您好,欢迎访问三七文档
当前位置:首页 > 建筑/环境 > 建筑制度 > 【免费工程实用表格】板式楼梯计算表
第1页共127页浙江省大成建设集团有限公司路桥工程公司AQ/LQ-09-2011浙江省大成建设集团有限公司路桥工程公司安全标准化安全技术交底汇编(范本)2011-09-15发布2011-09-15实施编制:许伟恒审核:金建良批准:纪均安第2页共127页浙江省大成建设集团有限公司路桥工程公司使用说明1.公司组织编制的《安全技术交底范本》可作为各项目部在安排安全生产工作前编写分部、分项工程交底的参考资料;2.各项目部在编写安全技术交底时,要根据分部、分项工程的工作内容、部位、作业环境以及天气情况编写;3.参考资料中相关条款根据具体工程情况参考使用,与上级规定有违背之处执行上级规定;4.每一个作业活动的安全技术交底必须细致、全面、有针对性,需要绘制示意图时,须由编制交底人依据规范和现场实际情况绘制;5.交底程序:项目部总工做分部、分项工程总交底。向班组长交底,班组长依据书面交底口头向施工人员进行交底。交底完成后,所有接受交底人员必须在交底书上面签字并交由项目部安全管理员存档;6.安全技术交底的执行原则是谁交底谁负责监控交底的运行情况,作到及时跟踪检查;7.安全技术交底须根据工程实际需要编写,由交底人填写齐全,并一式多份,其中交底人、接交底人、安全员必须人手一份;8.各工种安全操作规程附后,编写交底时可随时参阅;第3页共127页目录一、安全技术交底(范样)································6AQ/LQ/JD1、钢筋作业··········································6AQ/LQ/JD2、砼施工作业········································10AQ/LQ/JD3、木工支模作业······································13AQ/LQ/JD4、砌筑工程作业······································14AQ/LQ/JD5、脚手架搭设、拆除作业······························17AQ/LQ/JD6、土方开挖作业······································19AQ/LQ/JD7、大模板施工作业····································21AQ/LQ/JD8、清理、清运作业····································24AQ/LQ/JD9、拆除工程作业······································26AQ/LQ/JD10、回填土作业·······································29AQ/LQ/JD11、电焊作业······································31AQ/LQ/JD12、临时用电作业·····································33AQ/LQ/JD13、冬季施工用电作业·································35AQ/LQ/JD14、雨季施工用电作业·································37AQ/LQ/JD15、气焊、气割作业···································39AQ/LQ/JD16、圆盘锯使用·······································41AQ/LQ/JD17、汽车吊吊装作业···································43AQ/LQ/JD18、信号指挥作业·····································45AQ/LQ/JD19、机具切割作业·····································46AQ/LQ/JD20、路基工程作业·····································48AQ/LQ/JD21、路面工程作业·····································51AQ/LQ/JD22、推土机、装载机作业·······························53AQ/LQ/JD23、大临设施施工作业·································56AQ/LQ/JD24、放线测量作业·····································58AQ/LQ/JD25、场内运输作业·····································59AQ/LQ/JD26、沥青作业·········································60第4页共127页AQ/LQ/JD27、高空坠落预防·····································61AQ/LQ/JD28、高处作业·········································62AQ/LQ/JD29、悬空作业·········································63AQ/LQ/JD30、龙门、架桥机、电动葫芦作业·······················66AQ/LQ/JD31、打桩机械作业·····································68AQ/LQ/JD32、下部结构施工作业·································71AQ/LQ/JD33、电气防火作业·····································73AQ/LQ/JD34、预应力施工作业···································74AQ/LQ/JD35、混凝土砂浆作业作业·······························76AQ/LQ/JD36、钢筋冷拉机作业···································78AQ/LQ/JD37、钢筋调直机作业···································80AQ/LQ/JD38、钢筋对焊机作业···································81AQ/LQ/JD39、钢筋切割机作业···································83AQ/LQ/JD40、钢筋弯曲机作业···································85AQ/LQ/JD41、空气压缩机作业···································87AQ/LQ/JD42、梁板安装作业·····································89AQ/LQ/JD43、构件吊装作业·····································91AQ/LQ/JD44、龙门吊操作员作业·································93AQ/LQ/JD45、钻孔桩机作业·····································94AQ/LQ/JD46、机械翻斗车作业···································96AQ/LQ/JD47、振动沉桩机作业···································97AQ/LQ/JD48、土石方机械作业···································99AQ/LQ/JD49、爆破工程作业····································101AQ/LQ/JD50、土石方工程作业··································103AQ/LQ/JD51、泵送混凝土作业··································105AQ/LQ/JD52、支架施工工程作业································107AQ/LQ/JD53、挖土工程作业····································108AQ/LQ/JD54、回填土工程作业··································110第5页共127页AQ/LQ/JD55、防护砌筑工程作业································111AQ/LQ/JD56、桥梁台身工程作业································112AQ/LQ/JD57、灌注桩工程作业··································113AQ/LQ/JD58、地基与基础工程作业······························114AQ/LQ/JD59、预应力管桩作业··································116AQ/LQ/JD60、门式钢管脚手架搭设作业··························118AQ/LQ/JD61、钢筋高处绑扎作业································120第6页共127页AQ/LQ/JD1浙江省大成建设集团有限公司路桥工程公司钢筋作业安全技术交底记录表分项工程名称作业单位交底部门施工期限年月日至年月日交底时间交底地点交底人交底内容:1.进入施工现场人员必须正确戴好合格的安全帽,系好下颚带,锁好带扣;2.作业时必须按规定正确使用个人防护用品,着装要整齐,严禁赤脚和穿拖鞋、高跟鞋进入施工现场;3.在没有可靠安全防护设施的高处(2米以上含2米)和陡坡施工时,必须系好合格的安全带,安全带要系挂牢固,高挂低用,同时高处作业不得穿硬底和带钉易滑的鞋,穿防滑胶鞋;4.新进场的作业人员,必须首先参加入场安全教育培训,经考试合格后方可上岗,未经教育培训或考试不合格者,不得上岗作业;5.从事特种作业的人员,必须持证上岗,严禁无证操作,禁止操作与自己无关的机械设备;6.施工现场禁止吸烟,禁止追逐打闹,禁止酒后作业;7.施工现场的各种安全防护设施、安全标志等,未经领导及安全员批准严禁随意拆除和挪动。一、钢筋绑扎:1.绑扎基础钢筋,应按规定安放钢筋支架、马镫,铺设走道板(脚手板);2.在高处(2米以上含2米)绑扎立柱和墙体钢筋时,不得站在钢筋骨架上或攀登骨架上下,必须搭设脚手架或操作平台和马道。脚手架应搭设牢固,作业面脚手板要满铺、绑牢,不得有探头板、非跳板,临边应搭设防护栏杆和支挂安全网;3.绑扎圈梁、挑梁、挑檐、外墙和边柱等钢筋时,应站在脚手架或操作平台上作业;4.脚手架或操作平台上不得集中码放钢筋,应随使用随运送,不得将工具、箍筋或短钢筋随意放在脚手架上;5.严禁从高处向下方抛扔或从低处向高处投掷物料;第7页共127页6.在高处楼层上拉钢筋或钢筋调向时,必须事先观察运行上方或周围附近是否有高压线,严防碰触;7.绑扎钢筋的绑丝头,应弯回至骨架内侧,暂停绑扎时,应检查所绑扎的钢筋或骨架,确认连接牢固后方可离开现场;8.六级以上强风和大雨、大雪、大雾天气必须停止露天高处作业。在雨、雪后和冬季,露天作业时必须先清除水、雪、霜、冰,并采取防滑措施;9.要保持作业面道路通畅,作业环境整洁;10.作业中出现不安全险情时,必须立即停止作业,撤离危险区域,报告领导解决,严禁冒险作业。二、钢筋加工:(一)冷拉:1.作业前,必须检查卷扬机钢丝绳、地锚、钢筋夹具、电气设备等,确认安全后方可作业;2.冷拉时,应设专人值守,操作人员必须位于安全地带,钢筋两侧3米以内及冷拉线
本文标题:【免费工程实用表格】板式楼梯计算表
链接地址:https://www.777doc.com/doc-138543 .html