领南·尚品13#、21#、22#楼【外脚手架工程专项施工方案】-0-悬挑式外脚手架工程专项施工方案目录1、工程概况·······························································································12、编制依据·······························································································13、脚手架选型····························································································14、施工准备·······························································································45、普通型钢悬挑式脚手架搭设要求································································65.1搭设作业程序·····················································································65.2搭设要点···························································································66、脚手架搭设质量验收要求·······································································116.1脚手架的验收标准规定·······································································116.2脚手架的验收和日常检查····································································117、脚手架的使用与维护··············································································128、脚手架工程安全技术要求·······································································139、脚手架的拆除·······················································································1410、施工安全应急救援预案·········································································15附录一:18M高工字钢悬挑脚手架计算书························································17领南·尚品13#、21#、22#楼【外脚手架工程专项施工方案】-1-1、工程概况1.1参建单位建设单位:四川南充新金丰实业有限公司叙永分公司设计单位:四川省佳业建筑设计有限公司勘察单位:信息产业部电子综合勘察研究院监理单位:四川泰兴建设管理有限责任公司总承包单位:四川南充市第四建筑工程有限公司1.2设计概况领南·尚品住宅小区工程项目位于四川省泸州市叙永县新区和平大道东侧,北抵永宁路,南靠国道G321。13#、21#、22#楼按6度抗震烈度设防,主体为砖混结构,35°钢筋混凝土斜屋面。建筑物耐火等级为二级,合理使用年限50年,层高均3m,室内外高差1.0m。建筑区基本风压0.3kN/m2,地面粗糙度为B类。13#檐口标高19m;21#和22#楼檐口标高22m。1.3现场条件二期地下室基坑开挖后于13#、21#、22#楼主体施工,其地下室基坑开挖边线距离13#、21#、22#楼东面山墙仅2.5m,且该地段土层为新近杂填土,土体空隙率大,当地年降水量达1000mm以上,边坡极不稳定,随时有坍塌危险。2、编制依据1.领南·尚品12#~22#楼施工图及施工图审查意见书;2.领南·尚品二期土建工程施工组织设计;4.领南·尚品12#、13#、15#~22#楼落地式脚手架专项施工方案;5.《建筑施工扣件式钢管脚手架安全技术规范》(JGJ130-2011);6.《建筑施工安全检查标准》(JGJ59-2011);7.《建筑施工高处作业安全技术规范》(JGJ80-1991);8.《建筑施工手册》(第五版)。3、脚手架选型因二期地下室基坑暴露时间长,对13#、21#、22#三栋楼落地式外脚手架的安全隐患很大。为消除安全隐患,13#楼东面山墙自四层板面(8.95m标高)、21#楼东面山墙自三层板面(5.95m标高)、22#楼东北面外墙自二层板面(2.95m标高)搭设型钢悬挑扣件式钢管脚手架至坡屋顶,搭设高度分别为11.5m、18.5m、17.5m。下部已搭设架体领南·尚品13#、21#、22#楼【外脚手架工程专项施工方案】-2-采用斜撑加固,斜撑间距同立杆纵距。悬挑水平钢梁采用16号工字钢,其中建筑物外悬挑段长度1.3m,建筑物内锚固段长度1.7m。在距悬挑水平钢梁端部300mm处采用6×19φ14钢丝绳与建筑物拉结。架体为双排单立杆,内侧立杆距外墙0.3m。架体立杆纵距1.4~1.6m,立杆横距0.8m,大横杆步距≤1.8m,小横杆间距≤0.8m,小横杆在上,大横杆在下。横杆与立杆连接方式为单扣件;连墙件采用两步三跨,竖向间距3.6m,水平间距4.2~4.8m,采用双扣件连接;小横杆上铺设竹串片脚手板,用9mm厚木胶合板做栏杆挡脚板。悬挑脚手架平面布置详见下图:领南·尚品13#、21#、22#楼【外脚手架工程专项施工方案】-3-领南·尚品13#、21#、22#楼【外脚手架工程专项施工方案】-4-4、施工准备4.1技术准备3.1.1熟悉图纸,了解掌握钢管扣件式脚手架施工工艺,按图纸和项目部的施工方案、施工计划合理安排材料、机具、人员施工。3.1.2按施工方案和技术规程对操作者进行技术安全交底,并下达具有可操作性、可实施的技术交底书。3.1.3认真做好材料进场验收检验工作,复查材料材质证明及材料进场存储工作。3.1.4认真研究建筑物外立面形状,按方案要求进行脚手架形式选择。4.2劳动力配置主要人员配置表序号工种人员数量备注1施工员1名持上岗证2安全员1名持上岗证3班组长1名4架子工8名持特种作业操作证4杂工2名4.3材料准备3.3.1悬挑脚手架工程主要材料需用量见下表:主要材料配置一览表材料名称规格数量备注工字钢16#3m/根26根悬挑架挑梁工字钢16#3.5m/根12根悬挑架挑梁工字钢16#4.5m/根5根悬挑架挑梁工字钢16#5.5m/根2跟悬挑架挑梁钢丝绳6×19φ14mm66根·8m4.3.2材质要求1.钢管钢管采用现行国家标准《直缝电焊钢管》(GB/T13793)或《低压流体输送用焊接钢管》(GB/T3091)中规定的Q235普通钢管,钢管的钢材质量应符合现行国家标准《碳素结构钢》(GB/T700)中Q235级钢的规定。每根钢管的最大质量不超过25kg,最大长度6m。钢管表面应平直光滑,无裂缝、结疤、分层、错位、硬弯、毛刺、压痕和深的划道;钢管外径与壁厚允许偏差为-0.5mm,钢管锈蚀度及弯曲变形应符合《建筑施工扣件式钢管脚手架安全技术规范》(JGJ130-2011)的规定。领南·尚品13#、21#、22#楼【外脚手架工程专项施工方案】-5-新钢管进场应有产品质量合格证、材质检验报告,并应涂刷防锈漆。2.扣件应采用可锻铸铁或铸钢制作的扣件,其材质应符合现行国家标准《钢管脚手架扣件》(GB15831)的规定;扣件在螺栓拧紧扭力矩达65N·m时,不得发生破坏。扣件使用前必须全数检查,表面不得有裂纹、气孔、疏松、砂眼或其他影响使用性能的锻造缺陷,并应将影响外观质量的粘砂、浇冒口残余、披缝、毛刺、氧化皮等清除干净。扣件与钢管的贴合面必须严格整形,应保证与钢管扣紧时接触良好。扣件活动部位应能灵活转动,旋转扣件的两旋转面间隙应小于1mm。当扣件夹紧钢管时,开口处的最小距离应不小于5mm。3.脚手板木脚手板材质应符合现行国家标准《木结构设计规范》(GB50005)中级材质的规定,脚手板厚度不应小于50mm,两端各设置不小于φ4的镀锌钢丝箍两道。木脚手板重量不宜大于30kg,外观不得有开裂、腐朽缺陷。4.悬挑架用工字钢工字钢材质应符合《碳素结构钢》(GB/T700)或《低合金高强度结构钢》(GB/T1591)的规定。用于固定工字钢挑梁的U形钢筋拉环材质应符合现行国家标准《钢筋混凝土用钢第1部分:热轧光圆钢筋》(GB1499.1)中HPB235级钢筋的规定。4.4机具准备脚手搭设工具主要有梅花板手、力矩板手、铁锤、冲击电锤、钢卷尺等。4.5防护用品3.5.1安全帽必须经有关部门检验合格后方能使用,施工人员必须正确使用安全帽并扣好帽带,不得使用缺衬、缺带及破损的安全帽。3.5.2安全带必须经有关部门检验合格后方能使用,安全带使用两年后,必须按规定抽检一次,抽检不合格的,必须更换后才能使用。安全带使用应高挂低用,不准将绳打结使用,更换新绳时要注意加绳套。3.5.3安全网密目式安全立网,网目密度不低于2000目/100cm2,尺寸一般高为1.8m、长为6m,由网体、开眼环扣、边绳和附加系绳组成。安全平网应采用锦纶、维纶、涤纶或其他的耐候性不低于上述品种的材料制成;平领南·尚品13#、21#、22#楼【外脚手架工程专项施工方案】-6-网宽度不得小于3m;菱形或方形网目的安全网,其网目边长不大于8cm;边绳与网体连接必须牢固,平网边绳断裂强力不得小于7KN;筋绳分布应合理,平网上两根相邻筋绳的距离不小于30cm,筋绳断裂强力不大于3KN;安全网所有节点必须固定;按规定的方法进行试验,安全平网的冲击性能应符合:10m冲击高度下,网绳、边绳、系绳不断裂。5、普通型钢悬挑式脚手架搭设要求5.1搭设作业程序板内预埋φ16钢筋压环两道→安装16#工字钢→放置纵向扫地杆→自角部起依次向两边竖立底立杆(第1根)→底端与纵向扫地杆扣接固定后,装设横向扫地杆,并与立杆固定(固定立杆底端前,应掉线确保立杆垂直),每边竖起3~4根立杆后,随即装设第一步纵向水平杆(与立杆扣接固定)和横向水平杆(小横杆靠近立杆并与纵向水平杆扣接固定)、校正立杆垂直和水平杆水平使其符合要求后,按40~60N·m力矩拧紧扣件螺栓,形成排架的起始段→按上述要求依次向前延伸搭设,直至第一步架交圈完成。交圈后,再全面检查一遍构架质量和地基情况,严格确保架体质量→设置连墙件(与框架柱拉结)→安装卸荷钢丝绳→安装架体底部安全平网→按第一步架的作业程序和要求搭设第二步、第三步……→随着搭设过程及时装设连墙件和剪力撑→装设作业层间横杆(在构架横向平杆之间加设的、用于缩小铺板支承跨度的横杆),铺设脚手板和装设作业层栏杆、挡脚板或围护、封闭措施。5.2搭设要点5.2.1落地脚手架加固施工为避免边坡坍塌对落地式脚手架的不利影响,在架体一层增设钢管斜撑,斜撑间距同立杆间距。13#楼落地架已有10m高,在第二层另用6×19直径14钢丝绳斜拉卸荷,钢丝绳间距为立杆间距的两倍。架体加固大样如下图:领南·尚品13#、21#、22#楼【外脚手架工程专项施工方案】-7-5.2.2工字钢挑梁安装1.悬挑水平钢梁采用16号工字钢,其中建筑物外悬挑段长度1.3m,建筑物内固定段长度1.7m。钢梁在转角处、卫生间处适当加长,长度详见平面布置图
本文标题:型钢悬挑外脚手架工程专项施工方案
链接地址:https://www.777doc.com/doc-5080127 .html