您好,欢迎访问三七文档
当前位置:首页 > 建筑/环境 > 工程监理 > 模板及清水模板施工方案
长寿晏家乐至·尚城七期十标段项目模板工程专项方案1目录1编制依据·······························································22工程概况·······························································33劳动力准备······························································34技术准备·······························································45施工工艺流程···························································46主要施工方法···························································47施工技术要求··························································158模板系统验算·························································169模板拆除······························································3210质量保证措施及注意事项··········································3311成品保护措施························································3512、安全文明施工········································3513环保措施·························································3914项目施工组织管理体系框架图···································4015模板工程质量控制程序图··········································42长寿晏家乐至·尚城七期十标段项目模板工程专项方案2模板及清水模板施工方案本工程我司施工要求混凝土施工质量达到中级抹灰的质量标准,故应按清水混凝土的标准来组织施工。1编制依据序号资料名称编号1《混凝土结构施工施工质量验收规范》《GB50204-20022《地下工程防水技术规范》GB50208-20013《建筑工程施工质量验收统一标准》GB50300-20014《建筑施工扣件式钢管脚手架安全技术规范.JGJ130-20015《施工手册第四版》6乐至•尚城D区D-6栋建筑施工图7乐至•尚城D区D-6栋结构施工图8乐至•尚城D区D-6栋施工组织设计2工程简况本工程为重庆乐至置业发展有限公司建设的乐至·尚城D区D-6#楼高层定向销售房及小商业工程,位于长寿区晏家镇育才路旁,工程施工图纸由重庆市得森建筑规划设计研究院设计。(一)建筑概况建设单位重庆市乐至置业发展有限公司设计单位重庆市得森建筑规划设计研究院工程名称乐至·尚城D区D-6#高层定向销售房及小商业工程工程地址长寿区晏家镇育才路旁单位工程名称建筑面积(m2)建筑高度(m)结构类型层数主楼1700081.6框剪结构体系地上26层小商业6644.4412.2框架结构体系地上2-3层本工程主楼结构形式为框剪结构体系、小商业为框架结构体系。本工程采用人工挖孔灌注桩基础,基础持力层为中风化砂质泥岩.基础置于中风化砂质泥岩时,基础及配筋按图表中施工,中风化砂质泥岩天然单轴抗压强度标准值frk=9.78Mpa.砼强度等级:桩基C30,地梁DL1、DXL*为C30,JL*为C40,垫层为C20,桩基封底为C30.长寿晏家乐至·尚城七期十标段项目模板工程专项方案33劳动力准备:本工程总工期为450个日历天,为了达到总工期的要求,顺利完成该分项工程,应紧密配合其它工种的施工作业。模板工人在基础至三层配备80个,在三层以上配备40个,以此确保本分项工程的工期。施工准备4技术准备:1)开工立即组织有关人员熟悉施工图和模板设计方案。针对模板工程的特点,学习《混凝土结构工程施工及验收规范》、《建筑安装分项工程施工工艺规程》,及时编制加工订货计划及材料机具计划,认真做好施工技术交底。根据工程的实际情况施工人员进行详细的技术交底。2)模板准备:本工程结构工程中地上部分墙体木模板,面板为竹夹板,楼梯模板采用定型加工模板,面板进场后进行核对、验收,并进行试组装完后,要按图进行编号,编号字迹要醒目。木方、竹夹板、穿墙螺栓、早拆柱头等材料按计划数量及时进场并要进行质量数量检验,不合格的要坚决修整。3)竹夹板进场,应对板厚进行认真验收,偏差小于1mm。角部方正,板面光滑,平整不得有翘曲。长寿晏家乐至·尚城七期十标段项目模板工程专项方案45施工工艺流程:6主要施工方法(基础及主体)6.1基础模板本工程基础共分两种形式,筒体部位为底板下反梁设计,下反梁采用砖胎模,如图1,材料准备按工程量准备模板(各种规格齐备),楞木、支撑架料及各种所需附件,操作模板安装熟悉图纸,了解各构件的几何尺寸、位置,按图拼出各后间的模板交接检下一工序应认真检查工程质量,保证构件满足设计抄平、放线抄平水平基准线,放出各条轴线及墙、柱、梁边线支撑体系保证模板有足够的刚度及强度,保证构件的垂直度、水平度及截面几何尺寸模板拆除模板拆除时间应满足规范要求,先拆支撑后拆模板,拆除时不应操作砼表面基层处理砼表面清洗干净,模板应有牢固的支撑点,墙柱脚模板下口作出水泥砂浆找平带。钢筋办好隐蔽验收自检检查各构件的轴线、边线行政度、水平度、平整度、几何尺寸等保养拆除模板后应对模板进行表面清理和几何尺寸的修理,涂恻脱模剂。按规堆放长寿晏家乐至·尚城七期十标段项目模板工程专项方案5其它部位为框架式基础梁,采用普通木胶合板模板施工,如下图26.2基础外墙φ12止水对拉螺栓18厚竹胶合模板50×100木方背楞钢板止水带图1核心筒底板模板大样根据梁高确定胎模厚度钢管斜撑混凝土垫层木枋背楞模板木垫木枋对拉螺杆模板普通对拉螺杆双钢管蝴蝶结螺帽图2基础梁模板大样长寿晏家乐至·尚城七期十标段项目模板工程专项方案6地下外墙为抗渗混凝土,模板采用18厚木胶合板模板支设,施工时先支内模板,再支外墙模板。φ16@600止水对拉螺栓。底板面以上500高设一道水平施工缝,施工缝设钢板止水带或遇水膨胀止水条如图3。外墙模板如图4。钢板止水带2.结构体应配合止水带施作公母接头。注:1.地表面以下外墙分层浇置处一律设置止水带。5050300〈内部〉4mm钢板剖面示意图〈外部〉图3排水沟φ48×1000mm钢管@800φ48×1000mm钢管@800底板侧模支撑架保留,作为外墙支撑外架的一部分,与外墙模板一起拆除。50mm厚细石混凝土护坡(内设钢丝网片)自然地坪钢管斜撑双螺帽短钢管与埋件电焊施工缝钢板止水带直径14mm螺栓60×60×-4止水片3mm塑料垫块φ16mmPVC套管钢管斜撑图46.3核心筒墙模板长寿晏家乐至·尚城七期十标段项目模板工程专项方案7地下室核心筒处的剪力墙,采用18厚木胶合板模板支设,50×100木方背楞,M16对拉螺栓间距600。由于核心筒处混凝土墙不要求抗渗,故采用对拉螺栓外设PVC套管的方式,螺栓拆模板后回收重复使用,核心筒在三层以下高度有4米多,图中对拉螺栓更换为止水螺杆。核心筒处剪力墙模板见图5。6.4框架柱模板框架柱分方柱和附墙柱,方柱和附墙柱采用双面覆塑胶合板模板。若有圆柱按图6施工,方柱及附墙柱按图7和图8施工。模板连接孔13螺孔角钢框L404定型钢模板4mm厚圆柱柱箍4加劲肋(或根据楼层高度确定)孔间距15012对拉螺栓50100木带梁1、砼圆柱长度分别有6100、5000、4200、4100五种,直径有900、750两种。钢模板分三节,下部两节为标准节,长度1500,上部(第三节)根据柱高度确定。2、标准节模板由两片组成,第三节模板为梁柱接头模板,由四片组成,尺寸根据梁高、宽确定。3、圆柱柱箍为桁架式柱箍,所有节点必须焊牢;定型钢模板加劲肋与钢板点焊,模板制作及螺孔尺寸应精确。4、圆柱柱箍连接采用M14螺栓,模板间连接采用M12螺栓。图7.2.4—4园柱支模图圆柱柱箍图12对拉螺栓圆柱柱箍50100木带梁竹胶模板2螺孔15圆柱定型钢模板模板连接孔13螺孔角钢框L404角钢框L404模板连接孔13螺孔定型钢模板4mm厚16钢筋10钢筋4加劲肋梁竹胶模板定型钢模板4mm厚4加劲肋圆柱说明梁图6圆柱支模图,仅参考参考长寿晏家乐至·尚城七期十标段项目模板工程专项方案8穿墙对拉螺栓1620030030030012003003003005002400500150050020050100方木48双钢管12厚竹胶板M12L=130200300300300300300300300100穿墙对拉螺栓1612厚竹胶板48双钢管50100方木16001-1600@300M12L=130图7.2.4-3砼墙体模板图1、模板规格根据竹胶板的规格和墙体高度长度分块配制。2、竹胶板与木带用2″的木螺丝连接,必须拧牢,木带贴竹胶板侧面必须刨直。3、穿墙对拉螺栓外墙螺杆中间设置滞水片。4、模板上下左右连接采用M12的机制螺栓,长130,带螺帽。说明图.5混凝土墙体模板图长寿晏家乐至·尚城七期十标段项目模板工程专项方案940404止水片60604螺垫蝶形卡14螺栓配螺帽48双钢管100100木方加固带12厚竹胶模板M14螺杆对拉60604螺垫混凝土柱M14螺帽12厚竹胶模板60604螺垫M14螺杆对拉100100木方加固带M14螺帽100100横木带16穿墙对拉螺栓配螺帽12厚竹胶模板14螺栓配螺帽48双钢管立带50100横带48双钢管横带50100立带方木图7.2.4-5方柱模板图图7.2.4-6附墙柱模板图6.5框架梁模板采用12厚竹胶板50×100木方配制成梁帮梁底模板。规格尺寸要精确,加固梁帮采用双钢管对拉螺栓,梁上口用钢筋支撑以保证梁上口宽度。梁下部支撑采用碗扣脚手架,设水平拉杆和斜拉杆。采用早拆支撑体系和木夹板,木夹板与早拆支撑体系中的托梁之间用50×100mm木枋支承。具体实施过程中,应根据结构图绘制模板图,包括支撑间距、位置,模板组合等。6.6砼楼板模板支撑采用碗扣脚手架,纵横间距为1200,主龙骨为双钢管,上部铺设18厚竹胶板,用钉子钉牢。见模板图10.图37方柱模板图图.8附墙柱模板图长寿晏家乐至·尚城七期十标段项目模板工程专项方案10模板安装示意图次梁250×500框架梁500×650,钢管支撑纵向间距@1000Φ14螺栓@600,置于梁2/3h斜撑40×60@500,两侧背枋、夹枋50X100,通长每侧3条底模50×500侧模30×500,立档40×60@500楞木50×100、@400砼板厚150钢管支撑纵@1000横@1400板模18厚胶合板板模搁栅50×100,@400长寿晏家乐至·尚城七期十标段项目模板工程专项方案1112对拉螺栓配螺帽碗扣脚手架间距900水平拉杆间距120012厚竹胶板50100木带48龙骨间距1200碗扣脚手架间距1200木楔12厚竹胶板木楔12对拉螺栓配螺帽50100木带碗扣脚手架间距900水平拉杆间距120048龙骨间距1200碗扣脚手架间距1200硬塑料套管2050100木方平铺间距40050100木方平铺间距4001、梁板支撑采用碗扣脚手架。2、水平拉杆和剪刀斜撑用48钢管。3、砼楼板底模全部采用竹胶板,50100木龙骨。4、砼梁截面规格尺寸不同,但模板制作安装基本方法相同。5、钢管连接用铸钢扣件。说明图7.2.4—7框架梁模板6.7电梯井内模采用整体筒子模,四角采用钢板制成的活动铰链,四角支撑
本文标题:模板及清水模板施工方案
链接地址:https://www.777doc.com/doc-2305396 .html