连云港市航道处水上ETC系统土建施工工程施工组织设计连云港建港实业有限公司江苏省内河航道网及京杭运河水系智能航运信息服务物联网应用示范工程(船联网)江苏省建设项目——连云港市航道处水上ETC系统土建施工工程施工组织设计连云港建港实业有限公司二〇一五年九月二十二日连云港市航道处水上ETC系统土建施工工程施工组织设计连云港建港实业有限公司目录第1章概述..................................................................................................11.1编制依据·······································································11.2工程概况·······································································11.3施工工期与质量要求························································1第2章施工总体部署....................................................................................22.1工程项目主要目标···························································22.2项目组织机构·································································22.3施工总平面布置······························································62.4拟配备的试验和检测仪器设备表··········································62.5劳动力投入计划······························································7第3章各分部分项工程的主要施工方法....................................................83.1测量控制方案··········································错误!未定义书签。3.2施工工艺流程··········································错误!未定义书签。第4章确保工程质量的技术组织措施......................................................184.1质量目标·····································································184.2项目主要人员质量管理职责·············································194.3质量保证措施·······························································21第5章文明施工及环境保护的措施..........................................................255.1承诺···········································································265.2做好施工作业场区管理···················································265.3做好环境、卫生管理······················································275.4配合环境保护的施工措施················································28第6章安全生产的保证措施......................................................................286.1安全管理目标、指标······················································296.2安全生产管理组织体系···················································296.3安全培训教育制度·························································346.4安全检查制度·······························································356.5安全管理方法及措施······················································36第7章雨季施工技术措施............................................................................417.1技术准备······································································417.2现场准备······································································417.3雨季施工技术措施··························································41连云港市航道处水上ETC系统土建施工工程施工组织设计2连云港建港实业有限公司7.4安全保证措施································································43附件1:项目组织机构图······················································44附件2:项目管理机构人员情况表··········································45附件3:拟配备的试验和检测仪器设备表·································46附件4:拟投入的劳动力计划表·············································47附件5:工程施工进度计划表················································48附件6:施工现场总平面布置图·············································49连云港市航道处水上ETC系统土建施工工程施工组织设计连云港建港实业有限公司第1章概述1.1编制依据1.《东泰分公司303场地改造工程》施工招标文件2.现行有关的技术标准与施工规范(1)交通部《水运工程质量检验标准》(JTS257-2008)(2)交通部《水运工程测量规范》(JTJ203-2001)(3)交通部《水运工程混凝土施工规范》(JTS202-2011)(4)交通部《水运工程混凝土质量控制标准》(JTS202-2-2011)(5)交通部《港口工程地基规范》(JTS147-1-2010)(6)《水运工程测量质量检验标准》(JTS258-2008)(7)《混凝土结构工程施工质量验收规范》(GB50204-2002)(8)国家和地方政府颁布的有关技术法规和规范、本工程的施工图设计说明等有关配套文件。1.2工程概况工程名称:江苏省内河航道网及京杭运河水系智能航运信息服务物联网应用示范工程(船联网)江苏省建设项目——连云港市航道处水上ETC系统土建施工工程。工程地点:云善船闸、善南船闸、新沂河船闸、盐灌船闸工程内容:云善船闸、善南船闸、新沂河船闸、盐灌船闸1.3施工工期与质量要求施工工期:58天质量要求:合格。连云港市航道处水上ETC系统土建施工工程施工组织设计2连云港建港实业有限公司第2章施工总体部署2.1工程项目主要目标1.施工质量目标:按照《水运工程质量检验标准》(JTS257-2008)的要求,本工程质量目标达到合格标准。2.安全争创目标:无重大工程安全事故,杜绝重大火灾、重伤、交通管线、设备等事故。3.文明施工目标:争创文明工地。4.施工工期目标:确保按合同要求完成整个工程施工。2.2项目组织机构我公司将选派富有管理经验和施工经验的技术人员组建项目经理部,以一流的管理、一流的技术,确保本工程在合同工期内顺利完成。项目组织机构与主要职责如下:连云港市航道处水上ETC系统土建施工工程施工组织设计3连云港建港实业有限公司1.项目组织机构图2.主要职责(1)项目经理①是项目管理和机构总体运行的领导者,全面负责项目工程施工全过程的组织、筹划,对工程质量、安全和进度全面负责。②负责贯彻执行国家和行业颁发的各项技术规范、规程和质量管理制度,对项目进行安全、质量、进度管理。③制定项目的总计划,确定工程项目的质量与安全目标,组织建立项目经理项目副经理施工员项目总工程师安全员机管员测量员资料员预算员各施工作业班组材料员质检员项目组织机构图连云港市航道处水上ETC系统土建施工工程施工组织设计4连云港建港实业有限公司项目质量与安全保证体系,并确保体系有效运行。④负责全面有效地履行合同,监督检查项目执行情况。负责组织对项目管理人员的考核。(2)技术负责人①全面负责工程项目技术管理与质量监督工作。②代表项目经理实施与监控项目质量保证体系。③主持编制与组织实施项目施工组织设计与施工计划。④负责组织隐蔽工程与主要项目的验收工作、竣工资料的编制和整理工作。(3)施工员①负责工程整体质量和进度,编制月、周进度计划,及时汇总每天工作进展情况,统计周、月完成的工程量,配合合财部做好每个月的工程量上报、确认工作。制定具体阶段性施工进度计划,报项目负责人批准。②负责协调各工区的施工生产,分配施工任务。负责对施工现场的管理及施工进度的控制,并制定月进度计划及月工程完成情况。③参与对有关施工技术人员进行施工质量、技术和安全交底。④代表项目总工监督管理施工现场的日常工作。(4)安全员①负责施工现场的安全管理,负责制定安全保证措施,负责策划安全管理方面的有关活动。②负责项目的安全控制,对消防保卫等安全问题每月组织一次全面检查,确保实现安全管理目标。③负责项目安全技术的交底工作④负责组织安全学习,搞好安全宣传教育,提高全员职工施工安全意识和技能。督促各工区、班组按时开展安全日活动,布置学习内容,连云港市航道处水上ETC系统土建施工工程施工组织设计5连云港建港实业有限公司检查学习记录,搞好班组的安全基础管理工作。⑤负责组织轻微事故、小事故、轻伤事故的调查处理工作,制定防范措施,杜绝重复事件发生。主动配合及参加上级处理一般事故以上及重伤事故的调查处理工作。⑥经常深入施工现场掌握现场的安全生产情况,组织实施纠正预防措施并验证其有效性,督促职工正确使用个人防护用品。随时向主管经理提供施工现场及安全生产情况。⑦按照上级有关规定,结合施工现场情况,制定防台、防洪、防雷电、安全用电、防暑降温等措施,并督促实施。⑧做好新职工和调换工种的工人上岗前的“三级”教育及民工安全教育。及时制止无证操作行为。(5)质检员①组织进行施工技术交底,检查质检措施的落实情况。②负责制定质检计划,并报项目总工批准。③负责对质量目标的控制,负责施工过程中的试验和检验的具体实施,填写质检记录/文件/资料和分项
本文标题:东泰分公司303场地改造工程组织设计最终版
链接地址:https://www.777doc.com/doc-143110 .html