15.1.2发电工程质量检验及评定范围表(表2.0.2)发电工程质量检验及评定范围表(表2.0.2)及验收签证、记录项目(表5.0.5)出自DL/T5161.1-2002《电气装置安装工程质量检验及评定规程》第一部分:通则。表2.0.2发电工程质量检验及评定范围表工程编号工程项目名称性质质检机构验评范围质量验评及签证表编号单位工程分部工程分项工程施工单位监理单位建设单位班组工地质检部1发电机电气与引出线安装√√√√DL/T5161.1-表4.0.31发电机电气与出线设备安装√√√√DL/T5161.1-表4.0.21发电机本体检查主要√√√√√DL/T5161.7-表1.0.12发电机附件安装主要√√√√DL/T5161.7-表1.0.23励磁设备检查安装√√√√DL/T5161.7-表2.1.2DL/T5161.3-表1.0.14互感器检查安装√√DL/T5161.3-表3.0.15箱、柜(盘)安装√√DL/T5161.8-表1.0.2DL/T5161.8-表2.0.1DL/T5161.8-表4.0.2DL/T5161.8-表6.0.26电阻器安装√√DL/T5161.12-表3.0.27交(直)流励磁母线安装主要√√√√DL/T5161.4-表3.0.22发电机引出线安装√√√√DL/T5161.1-表4.0.21铁构架制作安装√√DL/T5161.4-表1.0.2DL/T5161.4-表1.0.32封闭母线安装主要√√√√DL/T5161.4-表5.0.23电压互感器、避雷器安装√√√√DL/T5161.3-表3.0.1DL/T5161.2-表6.0.24隔离开关安装√√DL/T5161.2-表5.0.15负荷开关安装主要√√√√DL/T5161.2-表5.0.210发电机启动试运主要√√√√DL/T5161.7-表3.0.72主变压器系统设备安装√√√√DL/T5161.1-表4.0.31主变压器安装√√√√DL/T5161.1-表4.0.21主变压器本体安装√√√√DL/T5161.3-表1.0.3-12主变压器检查主要√√√√√DL/T5161.3-表1.0.3-23主变压器附件安装√√√√DL/T5161.3-表1.0.3-34主变压器注油及密封试验主要√√√√DL/T5161.3-表1.0.3-45主变压器整体试验主要√√√√DL/T5161.3-表1.0.3.52主变压器系统附属设备安装√√√√DL/T5161.1-表4.0.21中性点隔离开关安装√√√√DL/T5161.2-表5.0.12避雷器安装√√√√DL/T5161.2-表6.0.23控制柜及端子箱检查安装√√DL/T5161.8-表4.0.22续表2..0.2工程编号工程项目名称性质质检机构验评范围质量验评及签证表编号单位工程分部工程分项工程施工单位监理单位建设单位班组工地质检部4软母线安装√√√√DL/T5161.4-表7.0.210主变压器带电试运主要√√√√DL/T5161.3-表4.0.93×××kV配电装置安装√√√√DL/T5161.1-表4.0.31网控室设备安装√√√√DL/T5161.1-表4.0.21控制及保护屏台安装√√DL/T5161.8-表1.0.2DL/T5161.8-表5.0.22直流屏及充电设备安装√√DL/T5161.13-表2.0.23二次回路检查及接线√√DL/T5161.8-表7.0.24蓄电池安装√√√√DL/T5161.9-表1.0.2DL/T5161.9-表2.0.25充放电及容量测定√√√√DL/T5161.9-表3.0.3DL/T5161.9-表3.0.42主母线及旁路母线安装√√√√DL/T5161.1-表4.0.21绝缘子串安装√√DL/T5161.4-表2.0.22软母线安装√√√√DL/T5161.4-表7.0.23支柱绝缘子安装√√DL/T5161.4-表2.0.34管形母线安装主要√√√√DL/T5161.4-表6.0.25隔离开关安装√√√√DL/T5161.2-表5.0.13电压互感器及避雷器间隔安装√√√√DL/T5161.1-表4.0.21避雷器安装√√DL/T5161.2-表6.0.22电压互感器安装√√DL/T5161.3-表3.0.23隔离开关安装√√√√DL/T5161.2-表5.0.14支柱绝缘子安装√√DL/T5161.4-表2.0.35引下线及跳线安装√√√√DL/T5161.4-表7.0.26箱柜安装√√DL/T5161.8-表1.0.2DL/T5161.8-表4.0.24×××kV进出线(母联、分段及旁路)间隔安装√√√√DL/T5161.1-表4.0.21隔离开关安装√√√√DL/T5161.2-表5.0.12断路器安装主要√√√√DL/T5161.2-表2.0.1DL/T5161.2-表2.0.23电压(流)互感器安装√√DL/T5161.3-表3.0.24避雷器安装√√DL/T5161.2-表6.0.25电抗器安装主要√√√√DL/T5161.3-表1.0.26高频载波通道设备安装√√DL/T5161.3-表2.0.23续表2.0.2工程编号工程项目名称性质质检机构验评范围质量验评及签证表编号单位工程分部工程分项工程施工单位监理单位建设单位班组工地质检部7穿墙套管安装√√DL/T5161.4-表2.0.48支柱绝缘子安装√√DL/T5161.4-表2.0.39引下线及跳线安装√√√√DL/T5161.4-表7.0.210箱柜安装√√DL/T5161.8-表1.0.2DL/T5161.8-表4.0.25铁构架及网门安装√√√√DL/T5161.1-表4.0.21铁构架及网门安装√√DL/T5161.4-表1.0.2DL/T5161.4-表1.0.310×××kV配电装置带电试运主要√√√√DL/T5161.1-表5.0.5-14×××kV封闭式组合电器安装√√√√DL/T5161.1-表4.0.31网控室设备安装√√√√DL/T5161.1-表4.0.21控制及保护屏台安装√√DL/T5161.8-表1.0.2DL/T5161.8-表5.0.22直流屏及充电设备安装√√DL/T5161.3-表2.0.23二次回路检查及接线√√DL/T5161.8-表7.0.24蓄电池安装√√√√DL/T5161.9-表1.0.2DL/T5161.9-表2.0.25充放电及容量测定√√√√DL/T5161.9-表3.0.3DL/T5161.9-表3.0.42封闭式组合电器检查安装√√√√DL/T5161.1-表4.0.21基础检查及设备支架安装√√DL/T5161.2-表1.0.12封闭式组合电器本体检查安装主要√√√√DL/T5161.2-表1.0.23电压互感器、避雷器安装主要√√√√DL/T5161.3-表3.0.1DL/T5161.2-表6.0.23封闭式组合电器配套设备安装√√√√DL/T5161.1-表4.0.21电压(流)互感器安装√√DL/T5161.3-表3.0.1DL/T5161.3-表3.0.22避雷器安装√√DL/T5161.2-表6.0.23高频载波通道设备安装√√DL/T5161.3-表2.0.24软母线安装√√√√DL/T5161.4-表7.0.24就地控制设备安装√√√√DL/T5161.1-表4.0.21控制柜及端子箱安装√√DL/T5161.8-表1.0.2DL/T5161.8-表4.0.22二次回路检查及接线√√DL/T5161.8-表7.0.210×××kV封闭式组合电器电带试运主要√√√√DL/T5161.2-表8.0.85控制及直流系统设备安装√√√√DL/T5161.1-表4.0.31控制室设备安装√√√√DL/T5161.1-表4.0.24续表2.0.2工程编号工程项目名称性质质检机构验评范围质量验评及签证表编号单位工程分部工程分项工程施工单位监理单位建设单位班组工地质检部1单控室控制及保护屏台安装√√DL/T5161.8-表1.0.2DL/T5161.8-表5.0.22单控室二次回路检查及接线√√DL/T5161.8-表7.0.22直流系统设备安装√√√√DL/T5161.1-表4.0.21直流屏及充电设备安装√√DL/T5161.8-表1.0.2DL/T5161.13-表2.0.22二次回路检查及接线√√DL/T5161.8-表7.0.23蓄电池安装√√√√DL/T5161.9-表1.0.2DL/T5161.9-表2.0.24充放电及容量测定主要√√√√DL/T5161.9-表3.0.3DL/T5161.9-表3.0.46厂用高压变压器安装√√√√DL/T5161.1-表4.0.31厂用高压工作变压器安装√√√√DL/T5161.1-表4.0.21变压器本体安装√√DL/T5161.3-表1.0.3-12变压器检查主要√√√√√DL/T5161.3-表1.0.3-23变压器附件安装√√DL/T5161.3-表1.0.3-34变压器注油及密封试验主要√√√√DL/T5161.3-表1.0.3-45控制及端子箱安装√√DL/T5161.8-表1.0.2DL/T5161.8-表4.0.26低压侧共箱封闭母线安装主要√√√√DL/T5161.4-表1.0.2DL/T5161.4-表4.0.27变压器整体检查主要√√√√DL/T5161.3-表1.0.3-510.1厂用高压工作变压器带电试运主要√√√√DL/T5161.3-表4.0.92厂用高压备用变压器安装√√√√DL/T5161.1-表4.0.21变压器本体安装√√DL/T5161.3-表1.0.3-12变压器检查主要√√√√√DL/T5161.3-表1.0.3-23变压器附件安装√√DL/T5161.3-表1.0.3-34变压器注油及密封试验主要√√√√DL/T5161.3-表1.0.3-45控制及端子箱安装√√DL/T5161.8-表1.0.2DL/T5161.8-表4.0.26低压侧共箱封闭母线安装主要√√√√DL/T5161.4-表1.0.2DL/T5161.4-表4.0.27软母线安装主要√√√√DL/T5161.4-表7.0.28变压器整体检查主要√√√√DL/T5161.3-表1.0.3-510.2厂用高压备用变压器带电试运主要√√√√DL/T5161.3-表4.0.97主厂房厂用电系统设备安装√√√√DL/T5161.1-表4.0.35续表2.0.2工程编号工程项目名称性质质检机构验评范围质量验评及签证表编号单位工程分部工程分项工程施工单位监理单位建设单位班组工地质检部1厂用高压配电装置安装√√√√DL/T5161.1-表4.0.21盘柜基础安装√√DL/T5161.8-表1.0.22配电盘安装√√DL/T5161.8-表2.0.1DL/T5161.8-表2.0.23母线安装主要√√√√DL/T5161.4-表3.0.24断路器检查主要√√√√DL/T5161.2-表3.0.2DL/T5161.2-表4.0.25二次回路检查及接线√√DL/T5161.8-表7.0.22厂用低压配电装置安装√√√√DL/T5161.1-表4.0.21变压器安装主要√√√√DL/T5161.3-表1.0.1DL/T5161.3-表1.0.22PC(动力中心)盘安装主要√√√√DL/T5161.8-表1.0.2DL/T5161.8-表3.0.2DL/T5161.12-表1.0.23母线安装主要√√√√DL/T5161.4-表3.0.24二次回路检查及接线√√DL/T5161.8-表7.0.23汽机间电气设备安装√√√√DL/T5161.1-表4.0.21MCC(电动机控制中心)盘安装√√DL/T5161.8-表1.0.2DL/T5161.8-表3.0.3DL/T5161.12-表1.0.2DL/T5161.4-表3.0.22就地动力控制设备安装√√DL/T5161.8-表1.0.2DL/T5161.8-表4.0.23二次回路检查及接线√√DL/T5161.8-表7.0
本文标题:发电工程质量检验及评定范围表
链接地址:https://www.777doc.com/doc-428039 .html