您好,欢迎访问三七文档
当前位置:首页 > 建筑/环境 > 设计及方案 > 61水利工程施工组织设计
*********************工程施工组织设计1目录第一章编制依据及原则········································································1第二章工程概述·················································································3第三章施工总布置···············································································5第四章施工总体方案与进度计划···························································7第五章项目组织机构·········································································10第六章主要施工方法简述···································································15第七章质量管理体系与措施······························································50第八章安全管理体系与措施·······························································63第九章应急管理·············································································78第十章环境保护管理体系与措施······················································80第十一章资源配备计划·······································································83*********************工程施工组织设计1第一章编制依据及原则一、编制依据1、依据本工程《********************************工程施工图设计图册》与《********************************工程工程地质勘察报告》2、施工合同、工程量清单及施工图会审纪要。3、现行有关施工规范、标准、规程。4、本公司的技术力量及施工机械设备。本工程在充分参考以上资料及相关信息的前提下,经专业技术人员精心安排、严谨构思后组织编写。本施工组织设计未尽事项,今后在施工过程中可在此设计的基础上,根据实际情况进一步进行科学的完善和补充。二、编制原则1、认真贯彻国家对工程建设的各项方针和政策,严格执行工程建设程序。遵守招标文件的规定与投标书的承诺。2、保证重点,统筹安排,遵循建筑施工工艺及其技术规律,坚持合理的施工程序和施工顺序。3、采用流水施工方法、工程网络计划技术和其它现代管理方法,组织有节奏、均衡和连续地施工。4、尽量利用先进施工技术,科学地确定施工方案。5、严格控制工程质量,确保安全施工,努力缩短工期,不断降低工程*********************工程施工组织设计2成本。6、充分利用现有施工机械和设备,扩大机械化施工范围,提高施工项目机械化程度,不断改善劳动条件,提高劳动生产率。7、科学地安排冬期和雨季施工项目,保证全年施工的均衡性和连续性。8、科学地规划施工平面图,减少施工用地,合理储存建设物资,减少物资运输量。*********************工程施工组织设计3第二章工程概述一、工程概况工程建设地点:********************************。工程规模:本项目的主要建设内容为:工程包括开挖蓄洪湖、新建进水闸、排水泵站和调水泵站、厂房、管理楼及篮球场等。设计库容为151.39万立方米,死库容为8.76万立方米;水闸总净宽32米,设计过闸流量151.2立方米/秒;排水泵站设计流量为12.27立方米/秒,装机容量为1260千瓦;调水泵站设计流量为0.95立方米/秒。二、水文地质工程区位于********************************,在茅湾涌与西山涌汇合处东南侧,地下水属潜水类型,赋存于第四系地层中,受大气降水及地表水补给,水位变化明显受地表河涌水变化的影响,第四系各地层多处于饱和状态。地下水主要受大气降水补给,地表水径流、河流对地下水的补给、排泄及水量、水位变化,均构成较大影响。茅湾涌水对混凝土无腐蚀性,对钢筋混凝土结构中钢筋无腐蚀蚀性,对钢结构具有弱腐蚀性;地下水对混凝土无腐蚀性,对钢筋混凝土结构中钢筋无腐蚀性,对钢结构具有弱腐蚀性。中山市三乡蓄水湖工程区地处珠三角地带,为河流冲淤积滩地,属珠江三角洲冲淤积平原及剥蚀残丘地貌。其工程区都位于********************************,在茅湾涌与西山涌汇合处东南侧,*********************工程施工组织设计4河涌水下地形较平坦,地面高程起伏不大。北东、南面主要穿越菜地、稻田以及公路、居民区,场地通视条件较好。根据工程性质,分别对两条围堤进行评价。现分述如下:蓄水湖围堤地基土分层:场地岩土层主要由第四系人工填土层、现代河流冲积层和滨海相沉积层以及燕山期基岩组成。岩土可分8个工程地质层,自上而下依次为:①人工填土、②粉质粘土、③粘土质中粗砂、④-1淤泥、夹砂淤泥、④-2含贝壳淤泥质粘土、⑤-1粘土、⑤-2砂质粘土、⑥-1粘土质中粗砂、⑥-2粘土质砾砂、⑦-1砂质粘土、⑦-2粘土、⑧-1(全风化)花岗岩、⑧-2(强风化)花岗岩、⑧-3(弱风化)花岗岩。整个堤围堤基地质结构可划分为双层结构(Ⅱ)和多层结构(Ⅲ):其中双层结构(Ⅱ)细分为Ⅱ1表层为一般粘性土,中下部为淤泥,桩号为0+000~0+300;Ⅱ2表层为粘性土,上部为软土,中下部为砂层,桩号为0+500~1+700、2+120~2+520;多层结构(Ⅲ)细分为Ⅲ1表层为粘性土,上部为砂层,中部为淤泥,下部为粘土,桩号为0+300~0+500;Ⅲ2上部为软土、中下部为砂层,下部为粘土,桩号为1+700~2+120。西山涌出口右岸围堤岩土可分3个工程地质层,自上而下依次为:②粉质粘土、④-1淤泥、⑤-1粘土,整个堤围堤基地质结构为双层结构(Ⅱ1),其Ⅱ1表层为一般粘性土,中下部为淤泥。*********************工程施工组织设计5第三章施工总布置针对本工程特点和地形条件,结合方便施工、方便管理的要求,施工临时设施主要采取集中和分散相结合的方式布置,总的布置原则如下:1、因地制宜,充分利用堤顶、堤坡及永久和临时征地。2、尽量少占用农田、果园及城镇生产生活区等。3、临时生活设施充分利用各施工工地附近现有设施。一、施工用地根据本工程施工特性及主体建筑物布置特点,临时设施均采用集中布置,设有临时仓库、临时工棚。其中临时仓库布置在水闸附近,临时工棚布置在西山涌右侧居民区闲置地。办公设施用房租借当地民房。二、场内外交通场外交通:工程所处地三乡镇西山村、古鹤村公路交通网发达,与周边城市有各种等级公路相通。场内交通:工程内部交通拟沿现有乡村道路向施工区域延伸,内部道路以满足土方开挖运输、原材料进场、半成品转运为原则进行布置。三、施工用水施工用水包括生产用水和生活用水,生产用水主要是搅拌桩施工、块石砌筑、砼养护和土料洒水,可以用河道取水;生活用水由附近自来水管接入取水。四、施工用电*********************工程施工组织设计6施工用电主要为桩基工程和砼工程用电,负荷较大,除在西山涌右侧630KV变压器处接入临时用电线路外,另距离变压器较远的施工区域采用移动式柴油发电机进行补给。电网供给的临时用电主要覆盖西山涌侧的围堤和水闸、排水泵站、调水泵房、厂房及管理楼等。五、施工通讯施工区域现有网络发达,可以满足工程施工指挥调度要求。*********************工程施工组织设计7第四章施工总体方案与进度计划一、施工总体方案根据工程项目特征和利于施工管理的原则,本工程分为两个工区,具体为:一工区:水闸、调水泵房、排水泵站、厂房、管理楼、管理码头及篮球场工程。二工区:围堤工程、南侧跨河箱涵。主体工程施工总体安排:桩基工程→土方开挖回填→结构施工→金属结构安装→电气工程→装饰工程。二、进度计划施工总工期:施工计划工期:12个月,初步计划从2016年11月31日至2017年11月31日,工期以实际开工日期为准。详细施工进度计划见附件1、********************************工程进度计划表。三、施工进度保证措施1、施工组织保证措施我们将充分利用现有资源,并给于必要补充。立即组建潮州市利源水利水电工程有限公司********************************工程项目部,按项目法组织施工,把该工程列为重点施工项目直接进行管理,配备强有力的项目领导班子和施工管理人员,对工程进行有效的管理和控制。(1)为确保合同要求的施工工期,在人力、物资、机械设备、资金等资源配置方面给予充分的保证。(2)按项目法组织施工,施工现场成立高效运行的项目部,项目部的主要施工技术人员和管理人员,由多年从事类似工程施工的专业技术人员和管理人员组成。(3)工程开工前,编制严谨的实施性施工网络计划,找出关键工序、*********************工程施工组织设计8关键工期、制定关键线路。施工按既定的施工网络计划组织安排,在确保关键线路控制工期的前提下,全面兼顾和协调各单项工程的进度。(4)编制计划时充分考虑施工现场各种干扰因素可能对工期造成的延误及相应的预防与补救措施,进度计划作业指标要留有余地,以便当发生工期延误时能立即进行调整。(5)根据总进度计划编制季、月、周计划,并根据实施过程中的完成情况,及时与原计划进行对比,对实际施工过程中出现的进度滞后及时查找、分析原因,并及时进行计划调整,确保施工总进度计划的实现。(6)按施工组织计划,合理配置劳动力,配备足够数量的机械设备并保持完好率,根据计划及时采购工程施工所需的各种材料,避免停工待料现象的发生,确保材料供应。(7)严格执行工地计划会制度,工地每天由施工安全办召开各施工班组进度计划会,项目副经理参加,落实当日计划完成情况,确定第二天工作计划,重大问题向项目经理汇报。每周由项目经理部组织召开周进度计划会,检查上周的计划完成情况,下达下周的工作计划,解决施工问题,对进度的情况进行分析,并制定具体的改进方案,在人、材、机投入上及时进行调整,确保进度计划的实施,重大问题及时报局组织协调。(8)根据总体目标和施工进度、施工难点、施工条件等特点,充分利用以前的施工经验,提前分析、预测可能发生的工序间配合衔接不到位的情况,及早采取有效措施,抓住重点,优化资源组合,合理调配劳力、机械设备,确保施工工期。(9)全面实行经济承包责任制,把职工的经济收入同生产效益、安全质量直接挂钩,充分调动管理人员和施工人员的积极性。(10)搞好外部协调措施,主动接受工地所在政府的领导,加强与政府各部门的联系,融洽与当地群众的关系,争取他们的支持,创造良好的外部环境,使工程顺利进行。2、技术管理保证措施我单位将按ISO9001:2000质量管理体系的标准,建立以技术负责人*********************工程施工组织设计9为核心的技术保证体系。加强现场技术服务工作,坚持主要技术干部、技术骨干分工负责制的作法,深入工地第一线,与作业层技术骨干及技术工人落实、完善相关技术措施,真正作到技术方案对现场施工有指导性和控制性。3、质量管理保证措施我单位将按照“提高员工素质、规范工作行为、追求完美品质、满足用户要求”的质量方针。严格按照ISO9
本文标题:61水利工程施工组织设计
链接地址:https://www.777doc.com/doc-4095459 .html