您好,欢迎访问三七文档
当前位置:首页 > 建筑/环境 > 工程监理 > 某国际商业广场工程群塔作业施工方案
中国建筑**国际商业广场工程群塔作业施工方案第1页共7页目录一、编制依据:···············································································2二、工程概况··················································································2三、塔吊位置、性能统计表·································································23.1、位置···················································································23.2、性能指数·············································································33.3、塔吊安装时间及各塔吊关系·····················································3四、防碰撞措施···············································································54.1、设施···················································································54.2、塔吊限位·············································································5五、运转························································································5六、防碰撞安全要求·········································································6七、群塔平面布置图(附图):····························································7中国建筑**国际商业广场工程群塔作业施工方案第2页共7页一、编制依据:1、**国际商业广场施工组织设计2、《塔式起重机安全规程》(GB5144---94)3、《建筑机械使用安全技术规程》(JGJ33-2001)4、由塔吊租赁单位提供的QTZ63型液压自升塔式起重机使用说明书二、工程概况**国际商业广场工程位于芜湖市赭山中路南侧、保兴垾东侧,本工程总用地面积为39334㎡、总建筑面积188693.8㎡;共分A、B、C三个施工分区。其中A、B区及C区部分地下二层,地上裙房五层。1#楼25层、2#楼24层。地下建筑面积49917.3m地上建筑面积138776.5㎡。裙房建筑高度23.7m,1#楼建筑总高度85.5m,2#楼建筑总高度87.7m。结构形式:钢筋砼框剪结构。±0.00相当于绝对标高8.200m。由于本工程地下室施工面积大,施工场地狭窄,以及施工道路东、南、西侧闭口。施工材料水平运输是依靠6台塔吊通过﹙臂长﹚相互传递,然后垂直运输至施工层。为此塔吊首次安装或以后顶升安装高度,应相互错开大于5m,避免塔吊回转半径作业时塔臂碰撞。三、塔吊位置、性能统计表3.1、位置本工程塔吊布置位置及性能要求如下:所有塔吊型号均为QTZ63型塔吊编号中心平面位置锚固位置首次顶升高度(m)1#2-4轴偏东6.300m;2-E轴偏北2.870m8层16层362#3-12轴偏东南2.640m;2-D轴偏东北2.300m8层16层363#2-12轴偏东2.000m;2-N轴偏北5.000m304#1-3轴偏西1.950m;1-B轴偏南4.000m305#1-16轴偏东8.000m;1-F轴偏南2.990m366#1-16轴偏东8.000m;1-F轴偏南2.990m30中国建筑**国际商业广场工程群塔作业施工方案第3页共7页3.2、性能指数QTZ63塔吊的主要技术参数序号项目参数1起重力矩760/870KN.M2大臂有效工作长度51米3平衡臂长度12.06米4最大起重量10T5臂端起重量2.3T6有效起升高度140M7供电容量40KVA8供电电压380V9供电频率50HZ3.3、塔吊安装时间及各塔吊关系3.3.1根据现场实际情况,3#塔吊与6#塔吊已安装完毕,3#、6#塔吊中心位置之间直线距离为94米,其中3#塔吊旋转半径44米,6#塔吊旋转半径50米,当两台塔吊同时施工时,在两台塔吊有效旋转半径内无相交覆盖区,由于两台塔吊之间的距离刚好满足其最大有效旋转半径,但为了保证塔吊安全使用要求,防止由于塔身在风力作用下及安装时产生误差,两塔安装时安装高度已互差5米。根据现场施工计划要求,先进行A区施工,在A区有两台塔吊需要安装,分别是4#与5#塔吊,两塔安装时间在2008年9月20日左右,两台塔吊旋转半径均为50米,两塔中心直线位置为107米,两塔塔身标准节尺寸为1.6m×1.6m,在两台塔吊有效旋转半径内无相交覆盖区,两塔同时施工时在两塔最大旋转半径之间直线距离最小相差7米,满足塔吊安全施工要求。两塔安装完成后,5#塔与6#塔之间直线距离为95米,同时施工时两塔有效旋转半径内最大有5×29米的覆盖区,因此在进行5#塔吊的安装时,5#塔吊应比6#(已安装)塔吊高差不低于5米。5#塔吊与3#塔吊中心之间直线距离为100米,两塔同时施工时在两塔最大旋转半径之间直线距离最小相差6米,满足塔吊安全施工要求。4#塔吊与3#塔吊中心之间直线距离为73米,同时施工时两塔有效旋转半径内最大有21×59米的覆盖区,因此在进行4#塔吊的安装时,4#塔吊应比3#(已安装)塔吊高差不低于5米。4#塔吊与6#塔吊中心之间直线距离为153米,两塔同时施工时在两塔最大旋转半径之间直线距离最小相差53米,满足塔吊安全施工要求。根据施工进度安排,为保证A区按照施工进度计划的要求完成施工任务,B区的施工将要比A区延后3个月左右,因此位于B区的1#塔吊最中国建筑**国际商业广场工程群塔作业施工方案第4页共7页早安装时间为2009年1月,根据塔吊定位图显示,安装时1#塔吊与4#塔吊中心之间直线距离为83米,同时施工时两塔有效旋转半径内最大有17×55米的覆盖区,因此在进行1#塔吊的安装时,1#塔吊应比4#(已安装)塔吊高差不低于5米;1#塔吊与3#塔吊中心之间直线距离为89米,同时施工时两塔有效旋转半径内最大有11×30米的覆盖区,因此在进行1#塔吊的安装时,1#塔吊应比3#(已安装)塔吊高差不低于5米;最后插入施工的区域为C区,其中2#塔吊位于C3小区、6#塔吊(已安装)位于C2小区,2#塔吊的安装时间拟定于2009年2月,根据安装位置2#塔吊与3#塔吊(已安装)中心之间直线距离为78米,同时施工时两塔有效旋转半径内最大有16×51米的覆盖区,因此在进行2#塔吊的安装时,2#塔吊应比3#(已安装)塔吊高差不低于5米;2#塔吊与6#塔吊(已安装)中心之间直线距离为98米,同时施工时两塔有效旋转半径内最大有2×18米的覆盖区,因此在进行2#塔吊的安装时,2#塔吊应比6#(已安装)塔吊高差不低于5米;2#塔吊与1#塔吊中心之间直线距离为125米,在两台塔吊有效旋转半径内无相交覆盖区,两塔同时施工时在两塔最大旋转半径之间直线距离最小相差25米,满足塔吊安全施工要求。2#塔吊与5#塔吊中心之间直线距离为161米,在两台塔吊有效旋转半径内无相交覆盖区,两塔同时施工时在两塔最大旋转半径之间直线距离最小相差61米,满足塔吊安全施工要求。2#塔吊与4#塔吊中心之间直线距离为148米,在两台塔吊有效旋转半径内无相交覆盖区,两塔同时施工时在两塔最大旋转半径之间直线距离最小相差48米,满足塔吊安全施工要求。1#塔吊与5#塔吊中心之间直线距离为151米,在两台塔吊有效旋转半径内无相交覆盖区,两塔同时施工时在两塔最大旋转半径之间直线距离最小相差51米,满足塔吊安全施工要求。3.3.2根据上述分析,各塔吊初次安装安全高度如下:序号塔吊编号塔吊型号工作半径(m)塔吊首次安装高度(m)计划使用日期11#QTZ6350402009-122#QTZ6350402009-233#QTZ634430已安装44#QTZ6350352008-09-1555#QTZ6350302008-09-1566#QTZ635035已安装注:塔吊安装高度从基础面起点3.3.3根据现阶段施工现场塔吊布置情况,3#、6#塔已安装完毕,并已投入使用,在拟安装的2#塔与6#塔之间的C1小区内(4-7)轴~(4-8)轴/(4-D)轴~(4-E)轴之间布设了一台旋转半径为44米的临时塔吊,此塔吊已安装完毕,负责C1小区结构施工垂直运输;塔吊中心距3#塔吊中心直线距离为86米,同时施工时两塔有效旋转半径内最大有2×16米的覆盖区;塔吊中心距6#塔吊中心直线距离为71米,同时施工时两塔有效旋转半径内最大中国建筑**国际商业广场工程群塔作业施工方案第5页共7页有23×60米的覆盖区;此临时塔吊安装高度应比3#、6#塔吊高差不低于5米。根据施工进度计划当进行C3小区施工时应当将此临时塔吊拆除,以保证2#塔吊的安装。四、防碰撞措施4.1、设施为保证各塔在夜间能顺利运行,每台塔吊塔臂、尾端、小车设醒目红旗标志,再设一醒目的红色指示灯并确保足够的照度,使每位塔司能够看清楚自己塔吊与相邻塔吊交会时钩绳位置避免碰撞。4.2、塔吊限位根据现场施工平面图所示,在1#、4#、5#、6#塔吊的旋转半径之内均有施工及生活区临时设施、施工区加工棚等,在6#及临时塔吊的旋转半径之内有赭山东路汀广103及文广128高压输电线及供本工地施工之需的三台高压配电器。为防止塔吊运转作业过程中吊运物件意外下掉砸坏上述临时构筑物及碰撞高压线,现采取如下防范措施:①凡高度在5m以下的临时构筑物(包括原未拆迁的民房:高度不足4m)均按本工程“安全防护方案”搭设防砸棚。②对于高度5m以上的临时构筑物,塔吊在吊运物料时采取限位措施:当大臂转到此区域时,由信号工指挥塔司将小车回收,绕过临时构筑物。严禁带料运行的小车从未采取防护措施的临时构筑物上经过。当临时塔吊或6#塔吊前臂旋转至赭山东路高压线上空时,信号工应指挥塔师将小车回收至本工程施工围墙范围内。除特殊情况外,临时塔吊及6#塔吊应绕开赭山东路高压线区域,并进行限位。施工时两塔吊的后臂朝北,前臂从东到南到西运行,或从西到南到东运行,以防吊钩碰撞高压线。五、运转5.1、塔吊布置及运转区域详见附图。为防止运转时塔吊之间相互碰撞,各塔吊分别加设限位器,固定在自己主旋转扇区。信号工和司机必须注意邻塔的工作状态,正确指挥,避免事故发生。5.2、塔吊吊装停止使用时,行程小车应尽可能收近塔身,以免起吊钢丝绳与相临塔臂发生碰撞。5.3、在吊装过程中,塔吊司机应集中精力操作,严禁酗酒、看各种刊物,听从信号工指挥,确保施工安全。5.4、塔吊吊装使用时,塔司和信号工应注意地面变压器、电线及电闸箱等的位置,不得碰撞,防止发生事故。5.5、塔吊吊装使用时,塔吊行程小车和吊钩及吊物禁止超出施工现场围墙位置,禁止中国建筑**国际商业广场工程群塔作业施工方案第6页共7页在办公区、生活区及未拆迁民房上空停留。5.6、吊装混凝土和各种物料时,与相邻塔行程小车应错开5m以上距离操作。5.7、夜间施工作业面及各塔应有足够的照明设施,高塔要避让低塔。5.8、塔吊司机及信号工应持证上岗,严禁无证操作和指挥。5.9、白天施工时应遵守低塔让高塔的原则,如两塔塔臂在旋转过程中同时进入交叉范围,低塔应提前主动避让,待高塔旋转出交叉范围后,低塔方可继续运转。
本文标题:某国际商业广场工程群塔作业施工方案
链接地址:https://www.777doc.com/doc-194734 .html