您好,欢迎访问三七文档
JZLB9变电站工程监理初检方案220kV阿金变电站新建工程监理初检方案220kV阿金变电站新建工程监理项目部2012年6月批准:年月日审批:年月日编写:年月日目次1工程概述······················································································11.1工程规模及建设情况·······························································11.2工程特点及难点·····································································11.3工程参建单位········································································22验收依据······················································································23验收范围及条件·············································································33.1验收范围··············································································33.2验收条件··············································································44验收组织机构及人员职责·································································44.1验收组织机构设置··································································44.2验收人员职责········································································54.3验收资源配置········································································55验收时间安排················································································56验收要求······················································································56.1验收总体要求········································································56.2各分部(单位)工程验收要求···················································67质量验评及初检报告·······································································118安全措施······················································································119数码照片管理···············································································1210附表··························································································12-1-1工程概述:1.1工程规模及建设情况本期安装180MVA主变压器,终期安装两台240MVA主变压器;220千伏采用户外三相分箱六氟化流全封闭组合电器,本期出线2回,终期出线8回;66千伏本期出线11回,终期出线20回;本期一组、终期两组,66千伏28Mvar电力电容器。串联电抗器采用5%电抗率;消孤线圈,本期在本站安装两台1900千伏安有载调谐消孤线圈。总征地面积12945平方米,建筑面积426.4平方米。1.2工程特点及难点:220kV阿金变电所新建工程是按照“两型一化”标准设计,本工程具有以下特点:1.2.1土建工程部分的主要特点(1)针对主变、220kV、66kV配电装置特点,所内各配电装置区设置界线清晰、简单,整个变电站近似呈矩形,既节约了占地,又方便征地,充分体现了资源节约型总体设计的经济合理性。(2)主控楼布置在220千伏配电装置南侧,进所大门在东侧,采用独立基础,框架结构,现浇混凝土梁板结构。部分预制sp予应力空心板,板上做60厚钢筋混凝土叠合层。(3)220千伏、66千伏GIS设备基础采用现浇钢筋砼,并按规范及设计规定设置变形缝。(4)所内道路:采用公路型砼道路设计。所内主要道路宽为4.5米,通道内转弯半径9米及12米所外道路:采用沥青混凝土两层90厚,道路宽度4.5米,两边设置0.5米路肩,坡度6%以内,路下设置过水涵管及路两侧排水沟。(5)围墙、大门及场平:围墙挡土墙基础采用毛石砌筑,M7.5水泥砂桨主体采用红砖砌筑混水墙抺灰刷涂料,并按典型设计设置标识墙。设置电网及报警装置。场地采用碎石地坪。(6)给排水:在所外采用打井,所内生活污水经处理后(0.5吨)排放所外。场地雨水采用地下排水管网,直接由围墙下的预留孔排出所外排洪沟。(7)消防:采用变压器排油充氮灭火装置,设置事故油池一座并配备适量的推车式和手提式灭火器。-2-1.2.2工程难点:1)工程施工期间场区多专业、多工种的交叉作业,将给安全监理的施工控制带来困难。2)主控楼结构复杂、外墙采取绝缘复合板新型材料;3)节约型GIS基础结构复杂。1.2.3本工程:2011年3月15日开工,2012年6月30日竣工。1.3工程参建单位建设单位:辽宁省电力有限公司建设管理单位:阜新岛供电公司设计单位:辽宁新创达电力设计研究有限公司监理单位:东北电力建设监理有限公司施工单位:东北电业管理局第三工程公司2验收依据:(1)《国家电网公司基建质量管理规定》(国家电网基建〔2011〕1759号)。(2)《国家电网公司输变电工程达标投产考核办法》(国家电网基建〔2011〕146号)。(3)《国家电网公司输变电工程施工工艺示范手册(2006年版)》。(4)《工程建设标准强制性条文电力工程部分(2006年版)》。(5)《电气装置安装工程高压电器施工及验收规范》(GB50147-2010)(6)《电气装置安装工程电力变压器、油浸电抗器、互感器施工及验收规范》(GB50148-2010)(7)《电气装置安装工程母线装置施工及验收规范》(GB50149-2010)(8)《电气装置安装工程接地装置施工及验收规范》(GB50169-2006)(9)《电气装置安装工程盘、柜及二次回路结线施工及验收规范》(GB50171-92)(10)《电气装置安装工程蓄电池施工及验收规范》(GB50172-92)(11)《电气装置安装工程电气设备交接试验标准》(GB50150—2006)。(12)《电气装置安装工程电缆线路施工及验收规程规范》(GB50168—2006)。(13)《电气装量安装工程质量检验及评定规程》(DL/T5161.1-5161.17-2002)(14)《输变电工程安全文明施工标准》(国网科2009-211号)(15)《砌体工程施工质量验收规范》(GB50203-2011)(16)《建筑装饰装修工程质量验收规范》(GB50210-2001)-3-(17)《给水排水构筑物工程施工及验收规范》(GB50141-2008)(18)《建筑给水排水及采暖工程施工质量验收规范》(GB50242-2002)(19)《屋面工程质量验收规范》(GB50207-2002)(20)《建筑地面工程施工质量验收规范》(GB50209-2010)(21)《工程建设标准强制性条文(房屋建筑部分)》(2009年版)(22)《变电站工程投运前电气安装调试质量监督检查典型大纲》(电建质监(2005)57号)(23)《变电站土建工程质量监督检查典型大纲》(电建质监(2005)57号)(24)《输变电工程建设标准强制性条文实施管理规程》(Q/GDW248-2008)(25)《国家电网公司输变电优质工程评选办法》(国家电网基建2011-148号)(26)《国家电网公司电力建设工程施工质量管理办法》(国家电网基建2010-166号)(27)《110kV~1000kV变电(换流)站土建工程施工质量验收及评定规程(Q/GDW183-2008)(28)《国家电网公司输变电工程典型施工方法》(基建质量〔2011〕78号)(29)《国家电网公司输变电工程质量通病防治工作要求及技术措施》(基建质量〔2010〕19号)(30)《关于强化输变电工程施工过程质量控制数码照片采集与管理的工作要求》(基建质量〔2010〕322号)(31)《电力建设工程监理规范》(DL/T5434-2009)(32)《建设工程监理规范》(GB50319-2000)(33)本工程设计文件(含设计变更)(34)建设单位、业主项目部下达的有关文件规定;建设单位与施工、屋子供应商签订的合同,设备出厂资料。3验收范围及条件3.1验收范围3.1.1本次电气安装工程初验的范围包括下列部分的工程实体及相关资料:(1)1台180兆伏安变压器(2)1组66千伏28兆乏电力电容器,串连电抗器采用6%电抗率。(3)站用变2台-4-(4)220千伏GIS12个单元,66千伏GIS28个单元.(5)主控及直流设备(6)全站电缆及二次接线(7)全站防雷及接地装置(8)场区电气照明、视频系统设备(9)通讯系统设备(10)继电保护、自动装置调试、试验(11)高压、常规和特殊试验(12)交接验收。3.1.2本次土建工程初验范围包括下列部分的工程实体及相关资料:(1)主控楼(2)主变及构支架基础(3)屋外配电装置及构筑物(4)屋外电缆沟(5)站内外道路(6)围墙及大门(7)屋外场地工程(8)站用变及构支架(9)室外给排水及雨污水系统建、构筑物(10)220千伏、66千伏构支架(11)消防火灾报警系统3.2验收具备条件(1)施工单位(施工,安装,调试)按设计和规范要求完成相应的施工、安装、调试工作无明显的缺陷和遗留问题。(2)已完工程经施工项目部三级自检合格具备申报验收条件(3)工程各专业应提交的竣工资料基本完整,齐全有效能够满足验收条件。(4)监理已收到施工项目部填报的《工程竣工报验单》及相关自检记录4验收组织机构及人员职责4.1成立220kV阿金变电站新建工程初检验收小组-5-(1)验收领导小组:组长:秦瑞会副组长:李报本、石庆生、李令远(2)验收工作组:组长:秦瑞会副组长:来靖波组员:李天任、李报本、石庆生、李令远配合:史成强、李杰、张春和等人4.2验收人员职责(1)初检验收组组长、副组长职责:负责统筹安排初验收工作,协调处理施工、、监理、设计、等各方关系及验收中出现的重大事宜、争议,负责组织召开验收汇总会,听取各验收小组的工作汇报,对验收中发现的缺陷提出整改指导意见,督促消缺,审核确认验收记录及验收报告。(2)验收小组组长职责:组织本小组人员按验收范围及要求进行各专业工程验收,搜集、汇总验收缺陷及问题,填写验收记录及验收报告。(3)验收小组副组长职责:负责本小组内验收人员的召集、管理工作,组织、参与验收
本文标题:阿金变监理初检方案
链接地址:https://www.777doc.com/doc-2000735 .html