您好,欢迎访问三七文档
当前位置:首页 > 建筑/环境 > 工程监理 > 自反力测桩方案样本1
注:本文件仅用作项目实施方案样本。请使用者根据具体项目,进行适当删改。项目名称:__________________________项目地点:__________________________试桩编号:__________________________委托单位:__________________________设计单位:__________________________检测单位:__________________________编制单位:__________________________文件编号:__________________________编制日期:__________________________自反力测桩项目实施方案自反力测桩项目实施方案CIEDPage1of15《目录》桩基技术资料---------------------------------------------------------------------------------------------2自反力测桩-技术方案---------------------------------------------------------------------------------3试桩参数:---------------------------------------------------------------------------------------------3加载方案------------------------------------------------------------------------------------------------3位移测量方案------------------------------------------------------------------------------------------3应力测量方案------------------------------------------------------------------------------------------4数据监控记录------------------------------------------------------------------------------------------4试验结论得出------------------------------------------------------------------------------------------4自反力测桩-仪器设备---------------------------------------------------------------------------------5加载装置------------------------------------------------------------------------------------------------5加载动力源---------------------------------------------------------------------------------------------5数据采集------------------------------------------------------------------------------------------------5位移传递------------------------------------------------------------------------------------------------5位移数据读取、记录---------------------------------------------------------------------------------5自反力测桩-实施步骤---------------------------------------------------------------------------------6自反力测桩-实施要求---------------------------------------------------------------------------------7自反力测桩-物料准备(单桩)--------------------------------------------------------------------9附件:自反力测桩法简介----------------------------------------------------------------------------10自反力测桩法基本概念-----------------------------------------------------------------------------10自反力测桩法实施原理-----------------------------------------------------------------------------10自反力(自平衡)测桩法有哪些优势-----------------------------------------------------------11自反力(自平衡)测桩法是否有标准实施方案-----------------------------------------------11自反力(自平衡)测桩法之争论-----------------------------------------------------------------12附件:囊式荷载箱简介--------------------------------------------------------------------------------13自反力测桩项目实施方案CIEDPage2of15桩基技术资料1.地质资料2.试桩目的:得出各土层实际摩阻力性能验证桩基承载设计安全性。验证施工工艺的合理性和安全性。3.试验依据:《基桩静载试验自平衡法》(JT/T738-2009交通运输部)编号岩土描述标高(M)深度(M)传感器编号传感器位置(深度,米)厚度(M)桩周土极限摩阻力(Kpa)地面-0.730.000.000.002b淤泥质亚粘土-10.639.90s19.909.9012.004a淤泥质亚粘土s215.005.1018.004a淤泥质亚粘土s320.005.0018.004a淤泥质亚粘土-26.9326.20s426.206.2018.004b粘土s531.004.8020.004b粘土-37.6336.90s636.905.9020.006a亚粘土-39.0338.30s738.301.4035.006b粘土s843.004.7038.006b粘土s947.004.0038.006b粘土-50.5349.80s1049.802.8038.007a亚粘土s1153.503.7050.007a亚粘土-57.6356.90s1256.903.4050.008a粉砂-60.1359.40s1359.402.5065.008c圆砾-61.3360.6060.601.2085.009粘土-64.2363.50s1463.502.9065.0010a粉砂-68.6367.90s1567.904.4070.0010c亚粘土s1672.004.1065.0010c亚粘土-76.5375.80s1775.803.8065.0011a中砂-78.9378.20s1878.202.4085.0011b亚粘土-80.4379.70s1979.701.5070.0011c卵石-83.1382.40s2082.402.7080.00自反力测桩项目实施方案CIEDPage3of15自反力测桩-技术方案试桩参数:桩基编号桩基性质桩孔直径桩孔深度载荷性质试验载荷荷载箱位置1#钻孔灌注桩2000mm82.4M抗压30000KN68.0M加载方案1.加载分级:以预估极限值30000kN的50%为依据,即:15000kN为试验加载极限值,分为10级,每一级为1500kN。2.加载方法:加载分级进行,采用逐级等量加载;其中第一级取分级荷载的2倍。当桩顶沉降速率达到相对稳定标准时,再施加下一级荷载。3.相对稳定标准:每一小时内的桩顶位移量不超过0.1mm,并连续出现两次(从每级荷载施加后第30min开始,由三次或三次以上每30min的沉降观测值计算)。4.卸载:卸载分级进行,每级卸载量取加载时分级荷载的2倍,逐级等量卸载。5.加载数据记录:每级加载后在第1h内观察第5、15、30、45、60min的位移值,以后每隔30min观察一次,以判断稳定状态。同时电脑监控系统自动同步进行位移记录。6.卸载数据记录:卸载时,每级卸载值为每级加载值的2倍。每级荷载维持1h,卸载后隔15min测读一次残余沉降,读两次后,隔30min再读一次,即可卸下一级荷载,全部卸载后,隔3~4h再读一次。电脑监控系统同步记录参与位移值。7.终止加载条件:a)某级荷载作用下,桩顶沉降量大于前一级荷载作用下沉降量的5倍。(注:当桩顶沉降能稳定且总沉降量小于40mm时,宜加载至桩顶总沉降量超过40mm。)b)某级荷载作用下,桩顶沉降量大于前一级荷载作用下沉降量的2倍,且经24h尚未达到稳定标准。c)已达加载装置的最大加载量。d)当荷载–沉降曲线呈缓变型时,可加载至桩顶总沉降量60~80mm;在特殊情况下,可根据具体要求加载至桩顶累计沉降量超过80mm。位移测量方案1.同时监控并记录三层位移数据:荷载箱下部位移(下位移)、荷载箱上部位移(上位移)和桩顶位移(顶位移)。每层位移测量点为3个均布。自反力测桩项目实施方案CIEDPage4of152.位移测量基准梁跨距12米。应力测量方案1.应力计采用钢筋计,规格型号为________。2.根据地质资料,应力计埋设20层(S1~S20),每层对称均布3个测量点。数据监控记录1.按照规定时间频率,同时监控并记录时间、载荷、位移、应力数据。2.数据监控和记录由电脑自动完成。试验结论得出1.根据规范,对上、下部桩体同时进行加载,任一部分满足终止加载条件时,即停止加载。2.根据试验数据,分别绘制上、下部分的Q-S曲线和S-LogT曲线。3.根据上述曲线进行分析,分别得出上、下部分的桩基极限承载能力。4.根据试验数据,绘制各监测层应力的Q-σ分布变化曲线,并通过计算,进而绘制各监测层摩阻力的Q-Qsk分布变化曲线。5.结合上述试验数据及计算结果,得出各土层实际承载性能,以及桩基安全性结论。自反力测桩项目实施方案CIEDPage5of15自反力测桩-仪器设备加载装置采用囊式荷载箱,由_7_个压力单元N2D400装配而成,总推力1645吨。压力单元的的率定曲线(公式)由计量部门标定。荷载箱埋设深度为65米。加载动力源荷载箱由位于地面的液压站,通过埋设的高压油管向荷载箱分级加载油压。数据采集试验采用三组位移数据,分别为下位移(下部桩体位移,测量点位于荷载箱下约1米位置)、上位移(上部桩体位移,测量点位于荷载箱上约1米位置)和顶位移(测量点位于桩顶)。位移传递上位移和下位移各采用2条位移杆(丝)对称布置,传递位移。位移丝(杆)一端与测量点固定,另一端上延至地面。顶位移测量与传统试验方法相同。每条位移丝(杆)皆采用保护管实施保护,用于隔离位移杆与桩体混凝土,保证位移杆与测量点同步顺畅移动。位移数据读取、记录位移数据采用电子传感器采集,在位移丝(杆)地面端读取,数据自动传输至电脑测量仪进行显示、记录、处理。自反力测桩项目实施方案CIEDPage6of15
本文标题:自反力测桩方案样本1
链接地址:https://www.777doc.com/doc-3527029 .html