您好,欢迎访问三七文档
当前位置:首页 > 行业资料 > 冶金工业 > 锰矿企业可行性研究报告
1目录第一章总论······························61.1项目背景·····························61.1.1项目名称···························61.1.2项目承办单位·······················61.1.3有关法律规定·······················61.1.3.2有关规范、年鉴···················61.1.3.3有关规范、规程及标准··············71.2项目概况······························71.2.1大新概况······························71.1.3.3有关规范、规程及标准················71.2项目概况·······························71.2.1大新县概况·························71.2.2地理位置···························81.2.3历史沿革···························91.2.4自然条件··························91.2.4.1地形地貌······················91.2.4.2地质构造······················91.2.4.3气候··························101.2.4.4水文情况······················101.2.5自然资源、能源交通、环境·············101.2.5.1自然资源·····················101.2.5.2能源··························111.2.5..3交通·························111.3建设规模与产品·························121.3.1建设规模···························121.3.2产品介绍···························131.4研究工作概况···························141.4.1项目建设的必要性····················141.4.2项目研究工作内容···················181.4.2.1市场预测和项目规模················181.4.2.2厂址······························191.4.2.3工程技术方案······················201.4.2.4工厂组织及劳动定员················201.4.2.5投资估算和资金筹措················21第二章项目背景和发展概况·····················222.1项目提出的背景························222.1.1项目发起人和发起缘由···············222.2项目发展概况··························222.2.1已进行的调查研究项目及其成果·······222.2.2厂址初堪和初步测量个工作情况·······222.3投资经济效益和社会效益·················232第三者市场分析与建设规模····················263.1市场调查······························263.1.1拟建项目出物用途调查···············263.1.3产品价格调查························263.2.2市场供应分析························293.3建设规模······························30第四章建设条件与厂址选择····················324.1资源和原材料···························324.1.1资源评述·····························324.2建设地区的选择·························324.2.1选址原则·····························334.2.2其它应考虑的因素·····················334.2.3方案比选·····························344.3推荐拟定厂址···························35第五章技术方案······························365.1项目组成······························365.2生产技术方案···························365.2.1生产方法····························365.2.2主要技术参数和工艺流程··············375.2.3环境保护····························395.3运输与存储·····························405.3.1厂内外运输方案······················405.3.2仓储方案·····························415.3.3占地面积及分析······················41第六章环境保护与劳动安全····················426.1项目环境保护的依据及目标··············426.1.1设计依据···························426.1.2环境保护目标·······················426.2工程建设及生产运营对环境的影响·········436.2.1工程建设对环境的影响·················436.2.2生产运营对环境的应该·················446.3环境影响的对策·························456.3.1工程建设工程中黄静影响的对策·········456.3.2生产营运中环境影响的对策·············45第七章企业组织和劳动定员························497.1项目实施原则······························497.2组织机构··································497.2.1建设管理机构··························497.2.2运行管理机构··························507.2人员编制··································517.3员工培训··································52第八章工程招标···································548.1项目招标范围······························548.2招标组织与招标方式·······················543第九章投资估算与资金筹措·························569.1投资估算·································569.1.1投资估算范围····························569.1.2投资估算方法····························569.1.3估算结果·······························569.2效益预测··································58第十章可行性研究结论与建议······················5810.1结论····································5810.2建议····································584第一章总论1.1项目背景1.1.1项目名称大新县年产1万吨电子级四氧化三锰及7200吨锰锌软磁铁氧体生产项目1.1.2项目承办单位大新县发展与改革局1.1.3可研报告编制依据1.1.3.1有关法律法规(1)《中华人民共和国城市规划法》(2)《中华人民共和国建筑法》(3)《中华人民共和国土地管理法》(4)《中华人民共和国环境保护法》(5)《建设项月环境保护管理法》|(6)《国务院关于环境保护若干问题的决定》,国发[1963]31号1.3.2有关规划、年鉴(1)《大新县国民经济和社会发展第十一个五年(2005一52010年)规划纲要》(2)《大新县县城总体规划(2004-2020)》(3)《大新县县志》(4)《广西年鉴2006版》1.1.3.3有关规范、·规程及标准(1)《建筑结构荷载设计规范》(GB50009-2001)(2)《混凝土结构设计规范》(GB50010-2002)(3)《建筑地基基础设计规范》KGB50007-2002)(4)《建筑抗震设计规范》(GB50011-2002)(5)《工业企业设计卫生标准》(TJ36-79)(6)《工业企业噪声控制设计规范》(GBJ87-85)(7)《低压配电装置及线路设计规范》(GB50054-95)1.2项目概况1.2.1大新县概况大新县是广西一个边境县,东西横距90公里,南北纵距75公里,总面积2755平万公里,折合275501公顷,其中耕地面积33211公顷(水田16580公顷,旱地16631公顷),有林面积23600公顷。1981年全县总人口32.30万人,1991年全县总人口34.32万人,2006年全县总人口36.2万人,境内聚居壮、汉、瑶、苗等l5个民族。壮族人口占总人口的97.2%,其中农村人口31.0万。属南亚热带季风气6境内翠山连绵,河溪交错,山清不秀,春夏秋冬,气候宜人。在改革开放以来,县委、县政府审时度势,抓信机遇,充分利用本地资资源优势,经济建设取得了新的成就。各项事业都有新的发展,社会日趋安定团结,群众安居乐业,呈现一派繁荣景象。2005年全县地区生产总值实现20.68亿元,年于均增长15.43%其中,第一产业增加值3.79亿元年均增长11.65%;第二产业增加值7.81亿元,年均增长22.25%:第三产业增加值6.08亿元,年均增长12.82%。一、二、三立之间的比例由20仍年的@45.04:30.25:24.71发展为2005年的32.83:37.78:29.39。经济结构由一、二、三型向二、一、三”型转变,进入了初级工业化阶段。2004年全县财政收入完成19168万元,比2000年增长93.99%,提前完成十五目标。2005年财政收入完成25068万元,年均增长20.47%。社会消费品零售总额达2.81亿元。年均增长7.25%。工业化进程提速,工业对经济增长的贡献率明显提高。2005年工业增加值比2000年增长172%,年均增长20.62%。2005年规模以上工业企业完成工业总产值18.78亿元,年均7增长26.94%。近年来,大新县的固定资产投资有较快增长,保持投资对经济增长的强劲拉动。2005年全县完成固定资产投资已6.95亿元,年均增长25.19%。招商引资力度加大,对外开放水平进一步提高。大新县不断完善投资软硬环境,以吸引外来投资建设。十五期间,全县累计引进区内外资金6.15亿元,一大批项目相继开工建设,加快了大新县经济社会的发展。1.2.2地理位置大新县位于广西的西南部,北纬22°29°23°05°、东经106°39'~107。29'之间,东南界祟左市右江区,东北邻隆安县,正北与天等县接壤,西北同靖西县相近,西南靠龙
本文标题:锰矿企业可行性研究报告
链接地址:https://www.777doc.com/doc-334864 .html