您好,欢迎访问三七文档
当前位置:首页 > 建筑/环境 > 工程监理 > 填砂压渗工程施工方案
目录1.慨况·········································································12.填筑施工···································································12.1.场地清理································································12.2.填筑施工································································13.质量保证措施·····························································23.1.严格执行“三检制”·················································23.2.原材料质量保证措施·················································23.3.质量保证措施··························································24.施工安全措施·····························································34.1.施工现场安全措施····················································34.2.用电安全措施··························································45.单元工程划分·····························································56.计划投入的人员及设备·················································56.1.施工人员投入计划····················································56.2.施工设备投入计划····················································67.施工进度计划·····························································6-1-填砂压渗工程施工方案1.慨况填砂压渗工程包括内坡填砂和内坡填塘。黄塘堤段压渗河砂21.2万m3和压渗填料7.6万m3。压渗区范围:桩号36+800~39+350。桩号36+800~37+050采用压渗填料;桩号37+050~38+000,底层采用1000mm厚的河砂(排水渠向上游70m范围),河砂面以上采用压渗填料;桩号38+000~38+800,底层采用1000mm厚的河砂(河砂面控制高程为▽6.750~6.250m),河砂面以上采用压渗填料;桩号38+800~39+100,采用压渗填料;桩号39+100~39+350,底层采用1000mm厚的河砂,河砂面以上采用压渗填料。砂壤土压重台:39+500~40+750。内坡填塘主要指43+474~44+362桩号间的鱼塘,约5万m3。填料取自堤身开挖料。2.填筑施工2.1.场地清理回填基础是耕地或松土,清除表面后,先平整再压实,然后回填;若是稻田或积水凹地,抽干水,清除淤泥和腐植土、压实基底后方可回填。2.2.填筑施工填筑施工从低处开始回填,采用进占法回填,按监理批准的碾压参数分层碾压,15t自卸汽车将土料运至工作面卸料,推土机推平,18t压路机压实。凡进入雨天施工的填筑工程,根据工程的特点合理安排机具和劳力,组织快速施工;雨天安排施工计划,要集中机具、人力分段突击,本着完成一段再开一段的原则。当日填筑当日完成,做到随挖、随填、随压。-2-3.质量保证措施3.1.严格执行“三检制”设立专职质检员,由专业工程师任职,赋予其质量一票否决权。施工过程中,严格执行“三检制”,即初检、复检、终检。工序交接有班组间的交接检查,工序质量评定在班组自检基础上方能进行专检,并填写质量评定表;隐蔽工程在内容检查通过后,再请监理工程师及设计人员检查,同意并签字后方可实行隐蔽;对监理工程师及设计人员提出的问题,工长亲自监督整改,直到合格。3.2.原材料质量保证措施施工中将对工程使用的材料和工程设备,以及工程的所有部位施工工艺进行全过程的质量检查。原材料、中间半产品、混凝土试块等,测试量的15%由广东省水利水电工程质量检测中心站提供检测数据,并按水利部《水利水电质量检测管理规程》提交检测结果专题报告,作对比检测,确保工程质量。3.3.质量保证措施(1)控制铺料层的厚度,保持填料层表面平整,根据铺料厚度,计算出每车土料控制的面积,不要一次在作业面上料太多。(2)采取进占法铺料,防止土料剪切破坏,并布置好临时施工道路,尽量减少车辆在堤面的行驶距离。(3)填筑土料种类、含水量、填筑部位以及相的压实度,均须符合设计规定。(4)堤面施工统一管理,严密组织,保证工序衔接,分段流水作业,层次清楚和大面积平整,均衡上升,减少接缝。(5)当气候干燥,料层表面水分蒸发较快时,铺料与压实表面适当洒水润湿,以保持施工含水量。-3-(6)铺料与碾压工序连续进行,如需短时停工,其表面风干层经常洒水湿润,保护含水量在控制范围内,如需长时间停工,根据气候条件铺设保护层,复工时予以清除,并检查填筑面。(7)压渗料经压实后,不得有松散、软弹、翻浆及表面不平整的现象。(8)雨天填筑施工保证措施1)作好雨前预报,雨前用平碾快速压实表层松土,并保持填筑面平整,以防雨水下渗,且避免积水。雨后填筑面晾晒或处理经检验(查)合格后,方可复工。2)土料填筑略向上下游倾斜1%,以利排除积水。并作好排水保护措施,以防降雨冲坏坡面。3)为保持土石料正常的填筑含水量,当降雨量较大时,停止填筑施工,并用防渗材料如帆布、塑料薄膜等覆盖,复工前予以清除。4)在土料场内储备足够数量的合格土料,完善料场的排水防雨措施。4.施工安全措施建立分项工程安全管理小组,由分项工程负责人担任组长,现场各施工组组长及专职安全员任组员,制订并完善各施工环节的安全保证措施,遵守国家和有关部门颁布的法令法规。4.1.施工现场安全措施(1)所有进入现场人员,必须按有关规定穿着工作服、劳保鞋、配戴安全帽。(2)施工现场存放的设备、材料,做到场地安全可靠,存放整齐,通道畅通。(3)严禁在开挖边坡顶、坡脚等不安全地区停留和休息。施工-4-现场设置安全设施和明显标志。(4)全体施工人员必须严格遵守岗位责任制和交接班制度,并熟知本工种的安全技术操作规程。(5)挖掘机作业时,任何人不得进入挖掘机的危险半径内。(6)搬运材料和使用工具时,必须时刻注意自己和周围及上下方面人员的安全;上下传送器材或工具时,禁止抛掷。(7)电工、挖掘机司机和各种机动车辆司机,必须经过专门培训,考试合格后发给操作证,方准独立操作。(8)做好安全施工记录,平时施工班组在交接班时要做好自检,施工期间专职安全员要做好巡检工作,便于及时发现和解除施工安全隐患,做到发现问题及时解决。4.2.用电安全措施(1)施工现场临时用电严格执行《施工现场临时用电安全技术规范》JGJ46-88的规定执行。(2)临时用电线路推行“三相五线”接线方式,做好接零或接地保护。(3)临时用电线路的安装、维修和拆除,均由持上岗证的电工完成。(4)所有配电箱、开关箱均有单位名称字样和“有电危险!”的红色警示语。(5)实行一机一闸,严禁一闸多机。(6)所有配电箱、开关箱有门、有锁和防雨措施。(7)潮湿作业区域照明用电使用36V以下安全电压。(8)开关箱安装符合要求的漏电保护开关。(9)凡使用的电线电缆不得有脱皮、露芯等易引起漏电的现象。-5-(10)移动电气设备的供电线路,使用橡胶电缆,穿过行车道时穿管敖设,破损电缆不得使用电。(11)检修电气设备时停电作业,电源箱或开关箱拖柄挂“有人操作,严禁合闸”的警示牌或设专人看管。(12)严禁使用铜丝,铁丝代替保险丝使用。(13)照明行灯有保护罩;行灯手柄绝缘良好且耐热、防潮;行灯变压器采用双绕组型。(14)照明灯具与易燃物之间,保持一定的安全距离;当距离不够时,采取隔热措施。5.单元工程划分护坡工程单元划分表序号部位单元划分备注1压渗填砂每300m为1个单元段。36+800~38+800为7个单元段,38+800~39+350有2个单元段,39+500~40+750有4个单元段,42+980~43+300为1个单元段,43+300~43+732为1个单元段。2内坡填塘每一个塘为1个单元段。43+474~43+745有2个单元段,43+900~44+045为1个单元段,44+172~44+362为1个单元段。6.计划投入的人员及设备6.1.施工人员投入计划(1)责任人:(2)调度:(3)三检人员:-6-1)初检:2)复检:3)终检:(4)其它管理人员:6人(5)生产工人:50人6.2.施工设备投入计划根据工程施工内容、工作面安排和工期要求,拟投入施工设备如下:表11-2投入的施工设备表设备名称型号及规格数量轮式装载机ZL50,3m33反铲挖掘机PC220,1.1m312推土机D7G,147.1kW8自卸汽车三菱,15t10压路机2Y8/10,10t4全站仪PTS-V22水准仪NA227.施工进度计划
本文标题:填砂压渗工程施工方案
链接地址:https://www.777doc.com/doc-3465162 .html