴以上时,加入砼料,开始泵送。泵送过程中,如停机时间过长(不考虑外加剂时,夏季30min)则必须卸完料斗内砼料,搅拌后再泵送。④泵送开始时的速度要先慢后快,逐步加速,同时观察砼泵的压力和各系统的工作情况,待各系统运转顺利后,再按正常速度进行泵送。⑤中断泵送后,再次泵送时,应先反泵2~3个行程,将分配阀内的砼吸回到料斗中,经充分搅拌后再泵送。⑥泵送结束后,应及时清洗泵机及管路。⑦泵送结束时,应拆开水平管与垂直管结合处管卡,将垂直管路的砼料卸掉,然后加满水,用卡球将砼缸及料斗冲洗干净。7)操作中注意事项①泵管堵塞原因分析及处理方法世纪东方嘉园Ⅱ区3#楼12序号可能原因处理方法1砼浇筑后管内未清洗干净拆管清理2塌落度过大造成石子分离严格控制坍落度(基础工程100-140mm,其他按140-180mm)3砼浇筑前未润湿泵管先用水泵送水湿润管壁4接泵管未加橡胶垫圈漏缝拆管加上橡胶垫圈5砼料停留时间长,已离析将离析砼料清除换合格砼、拆泵管6夏天泵管过热管内干燥覆盖泵管7冬天泵管内冰冻保温泵管包扎②泵管用钢管固定牢固,仔细检查每层与结构的连接点,并定期检查地泵的性能。4.2砼浇筑技术措施4.2.1砼垫层1)施工前,按基础外轮廓线确定好基坑位置,并按垫层底标高平整碎石褥垫层。2
本文标题:结构砼方案1
链接地址:https://www.777doc.com/doc-3189215 .html