您好,欢迎访问三七文档
当前位置:首页 > 建筑/环境 > 工程监理 > 合福铁路仙和轨道板厂临时用电施工方案
中铁隧道集团有限公司合福铁路仙和轨道板厂八标合福铁路仙和轨道板厂临时用电方案编制:审核:批准:中铁隧道集团有限公司合福铁路仙和轨道板厂八标项目经理部二0一0年九月目录1.编制目的················································32.编制依据················································33.参考文件················································34.本工程施工临时用电概况··································35.设计内容和步骤···································35.1现场勘探和初步设计·····································35.2确定用电负荷········································45.3变压器选择··········································66.施工用电安全管理措施····································66.1接地接零保护系统及防雷······························66.2安全用电防火措施····································86.3配电箱、开关箱管理····································96.4现场和洞内照明·········································96.5电气设备的安装·····································106.6电气设备的防护·····································106.7电气设备的操作和维修人员的要求························116.8外电线路防护和电缆铺设································116.9电气设备使用和维护·································126.10变配电装置·········································16.11用档案···········································126.12冬雨季电气安全管理·································137.施工用电安全管理度····································137.1用电管理操作规程····································137.2用电安全人员管理····································15附表1:电工录表··········································16附表2:配电设备录表······································17§§11目目的的1、规范本工程施工临时安全用电2、为本工程施工用电提供必要的作业指导§§22编编制制依依据据《施工现场临时用电安全技术规范》(JGJ46-2005)《施工安全检查标准》(JGJ59-99)§§33参参考考文文件件1、《电线电缆及其附件实用手册》2、郑州市政府和轨道交通公司安全用电相关规定§§44本本工工程程施施工工临临时时用用电电概概况况郑州轨道交通地下市政工程03标合同段盾构区间工程供电采用高压10kv环网系统供电,并由电力部门提供高压10kv供电回路。按施工流程,施工用电根据工作时间分为两个部分:博学路站的施工用电和盾构机施工用电。博学路站施工期间由一台10kv/380v、容量630KVA的变压器提供施工用电及生活区用电。盾构机施工用电为盾构机用电和常规设备。一台盾构机用电压为10kv容量为1600KVA相变供电;常规设备用一台10KV/380V,630KVA的变压器供电。总供电容量为2230KVA。§§55设设计计内内容容和和步步骤骤5.1现场勘探和初步设计(1)本工程所在施工现场范围内无各种埋地管线。(2)盾构机采用10KV高压供电,现场采用10KV高压开关柜供电。(3)其它常规设备现场采用380V低压供电,设3总配电箱,内有计量设备、电压、电流表,采用TN-S系统供电。(4)备用一台发电机,以备停电,提供隧道照明和通风。(5)根据施工现场用电设备布置情况,采用导线穿钢管埋地敷设,布置位置及线路走向参见临时配电系统图及现场平面图,采用三级配电,两级保护。(6)按照《JGJ46-2005》规定制定施工组织设计。5.2确定用电负荷(1)设备用电量统计表序号类别设备名称规格型号功率(容量)数量(台)功率(容量)合计1轨道板厂滚筒搅拌机JZC30012KW112KW2电焊机BX1-500A42KW4168KW3切割机J3GD-4003KW13KW4水泵新界3KW3KW618KW5台钻上海凡和3.5KW13.5KW6钢筋切断机GQ402.2KW48.8KW7潜水泵WQ37-10-3QG5.5KW40220KW8插入式振动棒1M2KW12KW(2)负荷计算P1=Pe×KdP1有功功率(KW);Kd需要系数。车站相关设备取0.65Pe为额定功率Q1=P1×tgQ1为无功计算负荷(KVAR)P1有功功率(KW)tg为设备功率因数正切值,功率因数取0.85S1=P12+Q12S1为视在功率(KVA)I1=S1/3UN(A)I1为计算电流本设计中计算负荷利用需要系数法确定,由表格形式体现出来。电气设备功率计算分项表格序号分类名称数量KdcostgPeP1Q1SI1轨道板厂滚筒搅拌机10.650.850.62127.84.82电焊机40.650.850.62168109.267.73切割机10.650.850.62321.24水泵60.650.850.621811.77.35台钻10.650.850.623.52.31.46钢筋切断机40.650.850.628.85.723.57潜水泵400.650.850.6222014388.78插入式振动棒10.650.850.6221.30.89照明1101303003)总的负荷计算总的有功功率P1总=7.8+109.2+2+11.7+2.3+5.72+143+1.3+30=313.2KW总的无功功率Q1总=4.8+67.7+1.2+7.3+1.4+3.5+88.7+0.8=253.7KVAR总的视在功率S1总=P12+Q12=(313.2+253.7)1/2=283.45KVA总的计算电流计算I1总=S1/3UN(A)=283.45/(1.732×0.38)=430.67A经电压损耗和机械强度校验由变压器至3个总配箱干线3根3×120+2×90埋地敷设,总开关选择400A空气开关和400A漏保。5.3变压器选择Sjs总=1.05×443=465.15KVA根据计算常规设备总的视在功率选择1台630KVA电力变压器,总容量为630KVA465.15.KVA能够满足使用要求,其高压侧电压为10kV同施工现场外的高压架空线路的电压级别一致。§§66施施工工用用电电安安全全管管理理措措施施6.1接地接零保护系统及防雷6.1.1在施工现场专用的中性点直接接地的电力系统中必须采用TN-S接零保护系统。供电系统采用TN-S接零保护系统,电气设备的金属外壳必须与保护零线连接。保护零线应由工作接地线、配电室(总配电箱)电源侧零线或总漏电保护器电源侧零线处引出(如下图所示)。专用变压器供电时TN-S接零保护系统示意1—工作接地;2—PE线重复接地;3—电器设备金属外壳(正常不带电的外露可导电部分);L1、L2、L3—相线;N—工作零线;PE—保护零线;DK—总电源隔离开关;RCD—总漏电保护器(兼有短路、过载、漏电保护功能的漏电断路器);T—变压器TN-S供电系统:它是把工作零线N和专用保护线PE在供电电源处严格分开的供电系统,也称三相五线制。它的优点是专用保护线上无电流,此线专门承接故障电流,确保其保护装置动作。应该特别指出,PE线不许断线。在供电末端应将PE线做重复接地。6.1.2施工现场每一处重复接地的接地电阻值应不大于10Ω,且不得少于3处(即总配电箱、线路的中间和末端处),重复接地线应与保护零线相连。接地电阻每季度公司至少复测一次,现场每月检测一次。6.1.3接地装置的接地线应采用二根以上导体,在不同点与接地体作电气连接。垂直接地体装置采用自然接地体建筑物和地圈梁中钢筋。6.1.4保护零线应由工作接地线、配电室的零线或第一级漏电保护器电源侧的零线引出。保护零线应单独敷设,不得装设任何开关与熔断器。保护零线应接至每一台用电设备的金属外壳(包括配电箱)。6.1.5保护零线的截面应不小于工作零线的截面,并使用统一标志的绿/黄双色线,任何情况下不得将绿/黄双色线作负荷线。与电气设备相连的保护零线应为截面不小于2.5mm2的绝缘多股铜线。6.1.6保护零线与电气设备连接应采用铜鼻子等可靠连接,不得采用铰接,电气设备接线柱应镀锌或涂防腐油脂;工作零线和保护零线在配电箱内应通过端子板连接,其中保护零线在其他地方不得有接头。6.1.7同一施工现场的电气设备不得一部分作保护接零、一部分作保护接地。6.1.8当施工地区雷暴日大于≥40日时(天津地区的雷暴日数为28.2d/a),45T门吊(高16米)需要安装避雷针,利用各自的金属结构体作为接地装置连接,作为避雷装置;箱式高压配电站和变压器的输入端安装避雷器,避雷器接地端与箱式高压配电站和箱式变电站的接地装置连接,作为箱式高压配电站及箱式变电站的避雷装置。6.1.9隧道内轨线接地:用φ12的钢筋将轨道互相焊接后,再用BV16mm2黄/绿双色线从井口接到地面,与地面接地装置可靠连接。6.1.10隧道内循环水管、排污管用BV16mm2黄/绿双色线从井口接到地面,与地面接地装置可靠连接。6.1.11所有配电箱/开关箱内均设置接地排,接地排与电源电缆的接地芯连接。6.1.12所有用电设备的金属外壳均用电缆的接地芯线与其对应配电箱/开关箱的内接地排可靠连接。6.1.13施工现场内所有防雷装置的冲击接地电阻值不得大于300Ω6.1.14做防雷接地机械上的电气设备,所连接的PE线必须同时做重复接地,同一台机械电气设备的重复接地和机械的防雷接地可共用同一接地体,但接地电阻应符合重复接地电阻值的要求。6.2安全用电防火措施:6.2.1要求用电人员和现场管理人员认真执行操作规程,加强检查,预防电气火灾。6.2.2施工组织设计时要根据电气设备的用电量正确选择导线截面,从理论上杜绝线路过负荷使用,保护装置要认真选择,当线路上出现长期过负荷时,能在规定时间内动作保护线路。6.2.3导线架空敷设时其安全间距必须满足规范要求,当配电线路采用熔断器作短路保护时,熔体额定电流一定要小于电缆或穿管绝缘导线允许载流量的2.5倍,或明敷绝缘导线允许载流量的1.5倍。经常教育用电人员正确执行安全操作规程,避免作业不当造成火灾。6.2.4电气操作人员要认真执行规范,正确连接导线,接线柱要压牢、压实。各种开关触头要压接牢固。铜铝连接时要有过渡端子,多股导线要用端子或涮锡后再与设备安装,以防加大电阻引起火灾。6.2.5配电室的耐火等级要大于三级,室内配置砂箱和绝缘灭火器。严格执行变压器的运行检修制度,按季度每年进行四次停电清扫和检查。现场中的电动机严禁超载使用,电机周围无易燃物,发现问题及时解决,保证设备正常运转。6.2.6施工现场内严禁使用电炉子。使用碘钨灯时,灯与易燃物间距要大于30cm,室内不准使用功率超过100W的灯泡,严禁使用床头灯。6.2.7使用焊机时要执行用火证制度,并有人监护
本文标题:合福铁路仙和轨道板厂临时用电施工方案
链接地址:https://www.777doc.com/doc-4969522 .html