您好,欢迎访问三七文档
当前位置:首页 > 商业/管理/HR > 质量控制/管理 > 饲料车间超高模板专项施工方案
第1页共44页DDGS车间(13.5m)高支模专项施工方案工程名称:黑龙江省盛龙酒精有限公司特优级食用酒精技术改造升级项目建设单位:黑龙江盛龙酒精有限公司监理单位:哈尔滨工业大学建设工程项目管理公司施工单位:黑龙江省九建建筑工程股份有限公司编制日期:2016年3月20日第2页共44页目录一、编制说明···················································································3二、编制依据···················································································3三、工程概况···················································································3四、高支模支撑体系设计····································································41、梁和楼板模板高支撑架的构造和施工要求··········································42、顶梁板模板高支架体系设计图·························································6五、高支模支撑体系的施工·································································81、材料选择····················································································82、施工方案选择··············································································83、高支撑模板的安装········································································94、高支撑模板的拆除······································································11六、高支模支撑体系计算书·······························································11计算书1:一层顶板支撑体系····························································11计算书2:一层顶梁支撑体系····························································20七、高支模施工组织机构··································································34八、质量控制·················································································34九、安全文明施工···········································································37十、环境保护措施···········································································38十一、监测措施··············································································38十二、针对高支模混凝土浇筑制定的措施·············································39十三、应急救援预案········································································39第3页共44页一、编制说明1、本工程一层B轴-D轴/2轴-12轴层高13.5m,属于高支模工程设计的范围,故本方案梁板从支撑体系设计、施工及保证措施等方面进行编制。二、编制依据1、《建筑施工模板安全技术规程》(JGJ162-2008)2、《建筑施工扣件式钢管脚手架安全技术规范》(JGJ130-2011)3、《混凝土结构设计规范》GB50010-20104、《建筑结构荷载规范》(GB50009-2012)5、《钢结构设计规范》(GB50017-2003)6、《建筑施工手册》第四版7、《建筑施工计算手册》8、《建筑施工门式钢管脚手架安全技术规范》JGJ128-20109、《建筑施工模板安全技术规范》(JGJ162-2008)10、《施工技术》三、工程概况1、总体概况项目内容1工程名称黑龙江省盛龙酒精有限公司特优级食用酒精技术改造升级项目2工程地址黑龙江省哈尔滨市双城区站北工业区盛龙酒精有限公司院内3建设单位黑龙江盛龙酒精有限公司4设计单位吉林石化工程设计有限公司5监理单位哈尔滨工业大学建设工程项目管理公司6施工单位黑龙江省九建建筑工程股份有限公司第4页共44页2、建筑概况序号项目内容1占地面积2建筑层数3建筑高度3、结构概况序号项目内容1基础形式静压管桩基础,桩型采用预应力高强混凝土管桩2机构体系框架结构3结构材料钢筋混凝土4抗争等级抗震设防类别为丙类,抗震设防烈度为6度,框架抗震等级为三级四、高支模支撑体系设计1、梁和楼板模板高支撑架的构造和施工要求1.1模板支架的构造要求:1.1.1梁板模板高支撑架可以根据设计荷载采用单立杆或双立杆;1.1.2立杆之间必须按步距满设双向水平杆,确保两方向足够的设计刚度;1.1.3梁和楼板荷载相差较大时,可以采用不同的立杆间距,但只宜在一个方向变距、而另一个方向不变。1.2立杆步距的设计:1.2.1当架体构造荷载在立杆不同高度轴力变化不大时,可以采用等步距设置;1.2.2当中部有加强层或支架很高,轴力沿高度分布变化较大,可采用下小上大的变步距设置,但变化不要过多;1.2.3高支撑架步距以0.9--1.5m为宜,不宜超过1.5m。1.3整体性构造层的设计:1.3.1当支撑架高度≥20m或横向高宽比≥6时,需要设置整体性单或双水平加强第5页共44页层;1.3.2单水平加强层可以每4--6米沿水平结构层设置水平斜杆或剪刀撑,且须与立杆连接,设置斜杆层数要大于水平框格总数的1/3;1.3.3双水平加强层在支撑架的顶部和中部每隔10--15m设置,四周和中部每10--15m设竖向斜杆,使其具有较大刚度和变形约束的空间结构层;1.3.4在任何情况下,高支撑架的顶部和底部(扫地杆的设置层)必须设水平加强层。1.4剪刀撑的设计:1.4.1沿支架四周外立面应满足立面满设剪刀撑;1.4.2中部可根据需要并依构架框格的大小,每隔10--15m设置。1.5.顶部支撑点的设计:1.5.1最好在立杆顶部设置支托板,其距离支架顶层横杆的高度不宜大于400mm;1.5.2顶部支撑点位于顶层横杆时,应靠近立杆,且不宜大于200mm;1.5.3支撑横杆与立杆的连接扣件应进行抗滑验算,当设计荷载N≤12kN时,可用双扣件;大于12kN时应用顶托方式。1.6.支撑架搭设的要求:1.6.1严格按照设计尺寸搭设,立杆和水平杆的接头均应错开在不同的框格层中设置;1.6.2确保立杆的垂直偏差和横杆的水平偏差小于《扣件架规范》的要求;1.6.3确保每个扣件和钢管的质量是满足要求的,每个扣件的拧紧力矩都要控制在45-60N.m,钢管不能选用已经长期使用发生变形的;1.6.4地基支座的设计要满足承载力的要求。1.7.施工使用的要求:1.7.1精心设计混凝土浇筑方案,确保模板支架施工过程中均衡受载,最好采用由中部向两边扩展的浇筑方式;第6页共44页1.7.2严格控制实际施工荷载不超过设计荷载,对出现的超过最大荷载要有相应的控制措施,钢筋等材料不能在支架上方堆放;1.7.3浇筑过程中,派人检查支架和支承情况,发现下沉、松动和变形情况及时解决。2、顶梁板模板高支架体系设计图2.1一层高支模立杆、斜撑布置平面图第7页共44页2.2一层高支模剪刀撑布置平面图2.3一层顶板高支模支架立面图第8页共44页2.4一层顶梁高支模支架立面图五、高支模支撑体系的施工1、材料选择1.1顶梁板模板选用15mm厚胶合板,顶梁板支撑系统采用钢管脚手架,支架上放可调油拖,顶梁板模板的主龙骨采用Φ48×3.0钢管,次龙骨选用40mm×70mm木方,大于500mm梁选用直径14的对拉螺栓。2、施工方案选择2.1一层顶板2.1.1立杆(支撑钢管):横向间距600mm,纵向间距600mm,步距1200mm,每个立杆(钢管)上放置油拖。2.1.2托梁:油拖上放置托梁,托梁采用2根直径48*3.0钢管,做为顶板的主龙骨,间距为600mm。2.1.3次龙骨:托梁上放置40mm*70mm木方,立向放置,做为次龙骨,间距为250mm。第9页共44页2.2一层顶梁2.2.1梁下立杆(支撑钢管):横向间距600mm,纵向间距600mm,步距1200mm。2.2.2梁下外楞(主龙骨):选用直径48*3.0钢管,纵向间距600mm。2.2.3梁下内楞(次龙骨):选用40mm*70mm木方,梁下设3根。2.2.4梁侧面外楞(主龙骨):选用直径48*3.0钢管,纵向间距500mm。2.2.5梁侧面内楞(次龙骨):选用40mm*70mm木方,梁下设4根。2.2.6对拉螺栓:梁高大于500mm增设直径14的对拉螺栓,间距500mm,外侧用直径48*3.0双钢管进行加固。2.5加强层:在支撑架的顶部和底部(扫地杆的设置层)设单向水平加强层,单水平加强层可以每5米沿水平结构层设置水平斜杆或剪刀撑,且须与立杆连接。2.6剪刀撑:沿支架四周外立面应满足立面满设剪刀撑,中部按每隔10m设置。3、高支撑模板的安装3.1、模板安装的一般要求:3.1.1模板安装前,必须核查轴线和模板定位线的尺寸,确保梁、板、柱模板定位准确。同时,对相关工种的上一道质量进行检查,如发现钢筋位移或下层混凝土表面的松软层未剔凿者,应先处理好当前工序后再支模板。3.1.2模板安装要遵守施工规范和工艺标准的要求,确保模板与轴线位置、标高、垂直准确,支撑牢固稳定和结构构件尺寸准确,不跑模、不涨模、拼缝严密、不漏浆、不错台,不位移、不变形。3.2顶板模板安装;3.2.1顶板模板安装工艺流程:弹线(在墙柱上测出50线和轴线控制线)→搭设支架→安装大龙骨→安装小龙骨→调整模板下皮标高→铺设面板→检验板面标高平整度与梁侧模板连接的密实牢固和平整度→清扫→预检3.2.2顶板模板的支撑架,从边跨一侧开始安装,先安第一排立杆,临时固定后再安第二排立杆,同时安装好横杆两道,依次逐排安装,调整立杆标高,安第10页共44页装主次龙骨并找平。铺装竹胶板,从一侧开始,模板交接处硬拼拼缝。3.2.3顶板与梁侧模板连接时,采用搭接方法并在阴角处设有木方,不得设悬挑面板,同时应保证顶板与梁梆垂直,不得出现凹凸错位现象。3.2.4板模板起拱:起拱高度为全跨长度的2L/1000。中间部位起供,周边不起供。注意在起供过程中容易出现的问题是中间部分油托向上升,其他部位的油托会出现松动的现象,所以要注意中间部位油托上升其他油托同样要逐一检查,保证起供顺畅,支撑稳固。3.3梁模板的安装3.3.1先在柱上弹出轴线、梁位置线和水平控制标高线,按设计标高调整扣件式脚手架可调顶托的标高,将其调至预定的高度,然后在可调顶托的托板上安放木方及梁底,并拉线找平。现
本文标题:饲料车间超高模板专项施工方案
链接地址:https://www.777doc.com/doc-1384989 .html