您好,欢迎访问三七文档
0目录第一章编制依据·······························2第二章工程概况·······························3第一节基本情况·······························3第二节设计概况·······························3第三章总体搭设思路及搭设参数························5第四章施工部署·······························6第一节技术准备·······························6第二节材料准备·······························6第三节劳动力准备······························7第四节组织准备·······························7第五章构造措施·······························8第二节立杆·································9第三节纵向水平杆······························9第四节横向水平杆·····························10第五节剪刀撑·······························10第六节脚手板·······························12第七节连墙件·······························12第八节护拦和挡脚板····························13第六章搭设及拆除技术措施·························14第一节工艺流程······························14第二节搭设施工技术措施··························14第三节拆除施工技术措施··························18第七章检查验收······························19悬挑脚手架施工方案浙江长城建设集团有限公司1第八章安全措施······························25第一节安全管理机构····························25第二节安全管理措施····························25第三节安全技术措施····························26第九章文明施工措施····························29第十章、应急预案······························30第一节危险源辨识·····························30第二节应急组织管理····························30第三节应急技术措施····························31第四节应急材料准备····························30十一、悬挑计算书······························33详见计算书附件·······························33附图···············································································································33悬挑脚手架施工方案浙江长城建设集团有限公司2第一章编制依据1、本工程设计文件;2、《建筑结构荷载规范》GB50009;3、《建筑地基基础设计规范》GB50007;4、《建筑地基基础工程施工质量验收规范》GB50202;5、《钢结构设计规范》GB50017;6、《钢结构工程施工规范》GB50755;7、《钢结构工程施工质量验收规范》GB50205;8、《混凝土结构设计规范》GB50010;9、《混凝土结构工程施工规范》GB50666;10、《混凝土结构工程施工质量验收规范》GB50204;11、《建筑施工扣件式钢管脚手架安全技术规范》JGJ130;12、《建筑施工高处作业安全技术规范》JGJ80;13、《建筑施工安全检查标准》JGJ59;14、危险性较大的分部分项工程安全管理办法(建质[2009]87号文);15、《浙江省长城建设集团有限公司企业标准》ZTB104;16、本工程施工组织设计;注:上述规范填写最新版本号。悬挑脚手架施工方案浙江长城建设集团有限公司3第二章工程概况第一节基本情况序号项目内容1工程名称□□□2工程地址□□□,3工程性质□□□4建设单位□□□5勘察单位□□□6设计单位□□□7监理单位□□□8施工总承包单位浙江省长城建设集团有限公司第二节设计概况建筑设计概况表楼号地下室层数地上层数地下层高/m底层层高/m标准层层高/m屋面高度/m结构设计概况表序号结构概况1主体结构□□□□□基础结构□□□□□3建筑结构安全等级□□□□□结构体系□□□□□4抗震设防类别□□□□□抗震设防□□□□□悬挑脚手架施工方案浙江长城建设集团有限公司4抗震等级烈度5人防抗力级别6基础形式□□□□□7混凝土强度等级□□□□□8钢筋类别□□□□□9结构构件截面尺寸防水板水板板厚□□□□□筏板厚□□□□□独立柱基截面尺寸□□□□□柱截面尺寸(b×h)□□□□□框架梁(b×h)□□□□□楼板厚□□□□□墙厚度□□□□□悬挑脚手架施工方案浙江长城建设集团有限公司5第三章总体搭设思路及搭设参数结合本工程结构形式、实际施工特点,总体搭设思路如下:26#楼:标高31.77米标高以下搭设落地式扣件式双排钢管脚手架。11层楼面(标高31.77m)以上搭设悬挑扣件式双排钢管脚手架,悬挑脚手架用单立杆搭设,搭设高度24m,立杆距结构外沿0.35m,排距(横距)为0.8m,歩距为1.8m,中间增加一道大横杆,纵距为1.5m。27#楼:标高29.37米标高以下搭设落地式扣件式双排钢管脚手架,11层楼面(标高29.37m)以上搭设悬挑扣件式双排钢管脚手架。悬挑脚手架用单立杆搭设24m,立杆距结构外沿0.35m,排距(横距)为0.8m,歩距为1.8m,中间增加一道大横杆,纵距为1.5m。外脚手架为一架三用,既用于结构施工及装修施工,同时兼作安全防护。荷载按结构施工二层同时作业考虑。`悬挑脚手架搭设参数一览表搭设材料钢管Ф48.3mm*3.6mm钢管架体宽度0.8m扣件十字扣件离墙距离0.35m脚手板竹片板步距1.8m立杆纵距1.5m大横杆间距0.35m横距0.8m小横杆间距1.5m基础16#工字钢连墙件材料Ф48.3mm*3.6mm钢管水平间距4.5m竖向间距每层设置,2.9(2.8)m主梁材料16b号工字钢总长度3m—8.5m主梁间距1.5m立杆根数3斜撑材料16#、12#工字钢挑梁连接方式焊接与结构连接方式在结构梁上预埋钢板搭设高度18计算高度18m悬挑脚手架施工方案浙江长城建设集团有限公司6第四章施工部署第一节技术准备项目技术负责人组织项目部管理人员、班组长熟悉图纸,认真学习掌握施工图的内容、要求和特点,同时针对有关施工技术和图纸存在的疑点做好施工记录。通过会审,对图纸中存在的问题,与设计、建设、监理单位共同协商解决,已取得一致意见,并办理了图纸会审记录,作为施工图的变更依据和施工操作依据。熟悉各部位截面尺寸、标高,制定脚手架设计方案和施工节点详图,并做好项目部管理人员以及施工作业班组的安全技术交底工作,交底内容包括:施工部位、施工顺序、施工工艺、构造做法、节点处理方法、工程质量标准、安全施工注意事项、保证质量的技术措施等。并经过现场技术负责人的审核后严格执行。第二节材料准备(1)、脚手架钢管选用目前租赁市场和生产厂家最新生产的48.3mm×3.6mm的钢管(最小壁厚不得小于3.0mm),其质量应符合现行国家标准《碳素结构钢》(GB/T700)中Q235-A级钢的规定。表面平整光滑,无裂缝、结疤、硬弯、毛刺、压痕和深的划道。搭设前进行保养,除锈并统一涂刷成黄色,力求环境美观。(2)、脚手架搭设使用的扣件采用可锻铸铁制作,其材质应符合建设部《钢管脚手架扣件》(GB15831)的要求,规格与钢管匹配。不得有裂纹,气孔,缩松,砂眼等锻造缺陷,出现滑丝的螺栓必须更换,贴和面应平整,活动部位灵活,夹紧钢管时开口处最小距离不小于5mm,扣件在螺栓拧紧扭力矩达到65N.m时,不得发生破坏。(3)、进场使用的钢管、扣件等需有出厂合格证,加盖红章的检测报告复印件,对质量有怀疑的钢管、扣件应送检做试验,并且应有进场验收合格的相关记录。(4)、脚手板应符合现行国家标准《木结构设计规范》GB50005中Ⅱa级材质的规定,脚手板厚度不小于50mm,两端设置直径不小于4mm的镀锌钢丝箍两道。(5)、密目安全网、平网:脚手架外立面必须采用合格的绿色密目网进行全封闭,密目网的质量要求必须符合《GB5725-85》《GB5726-85》相关条目,密目式安全立网自重标准值不低于0.01KN/m2。悬挑脚手架施工方案浙江长城建设集团有限公司7第三节劳动力准备根据建筑施工高处作业安全技术规范《JGJ-91》第2.0.4“攀登和悬空高处作业人员以及搭设高处作业安全设施人员,必须经过专业技术培训及专业考试合格,持证上岗,并必须定期进行体格检查”的要求;脚手架施工前必须认真进行安全技术交底要求,操作人员持证上岗,操作前进行必查的体检,凡患有高血压、心脏病等不能进行高空作业。本工程投入劳动力原则:素质好、安全意识较强、有较高的技术素质,并有类似工程施工经验的人员。本工程配置专职安全员三名,架子工23名,电工2名,塔司4人,均持证上岗。第四节组织准备施工现场以项目经理为首认真组织各部门,全力以赴的开展工作,项目经理对工程质量、施工进度、安全生产、文明施工、工程成本等全面负责。项目部管理组织机构详见下图:悬挑脚手架施工方案浙江长城建设集团有限公司8第五章构造措施第一节悬挑梁悬挑按各部位结构设置悬挑工字钢,挑出结构部分钢梁上电焊二根长约100mmΦ25钢筋,用于固定双排脚手架钢管(立杆钢管套入),楼面板上预埋Φ18圆钢吊环三处,具体位置详见下图。在剪力墙与楼面交接相碰处预留孔为:宽×高=120mm×300mm,预留孔部位不得割断柱子主筋,钢梁要避开主筋;悬挑工字钢按立杆间距1.5m布置(可根据现场实际情况适当调整,如有大调整须通知技术部协商处理),梁上焊短Φ25钢筋作底座,脚手架立杆插入固定,然后绑扫地杆,架体搭设要求和落地式脚手架相同。φ18钢筋地锚≧预埋环位置详图剪力墙处工字钢布置详图结构面结构梁洞口剪力墙16#工字钢剪力墙说明:1、主梁与剪力墙交接部位设置预留洞口,预留洞口尺寸为120*250。2、预留洞口部位竖向主筋不得割断,遇有主筋无法避开现场可适当调整槽钢位置。33、剪力墙浇筑砼前预留洞口部位应采用聚苯板提前预埋,位置要预埋准确。2500悬挑脚手架施工方案浙江长城建设集团有限公司9第二节立杆(1)、脚手架必须设置纵横向扫地杆。纵向扫地杆应采用直角扣件固定在距钢管底端不大于200mm处得立杆上,横向扫地杆应采用直角扣件固定在紧靠纵向扫地杆下方的立杆上。(2)、脚手架立杆除顶层外,其余各层各步接头必须采用对接扣件连接,立杆上的对接扣件应交错布置,两个相临立杆接头不得设在同步同跨内,两相临立杆接头在高度方向错开的距离不小于500mm,各接头中心与主节点之间的距离不应大于600mm;立杆的搭接长度不小于1m,3个旋转扣件固定,端部扣件边缘距杆端距离不小于100mm。(3)、脚手架立杆顶端栏杆高出女儿墙上端1m,高出檐口上端1.5m。第三节纵向水平杆(1)、纵向水平杆应设置在立杆的内侧,采用直角扣件与立柱扣紧,单根杆长度不小于3跨(4.5m)。(2)、两根相邻纵向水平杆的接头不应设置在同步或同跨内;不同步不同跨两相邻接头在水平方向错开的距
本文标题:悬挑脚手架方案
链接地址:https://www.777doc.com/doc-1442209 .html