当前位置:首页 > 行业资料 > 冶金工业 > 国华惠州大亚湾热电厂2
建筑-51-01厂区消防0/A1目录1、工程概况2、编制依据···························································33、作业前的条件和准备··················································43.2作业人员···························································53.3作业工机具·························································73.4材料和设备·························································83.5工序交接··························································134、作业程序和方法····················································134.1厂区室外消防给水管道安装施工工序·································134.2厂区室外生活污水管道安装施工工序·································194.3管沟施工··························································204.4质量控制计划······················································214.5施工过程控制规范··················································245、质量控制点的设置和质量通病预防····································245.1质量目标··························································245.2质量控制及质量通病预防···········································245.3室外管网安装的控制点的设置·······································245.4质量标准及要求···················································256、作业的安全和作业的安全危害因素辨识和控制···························256.1作业的安全要求····················································256.2施工危险因素和环境因素辨识及对策表································277、《二十五项反措》和《强条》要求及保证措施···························307.1《施工现场临时用电安全技术规范》···································307.2《建筑机械使用安全技术规程》·······································317.3《二十五项反措》要求及保证措施····································32建筑-51-01厂区消防0/A2厂区地下管网安装作业指导书1、工程概况1.1工程概况长春热电一厂扩建工程,本期新建2×350MW供热机组,2×1110吨/时超临建筑-51-01厂区消防0/A3界煤粉锅炉.计划建设规模1300MW,二期2×300MW供热机组。地址位于长春市宽城区马家村。本工程为厂区施工消防工程,消防水主管道设计管径为φ108-φ325,管道总长约为3130米,管道埋深在自然地面以下2000mm。室外地下式消火栓图纸设计为28套,管材采用Q235B焊接钢管,管材防腐采用加强级环氧煤沥青防腐层,结构为底漆一面漆一面漆、玻璃布、面漆一面漆,管道通水运行后工作压力为1.15MPa,水压试验压力为1.65MPa。1.2工程范围及工程量厂区施工消防水主管道:管道安装总长约17t,室外地下式消火栓安装28套,明杆闸阀23套。工程量见施工材料统计表。1.3施工工期:按甲方要求2、编制参考资料表序号资料名称编号备注1《电力建设安全工作规程》DL5009.1—20022给水排水管道工程施工及验收规范GB50268-20083建筑给排水及采暖工程施工质量验收规范GB50242-2002424《电力建设施工及验收技术规范》DL5031-94管道篇5厂区室外消防给水管道平面布置图6厂区室外消火栓管道系统图7厂区室外生活污水管道平面布置图8厂区室外生活污水管道系统图9厂区室外工业水、生活水管道平面布置图10厂区室外工业水管系统图序号资料名称编号备注11厂区室外生活水管系统图建筑-51-01厂区消防0/A412甲方委托、设计变更等技术图纸、资料13电力建设工程施工质量监督(安装工程)14设备安装工程禁忌手册15以往类似工程的施工技术资料16《室外给水管道附属构筑物》17《室外消火栓安装》18《埋地钢管的防腐》19《沟槽开挖及回填、管道垫层》20《涂装前钢材表面锈蚀等级和除锈等级》21《石油化工给排水管道工程施工及验收规范》22《给水钢丝网骨架塑料(聚乙烯)复合管管道工程技术规程》23《给水排水管道工程施工及验收规范》24《砖砌化粪池》25《排水检查井》26《埋地高密度聚乙烯中空壁缠绕结构排水管道工程技术规程》27《埋地硬聚氯乙烯排水管道工程技术规程》3、作业前的条件和准备3.1技术准备施工图纸齐全,由安装技术负责人组织技术员进行与室外消防管道安装施工相关的图纸审核,并由项目部工程管理部门组织与室外消防管道安装相关专业进行图纸会审,图纸经审核无误。建筑-51-01厂区消防0/A5施工方案已确定,并经项目部专业技术负责人审核批准。组合平台、起吊工具等施工措施、方案设计完毕,施工图、材料预算等经审核批准。作业指导书编制完毕。技术人员按照施工作业指导书,已对施工人员进行技术、质量、安全交底,并进行交底双签字。3.2作业人员施工前应建立健全的质量管理体系和工程质量检测制度。施工组织应设立技术组、质安组、管道班、电气焊班、开挖班、测量班等。施工人员数量根据工程规模和工程量的大小确定,一般应配备的人员有:给排水专业技术人员,测量工、管道工、电焊工、气焊工、起重工、油漆工等。3.2.1作业人员配置、资格序号作业人员工种数量资格要求资质1技术员1能够审清本项目施工图纸,领会设计思想,掌握施工工艺,熟悉施工质量和安环要求。助工以上2班组长2熟悉本项目施工的工艺流程,能有效组织好施工人员按照作业指导书的要求施工,熟悉施工质量和安环要求。中级工3安装工12熟练掌握本项目的技术、工艺要求,知道施工质量、安环要求。中、初级工4测量工2熟练掌握测量的基本知识和技能、施工工艺精度要求。中级工5焊工4熟悉焊接工艺及相关要求,具有与焊接项目相符合的焊工合格证书。持证6起重工4熟悉所操作吊车的机械性能,技术熟练。持证建筑-51-01厂区消防0/A67油漆工4熟练掌握本项目的技术、工艺要求,知道施工质量、安环要求。中、初级工3.2.2作业人员职责分工和权限序号岗位名称职责分工和权限1技术员1.全面负责室外消防管道安装的技术工作,参加相关图纸会审,处理设计变更,编制施工作业指导书、施工预算、技术、安全措施,并主持技术交底工作。2.深入现场指导施工,及时发现和解决施工中的技术、质量隐患,按照指导书的要求指导施工。3.配合班组长进行施工验收的自检工作。4.记录、整理施工记录和验收记录。5.对违章操作,有权制止,严重者可令其停工,并及时向有关领导汇报。2班组长1.负责组织安排施工人力,物力。严格按照作业指导书的施工工艺要求,质量要求和安全环境要求进行施工。全面负责质量、安全工作。2.做好输煤系统室外消防、工业水、生活水及生活污水管道安装的质量自检和工序交接工作。3.施工过程中,图纸不清不施工,材料不合格不施工,技术、安全不交底不施工,上一级工序验收不合格不施工。4.发生质量、安全事故立即上报,同时组织本班级组职工按照“三不放过”的原则认真分析。3作业人员1.严格按照作业指导书的施工工艺要求、质量要求和安全环境要求进行施工。2.爱护施工所用工器具,严格按照操作规程作业。3.发生质量、安全事故应保护好现场,并迅速告知有关领导,做好处理工作。建筑-51-01厂区消防0/A74.有疑难问题有权向技术人员、班组长请示解决办法,对自己的施工质量全面负责,对不正确、不明确的指挥有权不执行。序号岗位名称职责分工和权限4质检人员1.熟悉相关图纸内容和有关质量标准,参加图纸会审,技术交底。2.深入施工现场,掌握工程进度及质量情况,按照质量标准进行二级质量验收工作,配合项目部质检师,监理完成三级,四级质量验收。对工作要一丝不苟,不殉私情。3.对不能保证施工质量的方案提出否决建议,请有关领导部门处理。4.整理、汇总质量验收记录。5安监人员1.全面负责系统水消防、喷雾、冲洗装置安装安装工作的安全。2.参加对指导书的审核工作,参加安全交底双签字工作,在工作中认真检查指导书的执行情况。3.深入现场施工一线,及时发现事故隐患和不安全因素,督促采取防患措施,有权责令先停止工作,并立即研究处理。4.做好事故的调查,分析和处理工作。3.3作业工机具(包括配置、等级、精度等)施工作业工机具统计表序号机具名称规格用途1电动套丝机DN100套丝连接2砂轮机1.1KW切割管材3砂轮锯φ300mm磨光4试压泵0~4MPa电动、手动试压5电焊机BX型焊接建筑-51-01厂区消防0/A86手锤1.0kg、1.5kg打口7弯管器φ80mm弯管8捻凿1#、2#、3#打口、自制序号机具名称规格用途9液压铸管切割器YZGJ-A天津塘沽机床附件厂10空压机6M3吹扫11套丝扳DN80mm套丝连接12管子割刀1~4#切割管材13倒链1t、2t、5t、提升14管钳150~600mm夹持管材15麻绳φ20捆绑16虎钳15~115夹持管子直径17铁锹2~4#挖沟18铁镐2.5~4Kg挖沟19大锤5~8Kg挖沟20挖掘机50型挖沟21手动葫芦拉力器>φ100mm胶圈连接22热熔式连接器与管子配套热熔连接23活扳手100~600mm紧固24角向磨光机φ150内磨光25直向电动砂轮机φ100内坡口其它小工具有:画线笔、毛刷、板锉、钢锯、板斧、撬杠等施工测量仪器表序号测量装置名称规格型号备注1水准仪DSZ10、DS10测量标高2经纬仪J2测量角度3水平尺150~600mm测量水平度4压力表0~2.5Mpa、φ150水压试验5钢卷尺3m、5m、30m测量长度建筑-51-01厂区消防0/A96游标卡尺0~300mm、0.02mm测量管材直径7塞尺150A14测量胶圈接口3.4材料和设备3.4.1施工材料施工材料统计表表1、室外消防管道主要材料汇总表序号名称规格及型号单位数量材料备注1可曲挠橡胶接头DN300,PN1.6Mpa,GJQ(X)-DF(Ⅱ)型个5成品2可曲挠橡胶接头DN250,PN1.6Mpa,GJQ(X)-DF(Ⅱ)型个2成品3钢丝网骨架塑料复合管dn315,PN=1.6Mpa米248PE100配套电熔直接4钢丝网骨架塑料复合管dn250,PN=1.6Mpa米186PE100配套电熔直接5钢丝网骨架塑料复合管dn160,PN=1.6Mpa米33PE100配套电熔直接6钢丝网骨架塑料复合管dn110,PN=1.6Mpa米228PE100配套电熔直接7电熔法兰连接件D315套10PE100配套PN1.6Mpa法兰盘片配套螺栓、螺母、垫片8电熔法兰连接件D250套4PE100配套PN1.6Mpa法兰盘片配套螺栓、螺母、垫片9电熔法兰连接件D160套2P
本文标题:国华惠州大亚湾热电厂2
链接地址:https://www.777doc.com/doc-3486228 .html