您好,欢迎访问三七文档
当前位置:首页 > 建筑/环境 > 工程监理 > 大方古城斗姥阁、莲花塘恢复重建工程技术标
111用于明标正本大方古城斗姥阁、莲花塘恢复重建工程(项目名称)/标段施工招标投标文件投标文件内容:技术标投标人:(盖单位章)法定代表人或委托代理人:(签字或盖章)日期:2011年1月21日112目录一、施工方案与技术措施········································································(1)二、质量保证措施和创优计划·································································(26)三、施工总进度计划及保证措施······························································(54)四、施工安全措施计划··········································································(59)五、文明施工措施·················································································(67)六、施工场地治安保卫管理计划······························································(71)七、施工环保措施计划··········································································(72)八、冬季和雨季施工方案·······································································(74)九、施工现场总平面布置·······································································(81)十、现场组织管理机构··········································································(86)十一、与发包人、监理及设计单位、专业分包工程的配合·····························(96)113一、施工方案与技术措施一、工程测量和施工放线认真学习和充分熟悉设计图纸和工程施工部署,并针对本工程的平面布置制定切实可行的测量放线方案和顺序,是确保工程质量,确保工程顺利进行的重要措施和关键工序。1、测量放线方案采用根据总平面图、规划红线以及定位依据,施测出的轴线控制桩制作控制点,以纵横轴线控制点为依据,钉龙门桩和龙门板,将轴线位置标注在龙门板上,作为工程施工的几何尺寸的基准线。2、测量放线1、设立工程测量专业小组,由项目副经理负责。测量小组要专人负责制,项目施工员负责计算、施测轴线和控制点,并配备2名专职放线人员。2、执行一切定位放线均须自检、互检后,由专职质检员验收和项目工程师复验,并经监理、建设单位工程师复核验收。3、放线、验线的依据要原始、正确、有效,做好完善的放线和验线记录。4、项目工程师验线时必须从基准点开始,认真复核检查,不得马虎从事,或以点代面,对轴线要进行闭合验收,减少差误。验线工作完成后,填写定位记录,交由项目经理审核签字,并须由建设单位和监理公司核签。5、复核、验收完毕的各轴线控制点,标高控制点和龙门桩、板要做好保护工作,防止碰撞变形。对基准轴线控制点和标高控制点要做半永久性保护,以便施工过程中的复核使用。3、仪器工具的使用和保管1、使用器具:DJ2-2型光学经纬仪一台和SZ型工程水准仪一台,标尺l50米钢卷尺2把,3米钢卷尺4把,5公斤线坠1只2公斤线坠2只和1公斤。2、线坠2只以及其它辅助工具。3、专人使用,专人保管,专人护理,使用中做到轻拿轻放,正确操作。4、经纬仪和水准仪平时注意使用,加强养护。正常情况下,工程开工前必须检验、校核,施工中每隔二个月检验、校核一次。如有故障,需送专业部门修理后方可使用。1145、钢卷尺要相互校核无误后方可使用,使用中严禁踩蹋和扭曲,使用后及时清理擦油。6、标尺在使用中应认真扶正,使用后严禁乱摔乱放或挤压变形。4、施工放线1、±0.00以下施工放线:(1)土方开挖验槽后,将龙门板上的轴线标高引测到基底上,据此弹出垫层浇筑线并钉好标高控制竹桩。意保护好基础以外的垫层上的轴线墨线,或柱子上。以水平仪测设。的首层外围用垂准线原理进行竖向投测。墨线于混凝土现浇板面上。许的范围内。(2)垫层浇筑完毕后,将经过再次复核的轴线位置用墨线弹在垫层上,并注此轴线墨线将逐步引测到±0.00处,与所代表的轴线位置在基础±0.00处再次校核后用墨线弹在墙和柱上,并标志红色三角,作为上部结构施工的引测依据。2、±0.00以上施工放线±0.00以上施工放线的基准点来自±0.00处的轴线标志和标高标志。向上引升测量的轴线,要经常和±0.00处的基准点校核。(1)根据±0.00处的轴线基准点,用线坠吊线后用墨线将轴线弹在墙身上或柱子上。(2)轴线向上引测要多根轴线同时引测,相互校核。(3)标高向上引测要以一个基准点为准,其它点复核。同层楼面的各标高点以水平仪测设。3、-0.85结构面层定位放线根据本工程所处位置的特点,使用吊线法轴线上引,施工测量时在建筑物的首层外围用垂准线原理进行竖向投测。(1)根据±0.00以下传递到首层地面上的各道主轴线,将首层每道轴线弹墨线于混凝土现浇板面上。(2)检查、复核轴线间的准确度及角方情况,调整轴线偏差,控制在规范允许的范围内。(3)设立原始水准点,轴线测设控制网,做到原始正确完整,并做好记录。二、基础工程施工1151、地基承载力标准值按fka=180Kpa考虑,基坑(槽)开挖后地基承载力如与现实不符,应通知设计单位进行修改设计。基坑(槽)开挖到老土层以下500为持力层,但基础埋深必须满足设计要求。2、地下水对混凝土无腐蚀性,如有,则应符合现行国家标准《工业建筑防腐蚀设计规范》GB50046-95。3、在进行承台和底板施工前,应事先按设计要求对标高和轴线进行校准。4、在浇灌基础砼前,应认真检查基础钢筋及柱插筋的数量,位置要正确,设备管线、底板凹坑有否遗漏,满足防雷接地系统。5、基础底板砼应连续浇捣,其浇捣工序应保证前后砼结合的时间不超过初凝时间,以免形成施工缝,当板厚较大时,应采取必要的施工措施,减小砼内外温差(不大于25°),防止砼收缩裂缝的产生。6、混凝土工程(1)基础垫层除注明外均采用C15素混凝土。(2)基础和现浇构件除注明外均为C25级混凝土,预制构件采用C20级混凝土;屋面均为自防水混凝土,设计抗渗等级S6;构造柱、统过梁、压顶梁、过梁、栏板等,特别注明者外均采用C20;柱(墙)混凝土强度等级高于梁(板)时,且相差>5MPa时,梁(板)柱(墙)节点区混凝土强度等级应与柱(墙)同,不同强度等级的混凝土交界面按图施工;梁柱(含剪力墙暗柱与连梁、转换层大梁)等节点钢筋过密的部位,须采用同强度等级的细石混凝土振捣密实。三、钢筋工程1、钢筋采用HPB235(Ⅰ级钢筋,fy=210N/mm)和HRB335(Ⅱ级钢筋,fy=300N/mm);型钢、钢板、螺栓、吊钩等未注明时均采用Q235钢,所有钢材必须符合国家建筑用钢标准,并经抽样检验合格后方可使用。2、受力预埋件的锚筋应采用HPB235(Ⅰ级钢筋,fy=210N/mm)和HRB335(Ⅱ级钢筋,fy=300N/mm),严禁采用冷加工钢筋;吊环采用HPB235(Ⅰ级钢筋,fy=210N/mm)钢筋制作,严禁使用冷加工钢筋,吊环埋入混凝土的深度不应小于30d,并应焊接或绑扎在钢筋骨架上。3、钢筋锚固长度严格按设计要求执行,当钢筋在混凝土施工过程中易受扰动时,其锚回长度乘以修正系数1.1;在任何情况下,其锚固长度不得少于250mm;116HPB235钢筋受拉时,其末端应做成180°弯钩,弯钩平直长度不应小于3d,当为受压时可不做弯钩。4、纵向受拉钢筋绑扎长度在任何条件下不得小于300mm;纵向受压钢筋,当采用搭接连接时,其受压搭接长度不应小于纵向受拉钢筋搭接长度的0.7倍,且在任何情况下不应小于200mm;轴心受拉及小偏心受拉杆件(如桁架和拱的拉杆)的纵向受力钢筋不得采用绑扎搭接接头,当受拉钢筋的直径d>28mm及受压钢筋的直径d>32mm时,不得采用绑扎搭接接头。同一构件中相邻纵向受力钢筋的绑扎搭接接头宜相互错开,钢筋绑扎搭接接头连接区段的长度为1.3倍搭接长度;凡搭接接头中点位于该连接区段长度内的搭接接头均属于同一连接区段,位于同一连接区段内的受拉钢筋搭接接头面积百分率:对梁类、板类及墙类构件≤25%,对柱类构件≤50%。5、在纵向受力钢筋搭接接头范围内应配置箍筋,其直径不应小于搭接钢筋较大直径的0.25倍。当钢筋受拉时,箍筋间距不应大于搭接钢筋较小直径的5倍,且不应大于100mm;当钢筋受压时,箍筋间距不应大于搭接钢筋较小直径的10倍,且不应大于200mm,当受压钢筋直径d>25mm时,尚应在搭接接头两个端面外100mm范围内各设置两个箍筋。6、纵向受力钢筋机械连接接头宜相互错开,钢筋机械连接接头连接区段内的长度为35d(d为纵向受力钢筋的较大直径),凡接头中点位于该连接区段长度内的机械连接接头均属于同一连接区段。当受力较大处设置机械连接接头时:位于同一连接区段内的受拉钢筋接头面积百分率≤50%,纵向受压钢筋的接头面积百分率可不受限制。机械连接的接头性能应符合《钢筋机械连接通用技术规程》JGJ107-96的A级接头性能,机械连接优先采用钢筋直螺纹套筒接头(本工程d≥22的钢筋采用直螺纹套筒接头)。7、电弧焊所采用的焊条,其性能符合现行国家标准《碳钢焊条》GB5117或《低合金钢焊条》GB5118的规定,连续闪光焊所能焊接的钢筋上限直径,应根据焊机容量、钢筋级别、设计要求等具体情况而定,钢筋焊接质量应符合《钢筋焊接及验收规范》JGJ18-96的要求。8、所有外露铁件均应除锈涂红丹两道,刷防锈漆两度(颜色另定)。9、纵向受力的普通钢筋及预应力钢筋,其混凝土保护层厚度(钢筋外边缘117至混凝土表面的距离)不应小于钢筋的直径;基础中纵向受力钢筋的保护层厚度不应小于40mm,当无垫层时不应小于70mm;板、墙、壳中分布钢筋的保护层厚度不应小于设计数值减10mm,且不应小于10mm;梁、柱中箍筋和构造钢筋的保护层厚度不应小于15mm。填充墙体及其它墙体10、填充墙体及其它墙体应沿框架柱全高每隔400mm设2Ф6拉筋,拉筋伸入墙内的长度,6、7度时不应小于墙长的1/5,且不小于700mm;8、9度应沿墙全长贯通;墙长大于5m时,墙顶与梁应有拉结;墙长超过层高2倍时,应设置钢筋混凝土构造柱;墙高超过4m时,墙体半高处应设置与柱连接且沿墙贯通的钢筋混凝土水平系梁,水平系梁梁厚同墙厚,梁高为250mm,纵筋4Ф12箍筋Ф6@200。11、填充墙体及其它墙体的构造柱位置详各层建筑平面,除注明外,构造柱截面均为240×240纵筋4Ф12箍筋Ф6@200。12、构造柱钢筋在施工主体时上下预留伸出砼面500长,构造柱砼应待框架主体完成后浇灌,且构造柱上端应留出50左右空隙,粉刷墙面时用干硬性细石砼填实。四、墙体:1、本工程选用MU20烧结普通砖,选用100、150、200、250宽A5.0蒸压加气混凝土砌块作填充墙,墙砌体均采用M50水泥混合砂浆砌筑。墙体须按照《砌体结构设计规范》(GB5003-2001)、《混凝土空心小型砌块建筑设计与施工规范》(JGJ14-95)及《多孔砖砌体结构技术规范》(JGJ137-2001)。到顶的非承重墙与楼板交接处应斜砌砌块与楼板顶牢,砂浆应密实,保证砌体与梁板紧密接触。凡水电穿管线、固定管线、插头、门窗框等连接构造及技术要求均由制作厂家提供。与混凝土砌体相接的空心砌块墙体出现不符合砌块模数的小
本文标题:大方古城斗姥阁、莲花塘恢复重建工程技术标
链接地址:https://www.777doc.com/doc-178116 .html