现场临建搭设方案工程名称:朱家湾110/35KV变电所方案名称:朱家湾110/35KV变电所临建搭设方案编制人:审核人:批准:贵州电力建设第一工程公司编制时间年月日目录1.工程概况·················································································32.编制依据·················································································33.活动板房概况···········································································34.选址的基本要求········································································35.搭设的基本要求········································································46.施工准备计划···········································································46.1.施工现场准备····································································46.2.施工技术准备····································································46.3.物资的准备·······································································56.4.劳动力等组织准备······························································57.现场安装·················································································58.安全保证措施···········································································69.彩钢板活动房验收标准·····························································610.注意事项···············································································711.附图·····················································································81.工程概况本次板房分别搭设在主站的西南一号挡土墙边,两层办公室、厨房、厕所,占地面约为300m2。其中办公室占地97.2m2,会议室60m2。厨房26m2(在厨房中设置消防灭火装置),后附平面布置图;2.编制依据1)朱家湾变电所总平面图3.活动板房概况活动板房为轻钢结构简易活动房工程,搭建房屋规格:3600×5400间,局部根据设计搭设情况进行调整。结构设计:彩钢板活动房为轻钢结构,采用方管柱,角铁主梁及连系片梁,楼房下层前后均采用80×80(1.8mm左右壁厚)方管,需要拼接的构件用螺丝拼接,要求满足有关规范手册外,须满足等强、等刚度要求。内墙、封檐及栏杆板均采用50系列EPS彩钢夹芯板,前墙、后墙、山墙采用75系列EPS彩钢夹芯板,顶板采用100系列EPS彩钢夹芯板。屋面与墙体彩钢板采用铝型材和抽芯柳钉相固定。落水系统采用屋面外挑20cm,自由落水。窗采用塑钢窗,门采用50系列EPS彩钢夹芯板门。4.选址的基本要求1)按照施工现场总平面图位置布置,符合安全、消防要求。2)活动房不得设置在高压线下,也不得设置在沟边、崖边、江河岸边、强风口处等影响安全的地点。3)现场活动房实行封闭管理,与作业区、居民区保持有效距离。5.搭设的基本要求1)搭设活动房,必须符合坚固、安全、防潮、保暖、通风明亮和消防安全规定,不影响周边环境要求,方便民工生活,有利于健康。2)活动房应确保主体结构安全,设施完好。活动房应具有抵御7级大风的能力和强度,其搭设高度不宜超过二层,在平坦空旷地宜搭建一层。3)活动房设置可开启式窗户,高度不小于1.2m,宽度不小于1.2m,保证良好的通风条件,室内高度不低于2.6m,宿舍门、窗玻璃齐全,地坪采用硬化措施。6.施工准备计划6.1施工现场准备1)本活动房场地已按照总平面图要求全部清场完毕,且现场场地已经平整好,场内运输道路和施工临时道路已修好。2)施工用电:本工程施工用电采用架空线,在总配电箱中引出,在施工现场设置三个配电箱,所有配电电源均从总配电箱中引出。3)现场施工人员临时住宿,结合施工现场的具体情况,合理安排。6.2施工技术准备积极组织技术人员认真审阅图纸,向施工人员进行搭设方案交底,把工程的设施内容,施工技术要求等向施工人员讲解清楚,落实施工计划。6.3物资的准备根据使用方要求及合同内容,进行施工进度安排组织货源,确定加工,供应地点和供应方式,组织物资计划进场时间,在指定地点按规定方式进行储存和保管。6.4劳动力等组织准备建立精干的施工队伍,挑选施工经验丰富、富有创新精神、工作效率高的施工人员,要认真考虑专业工种的合理配合,按照开工日期和人力的需要组织劳动力,同时进行安全、防火和文明施工等方面的教育。7.现场安装1)首先测量各墙基轴线尺寸是否符合图纸要求,并要求轴线尺寸不应偏差正负25mm,测量墙基高度偏差不应大于正负10mm。2)材料到场先卸货,把材料合理地搬运到各个施工点,做到一步到位,搬运时要轻拿轻放,避免材料损坏,材料合理就位后,对钢构件外形尺寸,焊接质量进行检查后施工。3)根据图纸尺寸,首先埋好底盘铁,用膨胀螺丝和基础固定。4)钢构件拼装,首先将方管柱与钢梁用螺丝逐榀进行拼装,拼装时螺丝必须全部拧紧,检查钢梁是否垂直,是否在同一平面,构件尺寸是否符合规定要求,直至全部满意为止。5)拼装好的钢构件进行逐榀安装,首先撑起第一榀钢梁,钢梁撑起后用方管柱将钢梁支撑牢固,并用铅垂线调整第一榀钢梁,使用与地面垂直,用钢卷尺量准尺寸,然后撑起第二榀,安装同上,接着安装片梁,片梁与主梁用螺丝固定。其余各榀主梁及片梁可按上述步骤全部安装到位,并再次检查钢梁位置是否准确。如有偏差,还需调整。6)确定无误后,用角铁焊接水平支撑及钢梁内的穿架,然后焊接方管柱和底盘铁。7)柱、梁安装结束后,安装楼板。楼板与楼板之间要密实。8)楼板铺好后开始安装墙板,安装墙板时,预留好门窗的位置,待外墙全部安装后,开始安装顶板,盖好顶板后,先将顶板上面的活全部做完,包括做好封檐板,防水处理,屋顶罩子等。9)房屋整体安装结束后进行门窗安装,窗的安装要注意密实,不应与墙板有缝隙,窗户安装完毕后应进行防水处理,门的安装要做的平、直。10)安装楼板和栏杆,要求栏杆平直和栏杆柱连接牢固,楼梯踏步采用花纹钢板或角铁,楼板不应有晃动,楼梯与山墙固定,栏杆板用75mm自钻自攻螺丝与楼梯固定。11)通知使用方浇制上层地坪,安装好电线后,进行下层PVC扣板吊顶,吊好扣板后通知甲方浇制下层地坪。12)工程完工后进行自检。13)会同使用方对房屋进行整体验收。8.安全保证措施1)严格遵守安全生产六大纪律及焊接“十不烧”的规定。2)施工区域必须与外界采取隔离措施。3)进入施工现场人员必须遵守场内安全生产规定。4)施工人员必须带好安全帽,严禁高空抛物。5)所有电动工具要有专人负责,电缆处有保护材料。6)操作过程中必须注意安全和施工质量。9.活动板房验收标准1)彩钢板无明显擦痕和色差。2)彩钢板与其它固定物体连接必须牢固。3)彩钢板垂直偏差不得大于15mm。4)彩钢板与彩钢板之间不得有明显缝隙。5)封檐板安装完后,必须检查密封胶是否涂完整。6)彩钢板与铝材固定时,抽芯柳钉必须排列整齐,间距不得大于400mm。7)塑钢窗安装必须平直与墙板间不能有过大的缝隙,接缝处必须涂密封胶。8)楼梯必须安装牢固,栏杆板要直,不能有偏差。9)安装完毕后原则上应打扫清理一切灰尘、垃圾,保持彩钢板活动房清洁、整齐。10活动房使用及注意事项1)使用方必须按照生产厂家的规定和要求使用活动房,不得超载使用。严禁改变活动房的构件和使用功能。2)每间宿舍居住人员不得超过十二人,严禁在宿舍里打通铺,不得将用具、工具等带入宿舍内,以增加楼面负载。3)不得在宿舍内放置电视机,以防人多聚集观看电视,增加楼面负载,造成安全隐患。11.附图1)现场办公室总平面图布置图2)现场办公室一层平面图3)现场办公室二层平面图4)现场厨房、厕所平面图
本文标题:现场临建搭设方案
链接地址:https://www.777doc.com/doc-2192756 .html