您好,欢迎访问三七文档
水电安装施工方案***************第三建设工程有限责任公司第1页/共29页******************工程水电安装施工方案编制人:审核人:***************第三建设工程有限责任公司水电安装施工方案***************第三建设工程有限责任公司第2页/共29页目录一、概述··············································3二、施工前的准备工作··································4三、给排水安装施工····································41、施工部署··········································42、施工程序··········································53、主要施工方法······································5四、电气安装施工·····································101、施工布署·········································112、施工穿插·········································113、施工程序·········································114、施工方法·········································11五、桥架、电缆施工···································14六、动力、照明配电箱(盘)安装·······················15七、灯具、开关、插座的安装···························15八、劳动力计划·······································16九、主要施工机具计划·································16十、工程质量保证上、防止质量通病措施·················17(一)、严格执行国家强制性标准及行业标准···················17(二)、工程质量保证措施·································171、组织保证措施········································18水电安装施工方案***************第三建设工程有限责任公司第3页/共29页2、技术保证措施······································183、现场材料质量管理措施·······························184、坚持样板制、保证整体施工质量························195、定期质量分析,实施动态管理··························19(三)、安装质量通病防治措施······························19(四)、成品保护措施·····································22(五)、工程质量保证措施·································231、室内给排水······································232、室内电气·······································243、避雷装置·······································25十一、工程工期、安全、文明施工及环境保护措施········25保证工期组织管理措施································25十二、安全生产、文明施工措施························27十三、检验批的划分··································28(一)、给排水安装检验批的划分···························28(二)、电气安装检验批的划分·····························28水电安装施工方案***************第三建设工程有限责任公司第4页/共29页安装工程一、慨述***************,位于重庆市江北区建新西路35号,重庆市嘉陵江北岸,南侧紧邻北滨路,西侧与华宇北国风光小区接壤。本工程由重庆国兴置业有限公司开发,***************第三建设工程有限责任公司承建,重庆市建永工程监理公司监理。本工程为超限高层,框架--核心筒结构,地上42层,地下5层,地上高度165.85m,地下高度21.50m,建筑面积83594.28㎡。本工程室内给水立管采用PSP钢塑复合管,G型和扩口式管件连接,水表后及室内卫生间给水支管采用S4系列PP-R给水管,公称压力等级1.6MPa,热熔连接。本工程污水立管、专用通气管采用柔性铸铁管,W卡箍连接,底层卫生间污水单独排放。1~5层商业污水管道采用UPVC实壁排水管,承插胶水粘接或弹性密封圈连接,高层屋面雨水管采用HRS高层承压专用雨水管,承插连接或胶结,阳台雨水、空调冷凝水、管井废水、多层屋面雨水采用加厚型UPVC实壁排水管,粘接连接。地下室集水井压力排水管采用焊接钢管,焊接和法兰连接。消防电梯排水管采用给水铸铁管。本工程消防火灾自动报警线路及供电线路、控制线路暗敷时穿阻燃PVC管,埋设在楼板或墙内,埋设深度不小于30mm。明敷时穿热镀锌钢管,管外刷防火涂料。桥架水平安装时支架间距不大于1.5m,垂直安装时支架间距不大于2m,安装距地高度大于2.5m。桥架穿越防火分区、楼层、防烟分区时,安装完成后用防火材料封堵。本工程照明和应急照明线路采用阻燃PVC管,埋设在楼板或墙内,埋设深度水电安装施工方案***************第三建设工程有限责任公司第5页/共29页不小于30mm,同类照明不同回路分管敷设。走道、楼梯间、卫生间、车库选用LED光源照明灯,车库灯具安装高度2.8m。电缆采用桥架敷设,电缆出桥架采用热镀锌钢管敷设,所有消防设备的供电线缆采用矿物绝缘电缆。利用所有基础地梁内2根大于Φ10mm钢筋焊接联通作接地极,无地梁处采用40*4热镀锌扁钢焊接联通,防雷接地、电气保护进度共用统一接地极,接地电阻不大于1欧,屋面避雷带采用Φ12mm热镀锌圆钢沿屋面、屋架明设。二、施工前的准备工作1、认真阅读图纸施工前仔细阅读安装工程的平面图、系统图、原理图、施工说明和设计变更等图纸,结合土建工程的建施图和结构图阅读,了解整个工程的全貌,熟悉设计所要求的施工工艺和所涉及的图集和规范。2、施工前的准备根据掌握的图纸情况,组织好施工管理人员和工人,准备好施工中所需要材料、工具和机械设备。三、给排水安装施工1、施工部署该工程集水井为压力排水,管道采用焊接钢管焊接,电梯排水采用给水铸铁管承插连接。给水管道仅施工水表后管段,给水管材为PP-R塑料给水管热熔连接。本工程屋面雨水管采用HRS高层承压专用雨水管,承插胶结。阳台雨水、空调排水、管井废水、多层屋面雨水采用加厚型UPVC实壁排水管,粘接连接。卫生间污水立管、专用通气管采用柔性铸铁管,W卡箍连接。其交叉作业集中在预埋与结构施工、管道安装与建筑施工部份。因此,施工过程中应与土建密切配合,水电安装施工方案***************第三建设工程有限责任公司第6页/共29页管道与墙体、地坪接合处细部处理重点,适时穿插,交叉作业,以保证工程进度及施工质量。给排水施工前期结构阶段以预留预埋为主,后期以安装为主。在整个施工过程中应与土建和其它工种密切配合,做到先预埋准确,后安装到位;先室内,后室外;先地上,后地下;先支吊架,后管道;先分段,后连通。以保证工程进度及施工质量。(1)孔洞预留、套管预埋与主体上升同步进行。(2)室内管道安装与室内抹灰穿插作业,墙面抹灰后,插入立管及给水进户支管安装,楼地面形成后插入排水支管,并加强管道保护达到成品保护要求。(3)洁具安装与卫生间施工穿插进行,并积极配合土建进行孔洞吊补及关水试验。(4)室内埋地管道安装在地坪完成前进行。室外管道安装与环境同步进行。2、施工程序安装准备→预留孔洞、预埋套管→支架安装→立管安装→支管及管道附件安装→室内埋地管道安装→室内埋地管道灌水功能性试验→管网管道系统功能性试验→冲洗及消毒→系统调试→系统验收3、主要施工方法(1)配合土建预留、预埋在给排水施工中,套管的选择、定位及固定,将直接影响到管道安装的质量及工程进度,因此,施工过程中应根据施工图绘制预留预埋固化图,注明预留预埋标高位置、所属系统及其具体尺寸,再核定土建、结构施工图,无误后随土建进度按固化图进行预留预埋。水电安装施工方案***************第三建设工程有限责任公司第7页/共29页开工前应与土建协商分清各自的范围与责任,以免发生错误、遗漏。在配合土建预埋作业中,要进一步核对位置、尺寸,确认无误后,才能进入下一道工序。在浇灌过程中要有专人监护,以防预埋件或套管移位或损坏。①套管的选择:用于填充墙、砼墙体、梁采用钢套管,穿越楼板、穿越屋面、地下室外挡墙及水池采用刚性防水套管。②预留预埋套管的直径比管道直径大两个规格,预留孔洞的尺寸如下表:管道名称给水立管排水立管直径32-50mm直径70-100mm直径小于或等于50mm直径70-100mm孔洞尺寸(mm)150200150200③当预留孔洞、预埋套管与结构钢筋发生矛盾时,不得随意损伤钢筋,在经土建技术人员核验,采取相应措施后再进行安装固定。④在浇灌过程中要有专人监护,以防预埋件或套管移位或损坏。(2)管道安装管道安装前应配合土建检查并确定预留孔洞、预埋套管的位置及尺寸,并检查支架设置的合理性、规范性、牢固性,然后根据工艺流程和网络计划,采用先室内,后室外;先大管,后小管;先主管,后支管;先支、吊架,后安装的原则,适时穿插,交叉作业,当发生交叉矛盾时应该是:小管让大管,无压管让有压管,支管让主管。管道整齐、简洁,并力求管道配件(如水龙头、阀门、检查口等)便于操作,易于维修。①支架制安水电安装施工方案***************第三建设工程有限责任公司第8页/共29页管卡或吊架应选型合理,位置准确,固定牢靠,接触紧密。a、塑料管道的支吊架采用与管道匹配的配套产品。b、角钢支架的断料切割机锯断,禁止采用氧割和电弧焊断料,支架的孔眼必须在台钻上加工,从而保证支架洁净与美观。c、管道除按规范间距设置支、吊架外,管道的各配水点、受力点以及穿墙支管节点处,也应采取可靠的固定措施。d、排水横管的支吊架设置间距如下表:管径(mm)5075100150间距(mm)50075010001500e、根据设计按管道实际标高走向安装管道支、托架,支、托架按管道设计坡度安装,垂直管线采用线坠调直,水平采用挂通线确保平直。f、生活给水水平密集型塑料管道、水平排水塑料管道、排水铸铁管采用金属吊架。排水立管每层距地1.8m设置1个,排水支管吊架安装间距按上表施工,并在相宜管道附件侧设置吊架。②、PP-R塑料给水管连接a、所有管道配件应是甲方指定产品或经设计认可的合格产品,必须有卫生许可证。管道入场时,先经工程监理核查验收后方可使用。b、管道穿楼板时,应设置刚性套管,卫生间和厨房套管高出地面50mm,其余穿楼板钢套管高出地面20mm,并有防水措施。管道穿越屋面时,应采取严格的防水措施。穿越前端应设固定支架。穿过楼板的套管与管道之间缝隙应用阻燃密实材料和防水油膏填实,穿墙套管与管道之间缝隙应用阻燃密实材料填实,端水电安装施工方案***************第三建设工程有限责任公司第9页/共29页面光滑。管道的接头不得设在套管内。c、管道安装时,不得有轴向扭曲,穿墙
本文标题:水电安装施工方案1
链接地址:https://www.777doc.com/doc-197179 .html