您好,欢迎访问三七文档
当前位置:首页 > 建筑/环境 > 建筑制度 > (2013-04-04)精装修工程施工工艺及验收标准
目录第一章抹灰工程....................................................................................................11.1室内抹灰工程施工工艺标准.............................................................................11.2清水砌体勾缝工程施工工艺标准......................................................................6第二章吊顶工程..................................................................................................102.1轻钢骨架活动罩面板顶棚施工工艺标准........................................................102.2轻钢骨架固定罩面板顶棚施工工艺标准........................................................162.3轻钢骨架金属罩面板顶棚施工工艺标准........................................................23第三章轻质隔墙工程..........................................................................................293.1木龙骨板材隔墙施工工艺标准........................................................................293.2玻璃隔断墙施工工艺标准...............................................................................323.3轻钢龙骨隔断墙施工工艺标准........................................................................353.4活动隔断墙施工工艺标准...............................................................................40第四章饰面板(砖)工程...........................................444.1室外贴面砖施工工艺标准...............................................................................444.2室内贴面砖施工工艺标准...............................................................................474.3马赛克施工工艺标准.......................................................................................524.4墙面石材湿作业施工工艺标准........................................................................554.5墙面石材干挂施工工艺标准............................................................................60第五章涂饰工程.................................................675.1乳胶漆涂饰施工工艺标准...............................................................................675.2木饰面施涂混色油漆施工工艺标准................................................................70第六章裱糊软包工程.............................................746.1裱糊工程施工工艺标准...................................................................................746.2木做软包墙面施工工艺标准............................................................................80第七章门窗工程.................................................847.1木门制作工艺标准..........................................................................................84第八章细部工程.................................................898.1橱柜制作与安装施工工艺标准........................................................................898.2窗帘盒制作与安装施工工艺标准....................................................................928.3窗台板制作与安装施工工艺标准....................................................................958.4门窗套制作与安装施工工艺标准....................................................................978.5护栏和扶手制作与安装施工工艺标准..........................................................1008.6花饰制作与安装施工工艺标准....................................102第九章建筑地面工程............................................1069.1砖面层施工工艺标准.....................................................................................1069.2大理石面层和花岗岩面层施工工艺标准......................................................1109.3塑料(塑胶)面层施工工艺标准......................................................................1149.4活动地板施工工艺.........................................................................................1189.5地毯面层施工工艺标准.................................................................................121附录A各分项工程允许偏差及检验方法..............................125PDF文件使用pdfFactoryPro试用版本创建技术工程的施工图、设计说明及其他设计文件完成。b.施工技术交底宣贯到工人。1.1.1.2材料准备a.水泥:出厂日期超过三个月必须复验合格后方可使用。b.砂:宜采用平均粒径0.35-0.5mm的中砂、含泥量不大于3%。c.材料的进场验收记录和复验报告完成。d.严禁使用国家明令淘汰的材料。1.1.2施工条件1.1.2.1作业条件a.主体结构必须经过相关单位检验合格,二次结构施工完成不得少于30天。b.对抹灰基层表面应清除干净、并提前浇水均匀湿透。c.基体的施工孔洞已堵塞密实。d.抹灰前应熟悉图纸、设计说明及其他设计文件、制定方案。1.1.2.2安全条件和措施a.安全措施:1.高处作业须佩戴安全带。2.作业过程中遇有脚手架与建筑物之间拉接,严禁拆除。PDF文件使用pdfFactoryPro试用版本创建采用外电梯垂直运输材料时,安全防护必须符合要求。4.脚手板不得搭设在门窗、洗脸池等不承重的物器上。1.1.2.3环保条件和措施a.环保条件:1.施工用砂要集中封闭或覆盖堆放。2.施工污水未经处理不得随意排放。b.环保措施:1.使用现场搅拌站时、应设置施工污水处理设施。2.施工垃圾要集中堆放、由合格处置单位组织处置。3.大风天严禁筛制砂料、石灰等材料。4.砂子、石灰、散装水泥要封闭或覆盖集中存放。5.严禁将垃圾杂物从窗、洞口等处采用抛撒运输方式。6.现场使用或维修机械必须符合要求。1.1.3质量控制要点a.冬期施工现场温度不低于5℃。b.内墙抹灰施工应至少分两遍进行,每遍厚度宜为7-8mm,最厚不超过10mm;面层宜为7-10mm,严禁一遍成活。c.不同材料基体交接处表面的抹灰,应采取防止开裂的加强措施,当采用加强网时,加强网与各基体的搭接宽度不应小于150mm。d.要求粘结牢固,无开裂、空鼓和脱落。e.抹灰砂浆中使用材料应充分水化,防止影响粘结力。1.1.4施工工艺1.1.4.1施工工艺流程基层清理→浇水湿润→吊垂直、套方、找规矩、抹灰饼→做护角→墙面充筋→抹底灰→修补预留孔洞、电箱槽、盒等→抹罩面灰1.1.4.2操作工艺1.基层清理a砖砌体:应清除表面杂物,残留灰浆、尘土等。b混凝土基体:表面凿毛或在表面洒水润湿后涂刷素水泥浆(加适量胶粘剂或界面剂)。c加气混凝土基体:应在湿润后一边涂刷界面剂,一边抹强度不大于M5的PDF文件使用pdfFactoryPro试用版本创建水泥混合砂浆。2.浇水湿润一般在抹灰前一天,用软管或胶皮管或喷壶顺墙自上而下浇水湿润,每天宜浇两次。3.吊垂直、套方、找规矩、做灰饼根据设计图纸要求的抹灰质量,根据基层表面平整垂直情况,用一面墙做基准,吊垂直、套方、找规矩,当墙面平整度较差时应分层衬平,每层厚度不大于7-9mm。操作时应先抹上灰饼,再抹下灰饼。抹灰饼时应根据墙面尺寸确定灰饼的正确位置,再用靠尺找好垂直与平整。灰饼宜用1:3水泥砂浆抹成5cm见方形状。4.护角首选成品金属或塑料护角条。墙、柱间的阳角应在墙、柱面抹灰前用1:2.5水泥砂浆做护角,其高度自地面以上2m。然后将墙、柱的阳角处浇水湿润。第一步在阳角正面立上八字靠尺,靠尺突出阳角侧面,突出厚度与成活抹灰面平。然后在阳角侧面,依靠尺边抹水泥砂浆,并用铁抹子将其抹平,按护角宽度(不小于5cm)将多余的水泥砂浆铲除。第二步待水泥砂浆稍干后,将八字靠尺移至到抹好的护角面上(八字坡向外)。在阳角的正面,依靠尺边抹水泥砂浆,并用铁抹子将其抹平,按护角宽度将多余的水泥砂浆铲除。抹完后去掉八字靠尺,用素水泥浆涂刷护角尖角处,并用捋角器自上
本文标题:(2013-04-04)精装修工程施工工艺及验收标准
链接地址:https://www.777doc.com/doc-2472593 .html