您好,欢迎访问三七文档
当前位置:首页 > 商业/管理/HR > 咨询培训 > 沈阳城建档案馆交档资料
一次,他在核实数据时,认为部分数据需要重新测量,但项目部的车都被派出去了。belimitedtonomorethan2daysofwork,materialdepositedinspecialinsulatedcontainers,materialhandlingtogentlyandmakeuseofthermalinsulationmaterialinwindproof,waterproof,moisture-proofmeasure.6.2thermaldesignoptimizationforhigh-temperaturespecialthermalinsulationforpipingsupportandhangerdesign,reducedheatdissipationofthehangers,ensurethatthewalldoesnotoverheat.Small-diameterpiping,thermalinstrumentlayoutandpositioningofsupportandhangerdesigntakefullyintoaccounttheexpansionspaceandinsulationthickness.Large-diameterpipesafterheatpreservationplasteringconstructionofvalves,turbine,checkingsmoothsurface,hightemperaturepowderpaintfullydryafter.Protectivecoveringsforelectricequipmentinsulationboardsdesignedwithpressureplate,whenorderingaccordingtotheinstallationdiagram,modelspecificationspublishingorder,ensurewheninstallingcornersneat,uniformappearance,reducetheamountofon-sitemachining.Beforevalves,flangeinsulationshellconstruction,besuretomakeaunifiedmodel,allvalves,flanges,insulationcoverunified,tidyandbeautiful.Whenfourpartssuchaspipes,boilerinsulation,mustdofirstarticleinspection,proofofdesignandconstructionmethods,technologycanmeetthetechnologicalrequirements,beforeextensiveconstruction.Boilersteelbeams,dooropeningboxesdesignedwithinsulationgaskets,flangecannotbeoblique,evenfastened.Backintotheslopeofthetubingduringinstallationpayattentiontothepiping,oilstationisalowpoint.Refuelingmustbecontrolledwhencastingmaterialparts,selectlowthermalconductivitymaterialsasfaraspossible,ensurethatthesepartsdonotoverheat.6.3qualitydefectsofinsulationtechnologymanagementoptimizationofconstructionprocessanddevelopareasonableduration,regionaltransferofstrictly建筑工程竣工档案归档材料内容一、建设单位(甲方)归档内容1、工程形象照片2、基本建设计划3、工程项目申请报告及批复(批复在前,请示在后);4、房地产开发(建设)项目备案书5、项目可行性研究报告及批复;6、建设项目选址意见书7、建设用地批复;8、拆除旧房屋任务审批表9、《房屋拆迁许可证》通知单10、建设项目环境保护“三同时”送审表;11、结合民用建筑修建防空地下室审批表;12、人防工程建设承担书;13、消防设计审核意见书;14、建设项目设计卫生审查认可书;15、建筑扩初设计审定通知单;16、《建设工程规划许可证》通知书;17、规划审批图(1/500红线图);18、工程质量监督申报登记书;19、合同(勘察、设计、动迁、监理、施工、安装)、协议、公证书;20、中标通知书21、工程地质勘察报告;22、工程预算;23、工程验收材料(规划、消防、环保、卫生防疫、住宅小区)24、有关工程重要会议材料(纪要、简报、开竣工典礼、领导讲话、题字);25、工程建设过程中形成的录音、录像、照片。26、新建楼房门牌编号审批表注:建设单位在工程竣工结算三个月内将结算材料报送城建档案馆后,领取工程档案合格证一次,他在核实数据时,认为部分数据需要重新测量,但项目部的车都被派出去了。belimitedtonomorethan2daysofwork,materialdepositedinspecialinsulatedcontainers,materialhandlingtogentlyandmakeuseofthermalinsulationmaterialinwindproof,waterproof,moisture-proofmeasure.6.2thermaldesignoptimizationforhigh-temperaturespecialthermalinsulationforpipingsupportandhangerdesign,reducedheatdissipationofthehangers,ensurethatthewalldoesnotoverheat.Small-diameterpiping,thermalinstrumentlayoutandpositioningofsupportandhangerdesigntakefullyintoaccounttheexpansionspaceandinsulationthickness.Large-diameterpipesafterheatpreservationplasteringconstructionofvalves,turbine,checkingsmoothsurface,hightemperaturepowderpaintfullydryafter.Protectivecoveringsforelectricequipmentinsulationboardsdesignedwithpressureplate,whenorderingaccordingtotheinstallationdiagram,modelspecificationspublishingorder,ensurewheninstallingcornersneat,uniformappearance,reducetheamountofon-sitemachining.Beforevalves,flangeinsulationshellconstruction,besuretomakeaunifiedmodel,allvalves,flanges,insulationcoverunified,tidyandbeautiful.Whenfourpartssuchaspipes,boilerinsulation,mustdofirstarticleinspection,proofofdesignandconstructionmethods,technologycanmeetthetechnologicalrequirements,beforeextensiveconstruction.Boilersteelbeams,dooropeningboxesdesignedwithinsulationgaskets,flangecannotbeoblique,evenfastened.Backintotheslopeofthetubingduringinstallationpayattentiontothepiping,oilstationisalowpoint.Refuelingmustbecontrolledwhencastingmaterialparts,selectlowthermalconductivitymaterialsasfaraspossible,ensurethatthesepartsdonotoverheat.6.3qualitydefectsofinsulationtechnologymanagementoptimizationofconstructionprocessanddevelopareasonableduration,regionaltransferofstrictly二、施工单位(乙方)归档内容1、施工许可证副本2、单位(子单位)工程质量竣工验收记录3、单位交工验收证明4、图纸会审记录5、设计交底记录6、设计变更通知单汇总目录7、设计变更通知单8、工程洽商记录(技术核定联系单)9、工程定位(竣工)测量记录10、地基承载力复查记录11、沉降观测记录12、桩基础竣工报告及检测报告13、结构吊装工程检查验收记录14、隐蔽工程检查验收记录汇总记录15、(土建)隐蔽工程检查验收记录16、屋面、楼面蓄淋水检验记录17、地基与基础工程验收报告18、主体工程验收报告19、主体结构抽样检测报告20、管道隐蔽工程检查验收记录21、建筑电气(电梯)安装隐蔽工程记录22、管道系统\隐蔽压力(满水)试验记录23、设备、卫生器具压力(满水)试验记录24、管道冲洗、吹扫、清洗记录25、给排水管道、卫生器具通水试验记录26、地漏及地面清扫排水试验记录27、排水管道通球试验记录28、采暖系统试运行、调试记录一次,他在核实数据时,认为部分数据需要重新测量,但项目部的车都被派出去了。belimitedtonomorethan2daysofwork,materialdepositedinspecialinsulatedcontainers,materialhandlingtogentlyandmakeuseofthermalinsulationmaterialinwindproof,waterproof,moisture-proofmeasure.6.2thermaldesignoptimizationforhigh-temperaturespecialthermalinsulationforpipingsupportandhangerdesign,reducedheatdissipationofthehangers,ensurethatthewalldoesnotoverheat.Small-diameterpiping,thermalinstrumentlayoutandpositioningofsupportandhangerdesigntakefullyintoaccounttheexpansionspaceandinsulationthickness.Large-diameterpipesafterheatpreservationplasteringconstructionofvalves,turbine,checkingsmoothsurface,hightemperaturepowderpaintfullydryafter.Protectivecoveringsfo
本文标题:沈阳城建档案馆交档资料
链接地址:https://www.777doc.com/doc-5045011 .html