中国联通广西分公司移动网主体工程安装施工技术规范(试行)中国联通广西分公司二零一一年十二月中国联通广西分公司移动网主体工程安装施工技术规范中国联通有限公司广西分公司1目录第一部分:基站类型第二部分:设备机架的安装固定····································································2第三部分:电池组的安装固定······································································10第四部分:室内线缆布放与连接··································································15第五部分:设备馈线布放与连接··································································23第六部分:天线的安装固定··········································································34第七部分:基站配套工程··············································································39第一章:走线架的安装··················································································39第二章:馈线窗与接地铜排安装··································································41第三章:基站配电安装··················································································42第四章:室内装修·························································································43第八部分:标签规范中国联通广西分公司移动网主体工程安装施工技术规范中国联通有限公司广西分公司2第一部分:基站类型野外宏站野外分布基站中国联通广西分公司移动网主体工程安装施工技术规范中国联通有限公司广西分公司3(楼顶)室外宏站室外分布基站中国联通广西分公司移动网主体工程安装施工技术规范中国联通有限公司广西分公司4室内宏站室内分布基站中国联通广西分公司移动网主体工程安装施工技术规范中国联通有限公司广西分公司5分布基站RRU安装MiNi基站中国联通广西分公司移动网主体工程安装施工技术规范中国联通有限公司广西分公司6第二部分:设备机架的安装固定一概述1.1描述【目的】本书包含了设备机架安装所有的准备工作、施工方法以及注意事项,也包括设备布局的一般原则。【设备】适用于所有通信机房。【应用】适用于所有新建、扩容、搬迁工程。1.2要求与指标1.2.1要求1.必须按照设计图来安装;2.各机架应安放水平、垂直、牢固;3.安装后各机架应相互紧靠(除设备要求留有间隙外)整齐有序;4.机房整体布局合理;5.安装完成后,应确保机房干净卫生、余料退至仓库。1.2.2指标1.水平偏差:安装设备机架允许水平偏差小于等于千分之一;2.垂直偏差:安装设备机架允许垂直偏差小于等于千分之一;3.昀大间隙:同一列机架的设备面板应成一直线,相邻机架的缝隙应小于等于3mm;4.螺栓要求:紧固为止,螺杆超出螺帽不少于2-3丝;二安装要求2.1概述2.1.1方案确定2.1.1.1机架布置1.基站布局要符合基站安装设计要求,严格按照设计图纸摆放、安装;2.室内机架安装要由良好的垂直度;3.同一列机架应成一条直线,无明显参差不齐;4.同类型机架高度一致,无明显偏差;5.相邻机架之间不要留空隙(除设备要求留有间隙外);6.机架门口、通风口、散热口与墙壁之间的距离原则不少于1米;机架离馈线窗尽可能近,以减少馈线长度;仔细研究图纸,确定电池的尺寸和安装位置;基站布局要符合基站安装设计要求,实际安装时以施工图设计为准。图一中国联通广西分公司移动网主体工程安装施工技术规范中国联通有限公司广西分公司72.1.1.2加固方式:1.机架的固定分没有防静电地板和有防静电地板两种情况,其加固方式有所不同;2.没有防静电地板时,又分为需要对地绝缘和不需要对地绝缘两种,不需要对地绝缘时,加固机架必须在地板上使用膨胀螺栓,该膨胀螺栓的型号和强度必须符合机架要求并加固;3.需要对地绝缘时,加固机架前必须先安放绝缘板,使绝缘板上的固定螺丝孔和机架设备的固定孔吻合,然后再使用膨胀螺栓,该膨胀螺栓的型号和强度必须符合机架要求并紧固;图一4.有防静电地板时,则须采用地架固定方式。地架制作要求地架上端与防静电地板表面平齐,地架强度必须符合要求并牢固。昀后将基站机架固定在地架上;5.机架必须按照该设备固定要求进行固定,每个固定点须加垫绝缘垫片以保证机架与地绝缘,防止多点接地。2.1.2人员配置2.1.2.1人员:设备机架安装需2人及2人以上操作,所有人员应接受过安全、工具使用及现场培训。2.1.2.2分工协作:1.移动机架、丈量画线及定位需2人配合完成;2.打孔时,1人负责打孔,另1人随时清理灰尘;3.安装机架时,2人配合调整机架、紧固螺丝。2.1.3注意事项挪机架:无论是在搬运或安装时须移动机架,要做到以下几点:1.移动机架之前,应检查机架内是否有未固定部件,机架门是否关紧,以免设备损坏或损伤;2.用力点必须在设备框架上,严禁用裸露在机壳外面的射频部件作为搬运点;3.动作要轻、平稳,确保机架内部的设备完好无损;4.不得碰撞门窗或墙壁,不得损伤机架漆皮,以确保机架外壳不要损伤;5.确保机架远离有电设备或带有静电的设备;6.防止其它异物落入或进入机架;7.在机房内平移机架时不得损伤地面及保护层。打孔:1.打孔时,人员和设备应与打孔点保持一定距离,避免人员和设备受到损伤;2.要注意使用的钻头的大小与膨胀螺栓相匹配;3.要注意使用的钻头的型号与所钻的物质或地板相匹配;安装:1.所有机架应安装在走线架正下方,走线架一面与所有设备正面平齐,对于BTS设备存在后出线方式的情况,允许设备正面平齐面超出走线架5CM,以保证整列设备美观)。中国联通广西分公司移动网主体工程安装施工技术规范中国联通有限公司广西分公司82.应保证后续工序(如:连接信号线、射频线、布放地线等)的可操作性;3.安装机架一定要调平;4.带电仪器或工具不要触及机架内部,并注意防静电;5.需要内部固定时,注意不要损伤内部配件;6.安装后的所有机架都应整齐划一,同类机架高低一致,并紧靠一排;7.安装机架应稳固,与地面加固应符合施工图设计的抗震要求。2.2机架画线、定位2.2.1程序按照基站安装设计图丈量机架安装点,确定各个打孔位置。若地板不平或墙壁不平造成测量不准确时,可以试放机架,以求安装的昀佳效果。2.2.2步骤丈量画线:根据机架的设计图,用米尺丈量机架的两个面距其对的墙壁距离,确定出机架所在的位置。当机架安装位置与馈线入孔洞不相符时,改变孔洞又困难而需要变更机架位置时,应征得设计单位与建设单位、监理单位同意,并办理设计变更手续。试放机架:把机架移至前面丈量出的位置,看是否与其它一排的机架保持在一条线上,若在,用笔在地板上绘出各个打孔点。定位:移走机架,会看到固定机架的各个打孔点,不清晰可用笔加重一下。图一图二图三2.3打孔及安放膨胀螺栓2.3.1程序选择适合的钻头,在打孔点上钻孔,清理干净钻出的灰尘,安放膨胀螺栓并加以固定。2.3.2步骤打孔:中国联通广西分公司移动网主体工程安装施工技术规范中国联通有限公司广西分公司9打孔要保持竖直,选择的钻头大小与型号要合适,打孔的深度要以膨胀螺栓为准,灰尘要同时用吸尘器吸干净。图一图二安放膨胀螺钉:1.用螺丝对膨胀螺栓加以固定;2.安放的膨胀螺栓要与地板平齐,稍低的可以使用垫片;3.螺杆超出螺帽不少于2-3丝。图三2.4机架安装、调平、装配及固定2.4.1程序在机架定位时,保证同在一列的设备的面板要在同一水平面上;在机架未固定前,先检查机架侧面与地板是否垂直,或用吊线锤或用水平尺,等保证垂直时,再加以固定。2.4.2步骤安放机架:安放好膨胀螺栓后,把机架移至安装位置。移动时要做到平稳安全。调平:1.调平是机架保持竖直和同一排机架面板保持在同一平面的基础。在调平过程中一般加用垫片来使机架底板水平。同时也要求水平尺要在机架底板上测量,方便和易于观察。2.安装设备机架允许垂直偏差小于等于千分之一。3.同一列机架的设备面板应成一直线,相邻机架的缝隙应小于等于3mm。固定:调平之后就可以固定了,固定时各固定点要加绝缘垫片,以防止多点接地;各点要均刀固定。中国联通广西分公司移动网主体工程安装施工技术规范中国联通有限公司广西分公司10图一图二图三第三部分:电池组的安装固定一概述1.1描述【目的】本文介绍了基站蓄电池组的安装要求、施工方法和施工过程中的注意事项。【设备】适用于所有通信机房。【应用】适用于所有新建、扩容、搬迁工程。1.2要求与指标1.严格按照基站安装设计图施工;2.电池支架应安放水平、垂直、牢固;3.安装后各电池正负极板连接准确、牢固、整齐有序;4.电池组整体布局合理;5.所有连接点必须牢固,不能裸露。6.安装完成后,应确保机房干净卫生、余料退至仓库。二安装要求1安装要求1.1方案确定1.仔细研究图纸,确定电池的尺寸和安装位置;2.确定电池支架的安装固定方式;3.确定电池出厂说明书中性能描述和注意事项描述;4.与相关人员(建设单位、监理单位)做昀终确认。1.2人员配置需2人操作,所有人员应接受过安全、工具使用及现场培训。中国联通广西分公司移动网主体工程安装施工技术规范中国联通有限公司广西分公司111.3注意事项搬动:1.搬动电池时不得碰门窗或墙壁等,不得损伤的漆皮;2.严禁使用电池的连接头作为搬运点,严禁倒置或过度倾斜、碰撞等;3.在机房内平移时,不得损伤地面及保护层。连接:1.连接用的扳手把柄一定要用绝缘胶布包起来;2.电池的连接一定要符合基站和基站配电柜的供电要求;3.极性一定要连接正确;必须符合电池的连接规范;4.电池的连接接头固定要牢,涂上导电黄油(凡士林)并加防尘盖;5.电池的连接必须采用专用连线;6.保证同一列的电池在一条直线上;7.必须在空载条件下连接。2电池支架安装2.1步骤1.按照设计图选择位置和安装点;2.在支架上选择接地点并打孔,为将来接地做准备;图一图二3.组装支架;4.安装支架;5.安装电池架保护地接地线。用25mm²电缆将电池架接地线连接在保护地排上,严禁就近接到走线架上。6.两组电池支架间使用25mm²电缆以圆弧型串连,保证连线长度略大于支架间距离;电缆不允许出现折角。2.2注意事项1.接地孔的大小要根据实际情况比如接地线径的大小决定;2.打好接地孔后及时用导电油一类保护,防止生锈;3.铺放时注意保证支架水平和牢固。中国联通广西分公司移动网主体工程安装施工技术规范中国联通有限公司广西分公司12图一3电池摆放3.1步骤1.将电池摆放在规定位置,确保电池极性相对应;图一图二2.用厂商随货一起到达的标签标识电池序号;3.2注意事项1.电池摆放好后间隔要求基本相等,与电池间的连接线长度相符;2.顺序标签标注位置一致,便于观察;3.注意防止其他金属物、异物落入支架;4.电池的摆放方向一致;5.同列电池在一条直线上,不同列间要相互平行。4电池连接4.1步骤1.检查电池组是否符合连接要求,包括设计要求、供电要求;2.检查确定各块电池的极向,电池连接极性不正确,可能会酿成事故例如损坏电池;3.电池连接前必须使用万用表测量单块电池电压是否符合厂商标准,并且记录各单块电池电压,若发现电池单体
本文标题:中国联通广西分公司移动网主体工程安装施工技术规范_试行
链接地址:https://www.777doc.com/doc-1293511 .html