深圳市中航广场钢结构工程办公楼钢骨柱吊装安全方案编制人:审核人:审批人:企业名称:中铁建工集团有限公司编制日期:2009年04月27日中铁建工集团有限公司1目录一.工程概况.........................................21.工程名称..............................................22.工程地点..............................................23.建筑面积..............................................24.结构类型:............................................25.地面以上办公楼钢骨柱形式:............................26.办公楼钢骨柱地上部分分节及吊装统计表..................27.塔吊性能表:..........................................38.办公楼钢骨柱及塔吊位置图:............................4二.安全组织保证体系.................................5三.吊装前准备.......................................51.安装准备..............................................52.安装测量..............................................53.机械设备准备:........................................54.劳动力配置............................................6四.钢骨柱吊装.......................................61.吊装前准备:..........................................62.构件吊装:............................................7五.安全保证措施.....................................81.塔吊起吊安全措施......................................82.防止高空坠落安全措施..................................93.防止高空坠物伤人措施..................................94.防止触电、气瓶爆炸措施...............................105.其他安全措施.........................................106.安全事故救援.........................................10中铁建工集团有限公司2一.工程概况1.工程名称:深圳中航广场2.工程地点:深圳中航广场位于深圳市福田区3.建筑面积:约24万平方米4.结构类型:本工程地上建筑含2栋塔楼,其中办公楼结构主体49层,标准层层高4.4米,建筑总高度245.2m,主体结构高度220.8m;公寓46层,层高3.2m,建筑总高度166.1m,主体结构高度161.6m。商业裙楼6层,高度31.0m;地下室4层,总深度19.80米。办公楼结构体系为框架-核心筒结构,在24F、36F以及顶层(49F)设置加强层,框架柱采用钢骨混凝土;公寓结构体系为剪力墙结构,少部分竖向构件在5F进行转换,采用梁式及斜撑转换。在地面以上,设置抗震缝将办公楼与公寓分为独立的抗震单元。5.地面以上办公楼钢骨柱形式:办公楼框架柱采用SRC柱,钢骨截面采用焊接十字型、工字型,钢板厚度25~50;6.办公楼钢骨柱地上部分分节及吊装统计表序号型号规格层数最大层高t最大分节长度m最大单层重量t塔吊吊距(塔吊,吊距m)塔吊起重能力1KZ-SRC-1KZ-SRC-2十1500*380/950*380*28*32F1~F26.66.66.552#25.6;2#,16.910t十1500*380/950*380*25*32F3~F6554.9十1500*380/950*380*25*28F7~F194.44.4十1500*380/950*380*25*25F20~F334.44.4工1500*380*25*32F34~F374.44.42KZ-SRC-1a十1500*380/950*380*45*50F1~F26.66.69.881#18.310t十1500*380/950*380*28*40F3~F6555.75十1500*380/950*380*25*28F7~F194.44.4十1500*380/950*380*25*25F20~F334.44.4工1500×380×25×32F34~F374.44.43KZ-SRC-2a十1500*380/950*380*45*50F1~F26.63.15.042#43.7;1#26.66.2;7十1500*380/950*380*28*40F3~F6555.75十1500*380/950*380*25*28F7~F194.44.4十1500*380/950*380*25*25F20~F334.44.4工1500×380×25×32F34~F374.44.44KZ-SRC-3十1500*380/950*380*28*32F1~F26.66.66.552#34.5;2#98;10中铁建工集团有限公司3KZ-SRC-4十1500*380/950*380*25*32F3~F6554.9十1500*380/950*380*25*28F7~F194.44.4工1500*380*25*32F20~F374.44.45KZ-SRC-3a十1500*380/950*380*45*50F1~F26.66.69.911#11.410t十1500*380/950*380*28*40F3~F6557.72十1500*380/950*380*25*28F7~F194.44.4工1500*380*25*32F20~F374.44.46KZ-SRC-4a十1500*380/950*380*45*50F1~F26.63.14.782#41.26.4t十1500*380/950*380*28*40F3~F6555.66十1500*380/950*380*25*28F7~F194.44.4工1500*380*25*32F20~F374.44.47KZ-SRC-5(q8;j22)十1400*380/950*380*30*40F1~F26.66.67.292#6;1#9.210t十1400*380/950*380*28*40F3~F6555.53工1400*380*32*45F7~F194.44.4工1400*380*28*32F20~F374.44.48KZ-SRC-5(j8)十1400*380/950*380*30*40F1~F26.655.642#43.46.2t十1400*380/950*380*28*40F3~F6555.48工1400*380*32*45F7~F194.44.4工1400*380*28*32F20~F374.44.49KZ-SRC-5(q22)十1400*380/950*380*30*40F1~F26.655.752#40.76.5t十1400*380/950*380*28*40F3~F655工1400*380*32*45F7~F194.44.4工1400*380*28*32F20~F374.44.410KZ-SRC-6H900*380*36*40F1~F66.66.63.32#38.26.8tH900*380*32*36F7~F194.44.4H900*380*25*32F20~F244.4411KZ-SRC-6aH1200*380*45*50F1~F66.66.652#49.25.4tH1200*380*32*36F7~F194.44.4H1200*380*25*32F20~F244.44.412KZ-SRC-7H2250x380x32x40F1~F196.66.65.641#32.56tH2250x380x28x32F20~F374.44.47.塔吊性能表:2#吊距m起重能力t1#吊距m起重能力tMC300MC230A553.3505.4503.9456454.6406.7405357.95355.6309.6306.7中铁建工集团有限公司48.办公楼钢骨柱及塔吊位置图:MC230AR=mmm办公楼钢骨柱吊装平面图MC300R=m中铁建工集团有限公司5二.安全组织保证体系针对现场的具体情况,为快速、安全、优质完成吊装任务,建立以项目负责人为首的安全保证体系,切实落实安全生产责任制,成立安全生产领导小组,并设专职安全检查员,做到分工明确,责任到人。服从项目部安全管理目标网络和安全过程控制,杜绝重大伤亡事故,轻伤负伤率1‰以下。三.吊装前准备1.安装准备:依据施工平面图做好现场临边防护,安全布置电线路及焊接、切割设备;清除钢柱顶混凝土灰渣;设立控制线,并用红色油漆标记。2.安装测量:根据控制线将轴线用尺子及线坠引至下层钢柱柱顶,设置定位卡板。3.机械设备准备:1)现场塔吊:1#塔MC230A-J10;2#塔MC300-K122)现场吊装及焊接设备表:序号机械设备名称型号规格数量国别产地制造年份额定功率(kw)生产能力1直流电焊机ZX5-4002中国2001352气体保护机NBC--5006中国199666(KW)500A3电焊条烘干箱80L4中国19994手拉葫芦3吨5中国20053吨5手拉葫芦5吨5中国20055吨6手拉葫芦10吨5中国200510吨7千斤顶螺旋4中国20055吨8千斤顶螺旋8中国200510吨中铁建工集团有限公司69千斤顶螺旋4中国200515吨4.劳动力配置1)根据工程的具体情况,我公司将挑选有丰富经验和经培训取得上岗证的施工人员组成钢结构吊装队。序号工种人数备注1电工12铆工43电焊工64工长12)工长负责施工指挥、协调各工种间的联系,是施工操作的组织者,对操作质量和安全负直接责任。3)电工负责施工现场的电力供给、电气设备的正常运行和安全使用。四.钢骨柱吊装钢骨柱安装流程:测量放线、清理→构件安装前检验→焊接定位卡板→钢柱吊装→柱脚定位→垂直度、轴线、标高测量并调整钢柱→上节柱与下节柱用连接耳板固定→点焊固定→柱对接焊接→测量监测→测量复测→焊缝探伤检验。1.吊装前准备:1)检查现场机具,确保机具用电安全;2)进入现场人员必须配备劳保措施。3)做好临边防护;4)对全部进场人员做入场培训工作,并做好培训记录,禁止未经安全培训的人员上岗作业;组织各工种学习有关安全操作规程,按规程规定操作施工。在参加吊装过程中设专人配合塔吊吊装,设专职或兼职安全员。5)做好安全技术交底,加强班前与班后的安全技术交底与检查工作,工作人中铁建工集团有限公司7员不准随意远离施工现场,防止意外事故发生;6)起吊时,未焊接牢固和未连接紧固的各种零部件不允许起吊作业。2.构件吊装:1)构件卸车:构件车停于工地西门口,用2#塔吊进行卸车,卸车吊距小于30米(起重能力不小于10吨)。2)钢丝绳选用:起吊钢丝绳采用d206×37+1;采用M30卡环。钢丝绳安全系数验算:6X37+1修正系数φ=0.82钢丝绳破坏拉力为P=219KN双绳钢丝绳拉力:F1~F2层构件最大重量10吨:Q1=10t*0.71=71KN;F3层及以上部分最大重量7.7吨:Q2=7.7t*0.71=55KN构件用于机械起重设备吊装,机械起重用绳安全系数K=5~6F1~F2层吊装安全系数为:K1=P*φ/Q1=219*2*0.82/71=5.
本文标题:钢结构吊装安全方案
链接地址:https://www.777doc.com/doc-1971330 .html