您好,欢迎访问三七文档
挡土墙工程量计算一.挖沟槽土方挖槽土方=挖槽段面积*段长挖槽段面为1:1放坡梯形断面,断面高度=地面高程-去墙底标高+垫层高度A-B段地面标高为17.00m墙底标高为15.50m垫层高度为100+300=0.4m即断面高度为1.9m根据图纸可得槽底宽度为8.15m顶部宽度为8.15+1.9+1.9=11.95m断面面积=(11.95+8.15)*1.9/2=19.095m2挖槽土方量=19.095*96.001=1833.14m³B-B1段地面标高20.0m墙底标高17.0m垫层高度0.4m所以断面高度为3.4m槽底宽度为8.15m槽顶宽度为8.15+3.4*2=14.95m断面面积=(14.95+8.15)*3.4/2=39.27m2挖槽方量=39.27*10=392.7m³B1-C段地面标高20.0m墙底标高18.5m垫层高度0.4m即断面高度为1.9m槽底宽度8.15m槽顶宽度8.15+3.8=11.95m断面面积=(8.15+11.95)*1.9/2=11.353m²土方量=11.353*55.858=634.16m³C-D段地面标高20.0m墙底标高18.5m同上可得断面面积=11.353m²土方=11.353*72.238=820.12m³挖槽土方量=1833.14+392.7+634.16+820.12=3680.12m³回填方A-B段断面底宽L=4.2m高H=8.0m顶宽B=0.5m面积=4.7*4=18.8m²填方量=18.8*96.001=1804.82m³B-B1段断面底宽L=3.0m高H=6.8m顶宽B=0.5m面积=3.5*3.4=11.9m²填方量=11.9*10=119m³B1-C段断面底宽L=2.5m高H=5.4m顶宽B=0.5m面积=3*2.7=8.1m²填方量=8.1*55.858=452.45m³C-D段断面底宽L=2m高H=4.4m顶宽B=0.5m面积=2.5*2.2=5.5m²填方量=5.5*72.238=397.309m³总的回填方量=1804.82+119+452.45+397.309=2773.58m³余方弃置多余土方量=挖方量-回填方量=3680.12-2773.58=906.54m³深层搅拌桩搅拌桩每排9个排间距为0.9m即排数=段长/排间距=96.001/0.9=106.7取整为107排所以搅拌桩总数=963个总长=963*7=6741m挡土墙砼挡土墙砼总量=各段墙砼量之和每个支撑的体积V=DL1*(H-DH)*0.4*0.5其他主要墙体的截面=BT*HT+(DH+DH0)*DT*0.2+DH*(DL1+B)+B*(H-DH)代入数据可得:AB段V=5.88m³S=10.375m²则总体积Va=996.01+(96.001/5)*5.88=1108.91m³BB1段V=3.78m³S=5.7m²则总体积Vb=57+(10/5)*3.78=64.56m³B1C段V=2.55m³S=4.36m²则总体积Vc=243.54+(55.858/5)*2.55=272.03m³CD段V=1.56m³S=3.56m²则总体积Vd=257.17+(72.238/5)*3.56=308.60m³所以挡土墙砼量=1754.1m³C15垫层垫层工程量=剖面断面面积×段长AB段查图纸上的数据可得断面面积=4.798×0.1+(7.1-4.798)×(0.1+0.598)×0.5=0.8034m²方量=0.8034*96.001=77.127m³BB1段查图纸可得断面面积=4.3*0.1=0.43m²方量=0.43*10=4.3m³B1C段查图纸可得断面面积=3.8*0.1=0.38m²方量=0.38*55.858=21.226m³CD段查图纸可得断面面积=3.3*0.1=0.33m²方量=0.33*72.238=23.84m³所以C15砼垫层的方量=126.493m³垫层根据图纸可得垫层宽度=C15砼垫层宽度+0.7厚度=0.3m垫层方量=7.9*0.3*96.001+5.0*0.3*10+4.5*0.3*55.858+4.0*0.3*72.238=404.61m³现浇构件钢筋钢筋总量=各段中所有型号的钢筋总重量即现浇构件钢筋总量为149.127t钢筋直径(mm)AB段(m)BB1段(m)B1C段(m)CD段(m)排水沟(m)排洪沟(m)合计m公称直径重量kg/m重量t102261.7562261.80.6171.3961222808.4481473.7005994.9586201.16010250.86046729.10.88841.4951618859.5921962.9009208.9329889.276805.50040726.21.58064.347183008.000476.9201731.5981805.9507022.52.00014.045207476.056490.8967967.02.47019.67822111.648563.904675.62.9802.013251593.7201593.73.8606.152总计106975.8149.127排洪沟砼排洪沟砼量=断面面积×沟长=3.0×0.5×161.859=242.79m³排水沟砼排水沟砼量=断面面积×沟长=0.75×0.15×72.238=8.13m³砖砌排水沟砖砌排水沟长度从图纸中可以得出=挡土墙长度=234.097m³泄水管根据设计泄水管的排布为2m×2m梅花形布置管长约为0.4m。由各段的尺寸可得AB段有四排、其他段各有两排。所以泄水管个数=329个泄水管总长=131.6米沉降变形缝变形缝的设置取20米一条。则变形缝的总长为94.2米反滤层由图纸可以得出反滤层断面面积=(H-DH-1.0)*0.4即AB段(7-1.0)*0.4*96.001=230.4m³BB1段(7-0.7-1.0)*0.4*10=21.2m³B1C段(5.5-0.6-1.0)*0.4*55.858=87.14m³CD段(4.5-0.6-1.0)*0.4*72.238=83.80m³所以反滤层的总量=422.54m³垫层模板模板面积等于两个断面面积和两侧挡板面积=15.6m²排水沟模板根据每20米浇筑一次计算,每套模板面积=24.225m²根据施工要求配置模板4套总面积=96.9m²排洪沟模板根据每20米浇筑一次计算,每套模板面积=123m²根据施工要求配置模板4套总面积=492m²挡土墙模板根据最大尺寸段AB段浇筑要求配置模板按20米一段浇筑,每套模板最大面积需要497.7m²根据施工要求配置模板4套总面积=1990.4m²
本文标题:挡土墙工程量计算
链接地址:https://www.777doc.com/doc-2375694 .html