您好,欢迎访问三七文档
当前位置:首页 > 商业/管理/HR > 项目/工程管理 > 恒大室内装饰施工工艺和质量标准...(116P)
更多装修施工技术资料下载:装修施工站目录第一章住宅室内装修工序间歇及工艺间歇标准······························31.1墙面各工序间歇及工艺间歇要求标准···········································31.2地面各工序间歇及工艺间歇要求标准············································31.3木地板施工基层要求标准································································41.4细部处理各工艺间歇要求标准························································41.5其它装修施工要求············································································4第二章住宅室内装修工艺流程标准·····················································5第三章住宅室内装修施工工艺和质量标准········································63.1场地移交····························································································63.2弹线···································································································103.3电线穿管···························································································143.4卧室地面找平···················································································153.5墙面砖铺装·······················································································173.6墙面石材铺装···················································································233.7天花吊顶、石膏线安装·····································································283.8入户门安装·······················································································313.9地面砖、石材铺贴·············································································343.10窗台石铺贴·····················································································403.11天花墙面扇灰、涂饰乳胶漆···························································423.12墙面造型制作、安装·······································································473.13橱柜、卫浴安装················································································513.14户内门安装······················································································573.15木地板安装······················································································633.16墙面玻璃镜面安装·········································································70更多装修施工技术资料下载:装修施工站墙面木饰面造型油漆·····································································703.18墙纸贴铺·························································································733.19阳台护栏安装·················································································773.20低窗护栏安装·················································································783.21墙面软包制作安装·········································································803.22灯具、插座开关面板安装·······························································823.23卫生洁具安装·················································································973.24卫浴五金安装···············································································1043.25淋浴隔断安装···············································································1053.26细部处理·······················································································1063.27石材镜面处理···············································································1143.28卫生清理·······················································································116更多装修施工技术资料下载:装修施工站恒大地产集团住宅室内装修施工工艺和质量标准(试行)施工工序原则:先上后下、先湿后干、先内后外、先粗后细、先制作后安装。第一章住宅室内装修工序间歇及工艺间歇标准1.1墙面各工序间歇及工艺间歇要求标准≥28天≥28天≥15-20天≥7天工艺要求工艺要求工艺要求1.2地面各工序间歇及工艺间歇要求标准1、卧室木地板、地毯等基层地面找平完成后,可上人作业间歇时主体结构构构砌体墙面抹灰刮腻子子涂料\墙纸小高层结构至8层,中高层、高层结构施工至12层时,砌体可开始施工。1、一次砌筑高度不大于1.8米,间歇1天后再砌筑施工。2、顶砖(或顶膨胀混凝土浇筑)施工,须砌体完成7天后进行。1、南方地区:秋、冬季墙面含水率不大于12﹪,春、夏季墙面含水率不大于14﹪时可刮装饰腻子。2、北方地区:统一控制墙面含水率不大于12﹪时即可刮装饰腻子。1、根据墙面基层平整度,可进行2~3遍刮装饰腻子。2、每两遍装饰腻子施工干燥间歇时间为不小于48小时。1、南方春、夏季基层含水率不大于12﹪,北方地区及南方秋、冬季基层含水率均不大于8﹪。2、每两遍涂料(墙纸基层底油)间歇时间为不小于48小时。更多装修施工技术资料下载:装修施工站小时。2、客厅、餐厅、厨房、卫生间、阳台、电梯前室、首层大堂等地面砖、石材铺贴完成后,可上人作业间歇时间为不小于48小时。3、室内地面砖、石材及地面找平完成后,墙面1米线以下墙体刮装饰腻子需要间歇不小于15-20天,其要求含水率不大于14﹪。1.3木地板施工基层要求标准木地板地面基层含水率标准一览表地区季节南北春、夏≤12﹪≤8﹪秋、冬≤8﹪≤8﹪1.4细部处理各工艺间歇要求标准1、厨房、卫生间、阳台、电梯前室、首层大堂等墙面砖采用湿贴工艺,砖缝水泥清理所需间歇时间为3-6小时。2、墙面、地面、台面等湿贴作业完成后,需钻孔、打眼等间歇时间不小于14天。3、各交界面细部处理打胶后,与卫生清理间歇时间不小于24小时。4、入户门门框安装后,门扇安装所需间歇时间不小于72小时;户内门门框安装后,门扇安装所需间歇时间不小于24小时。1.5其它装修施工要求1、小高层结构至8层,中高层、高层结构施工至12层,砌体开始施工时,装修施工单位定标、不少于2名装修管理人员到位。3、外立面装饰完成10层,外脚手架拆除上面5层,且卫生清理更多装修施工技术资料下载:装修施工站完毕,进行场地移交,装修施工人员全部到位。4、小高层分2批移交,每批5层,移交间歇时间15天;中高层、高层分3批移交,第1批5层,第2、3批移交10层左右,流水施工作业。第二章住宅室内装修工艺流程标准电线穿管配线场地移交弹线墙面造型制作橱柜、卫浴安装天花吊顶、石膏线安装入户门框安装窗台石铺贴地面砖、石材铺贴天花、墙面扇灰涂饰底漆卧室地面找平厨卫墙砖、石材铺贴入户门套、门扇、门锁及户内门框安装墙面造型饰面安装木地板基层安装户内门套线安装墙纸铺贴低窗护栏安装户内门扇安装卫生清理细部处理木地板、地脚线安装卫生清理至五星级标准交楼、安装室内五金配件天花、墙面打磨涂饰面漆灯具、开关面板、水龙头安装更多装修施工技术资料下载:装修施工站、室内结构楼板、墙面无穿透性裂缝和渗漏水缺陷。2、室内天花结构板无下挠,平整度误差不大于8mm,梁底两端高差不超过8mm,模板接缝处应磨平。3、墙体砌筑、批荡(卫生间、厨房墙面为1:2水泥砂浆,其余墙面为混合砂浆)完成,基层无空鼓、开裂、起灰等质量缺陷,房间墙面阳角部位需做不低于2米高1:2水泥砂浆护角,垂直度、平整度误差不大于3mm。4、铝合金门、窗框安装到位,窗台两端尺寸误差不大于10mm,阴阳角方正偏差不大于4mm,窗框塞缝完毕且淋水试验合格,无窗框渗漏水。5、厨房、卫生间、阳台等给排水管线预埋及给水管试压合格。6、厨房烟道安装并挂网批荡,挂网与墙体搭接150mm,防水封堵和止回阀安装完毕且验收合格,烟道排烟口顶至楼板底高度为150mm。7、强弱电预埋管线、底盒位置与设计图纸一致,管线畅通。8、隐蔽水电管道位置应标识清楚。9、高位空调(卧室、书房
本文标题:恒大室内装饰施工工艺和质量标准...(116P)
链接地址:https://www.777doc.com/doc-3189081 .html