郑东新区热电有限公司一期2×200MW机组工程凝结水系统调试方案-1-河南第一火电建设公司调试所编号:8080-HNHY-TSJ-A05-005河南第一火电建设公司调试所工程名称:郑东新区一期2×200MW机组工程项目名称:凝结水系统调试方案编制单位:河南第一火电建设公司调试所出版日期:2007年07月05日调试作业指导书郑东新区热电有限公司一期2×200MW机组工程凝结水系统调试方案-2-河南第一火电建设公司调试所工程名称郑东新区热电厂一期2×200MW机组工程文件名称凝结水系统调试方案文件类别分系统试运批准年月日审核年月日编制年月日郑东新区热电有限公司一期2×200MW机组工程凝结水系统调试方案-3-河南第一火电建设公司调试所目录1目的···························································································(04)2依据···························································································(04)3设备系统简介···········································································(04)4调试内容及验评标准·······························································(05)5组织分工··················································································(06)6使用仪器设备··········································································(06)7调试应具备的条件··································································(06)8调试步骤··················································································(07)9联锁保护定值··········································································(10)10安全技术及环境保护措施····················································(10)郑东新区热电有限公司一期2×200MW机组工程凝结水系统调试方案-4-河南第一火电建设公司调试所1目的为了更好地实施凝结水泵及其系统的现场试运,通过对该设备及相关系统的调试,保证主机凝结水系统参数正常,系统保护、联锁、信号正确,达到《验标》所规定的要求,为进入吹管阶段做准备,为整套启动顺利进行打下基础,特编写该调试方案。2依据2.1《火力发电厂基本建设工程启动及竣工验收规程》(1996年版)。2.2《火电工程启动调试工作规定》。2.3《火电工程调试质量检验及评定标准》(1996年版)。2.4《电力建设施工及验收技术规范》(汽机篇)。2.5《火电机组达标投产考核标准》(2001年版)。2.6《电力建设安全健康与环境管理工作规定》(2002年版)。2.7《工程建设强制性条文》(电力工程)。2.8国家及行业有关技术规范、标准。2.9设计、制造技术文件、资料。2.10相关的合同文件、纪要。2.11河南第一火电建设公司《质量、职业健康安全、环境管理手册》。3设备系统简介LDTN型凝结水泵是立式筒袋型双层壳体结构,有以下几部分组成:泵筒体、工作部、出水部分和推力装置部分。泵轴设有多处径向支承,泵转子轴向负荷合可有泵本身推力轴承承受,也可由电机承受;轴封可以为填料密封或机械密封,泵转子轴系含两根轴,轴间联接为卡环筒式联轴器,泵机联接为弹性柱销联轴器;吸入与吐出接口分别位于泵筒体和吐出座上,并程1800水平布置。3.1系统说明凝结水系统的基本流程:凝汽器→凝结水泵→轴封加热器→#7低加→#6低加→#5低加→#4低加→除氧器凝结水系统的功能主要是回收工质以减少补水量,并向给水系统提供品质合格的凝结水,将凝汽器内的蒸汽凝结水输送至除氧器,同时还向下列设备和系统提供减温郑东新区热电有限公司一期2×200MW机组工程凝结水系统调试方案-5-河南第一火电建设公司调试所水、密封水、控制水:1)A,B本体疏扩减温水2)A,B,C凝结水泵密封水3)汽封减温器减温水4)真空泵补水5)低旁减温水6)A,B三级旁路减温水7)真空破坏阀8)低压缸高温喷水减温3.2设备规范凝结水泵参数:转速流量扬程效率轴功率型号r/mint/hm%kw9LDTNB-5PJ148O30016578173生产厂家沈阳水泵股份有限公司电机参数:转速电压功率额定频率电流型号r/minVkwHzAYLKK355-4148460002005024生产厂家沈阳电机股份有限公司4调试内容及验评标准4.1调试内容4.1.1凝结水系统的热工信号及联锁、保护校验。4.1.2补给水装置的调整。4.1.3凝结水系统水管的冲洗。4.1.4凝结水泵及系统的投运及动态调整。4.2验评标准4.2.1轴承振动不大于80μm。4.2.2支持轴承及推力轴承金属温度不大于80℃。电机线圈温度不大于130℃。郑东新区热电有限公司一期2×200MW机组工程凝结水系统调试方案-6-河南第一火电建设公司调试所4.2.3电机电流不超过额定电流。4.2.4凝结水泵出口压力正常,出力能达到额定值。5组织分工5.1调试单位负责方案的编写、实施及指导,并做好记录。5.2安装单位负责临时管道的安装及设备维护、系统检查,消除缺陷。5.3生产单位负责设备操作并进行系统检查。6使用仪器设备设备名称型号数量用途备注1便携测振仪VM-63A1振动测量2红外线测温仪Raymx2c1温度测量7调试应具备的条件7.1凝结水系统的所有设备(包括加热器、水泵、管道、支吊架等)均已安装完毕,并经安装单位和监理单位验收签证。7.2系统内的阀门动作试验结束,活动灵活,无卡涩,各限位开关位置正确,指示无误。7.3有关热工、电气回路的调试工作已结束;电机润滑油符合要求。7.4凝结水补水及凝汽器冲洗工作已结束,凝结水补水自动装置投入,凝汽器上水至高水位,保证有充足的补水。7.5凝结水泵进口管道冲洗工作已结束。7.6所有仪表安装齐全,并检验合格,就地仪表校验合格可投入,打开仪表一次门。7.7凝结水泵进口滤网已安装好,并清洗干净。7.8人身、设备的安全措施、消防措施已落实。7.9设备周围的垃圾杂物清理干净,梯子、栏杆齐全。7.10试运区照明充足,通讯手段可靠。7.11热工、电气联锁、保护试验合格,事故按钮调试均正常。7.12电机转向正确,单转8小时,电流、振动、温升等各项指标合格;连接对轮后轴系中心符合要求。郑东新区热电有限公司一期2×200MW机组工程凝结水系统调试方案-7-河南第一火电建设公司调试所7.13循环水、工业水系统调试结束,可投入运行,除盐水能送来合格的除盐水。7.14夏季试运应有必要的防暑降温措施,冬季试运应有必要的防冻措施。8调试步骤8.1热工信号及联锁保护检查试验热工信号及联锁保护传动试验合格后,协调热工专业人员、生产准备人员和调试监理对该试验记录进行联合检查试验,并做好检查记录。8.1.1检查试验前准备工作。8.1.1.1检查所有凝结水系统管道上的阀门均在关闭位置。8.1.1.2凝结水泵电机在试验位置。8.1.2联锁保护试验。8.1.2.1凝结水泵:三台凝结水泵互为备用,正常情况下运行两台泵,另一台备用。当运行泵事故跳闸或凝结水泵出口母管压力低,联动启备用泵。8.1.2.2凝结水泵启动允许条件。1)凝结水泵出口门已关或凝结水泵处于备用状态。2)凝结水泵不存在电机电气故障。3)凝汽器水位正常8.1.2.3凝结水泵保护跳闸条件:1)凝汽器水位降至低Ⅱ值时。2)凝结水泵运行80秒后,其出口门仍未打开。3)凝结水泵电机线圈温度高8.1.2.4凝结水泵出口门联锁1)可单操/顺控打开或关闭。2)泵启动后或投备用,联开其出口门。3)泵停,关闭其出口门。8.2凝结水泵试运行8.2.1启动前的检查8.2.1.1手盘转子应灵活。8.2.1.2打开凝结水泵入口门,水泵充水,开启泵体至凝汽器放空气门,投入密封水、郑东新区热电有限公司一期2×200MW机组工程凝结水系统调试方案-8-河南第一火电建设公司调试所冷却水系统。8.2.1.3检查电器仪表回路正常,电机绝缘合格。8.2.1.4检查凝汽器热井水位是否满足泵的灌注高度要求。8.2.1.5泵进出口管道及密封水管道压力仪表齐全。8.2.1.6凝结水泵启动前,必须经过施工班组,调试监理和调试人员共同检查应具备启动条件。8.2.2凝结水泵启动8.2.2.1开启凝结水再循环旁路门,使凝泵处于再循环状态运行。8.2.2.2启动凝结水泵,出口门应联开,纪录出口压力和启动电流及达到定速后的电流。在出口门关闭的情况下,运转时间不能超过2min。8.2.2.3根据电机电流,调整再循环调节门开度。8.2.2.4凝结水泵正常后,凝结水泵的密封水切为自密封。8.2.2.5监视凝汽器水位,水位下降,及时向凝汽器补水,运行中注意检查电机的振动、轴承温度、线圈温度、电流和出口压力。8.2.2.6凝结水泵正常运行8小时,试运结束。8.2.2.7凝结水泵运行过程中,注意检查泵,管道和法兰处有无泄露现象,及时汇报。8.2.2.8新泵首次启动,若有下列情况之一时,必须停泵检查:1)电流表摆动较大或电流超过额定值。2)水泵有明显振动。3)电机轴承处温度高于75℃。8.2.3停泵8.2.2.1切断电机电源。8.2.2.2关闭出口阀。8.2.2.3确认泵转子停转后,关闭冷却水管路和密封水管路。8.2.2.4停运期间如果进口处于负压状态,应保证密封水的注入。8.3凝结水系统的试运行凝结水系统试运行的目的是对整个凝结水系统进行冲洗和通水检查,并初步了解凝结水泵的性能及检查其工作状态。8.3.1系统冲洗凝结水系统在进行通水检查及投入机组整套启动前应进行水冲洗,在冲洗前,先郑东新区热电有限公司一期2×200MW机组工程凝结水系统调试方案-9-河南第一火电建设公司调试所对凝汽器汽侧进行一次全面清扫。然后对凝汽器补水、放水管路进行冲洗,冲洗合格后,再次补水。系统冲洗时,冲洗水不进入轴加、低加及除氧头。凝结水系统冲洗路线:凝汽器热井→凝结水泵→轴加旁路→#7~#4低加旁路→除氧水箱→除氧器酸洗放水管→排地沟8.3.1.1开启凝结水系统冲系所需阀门,除氧器水位调节阀关闭,通过除氧器水位调节阀的旁路门电动阀来控制。8.3.1.2按凝结水泵正常操作步骤进行凝泵的启停工作。在冲洗时,注意以下事项:1)以维持除氧器水箱水位的情况下,尽量开打除氧器水位调节旁路阀,若除氧器水位过高则可通过除氧器溢流放水和事故放水阀来调节水位;2)检查管道应无振动,泄漏等情况,水冲洗直至合格;3)当主凝结水管冲洗合格后,冲洗凝结水至下列设备的各支管(支管冲洗时应尽量在最靠近使用凝结水的设备的隔离门后法兰处解开冲洗):4)A,B本体疏扩减温水5)A,B,C凝结水泵密封水6)汽封减温器减温水7)真空泵补水8)低旁减温水9)A,B三级旁路减温水10)真空破坏阀,水封阀11)低压缸高温喷水减温12)冲洗完毕后,清扫除氧器水箱、凝汽器及凝泵入口滤网及临时滤网。8.3.2加热器的通水检查通水检查是在水冲洗结束后进行,其目的是对轴加和低加水侧通水,检查是否泄漏并冲洗。通水检查路线和水冲洗基本一致,只是轴加、低加不走旁路而走加热器内部。启动凝结水泵,要特别注意各热交换器的汽侧水位如有升高,应停泵检查并予以
本文标题:凝结水系统调试方案
链接地址:https://www.777doc.com/doc-4371990 .html