中国石油天然气股份有限公司炼油与化工分公司二○○八年七月编辑:李开文赵泽军审核:锁海滨祁晓丽审定:王德义沈殿成中国石油天然气股份有限公司炼油与化工分公司二○○八年七月北京·1·1.炼油化工建设项目交工技术文件规定·····························································································872.附录A炼油化工建设项目交工技术文件用表格式清单·····························································98施工综合管理用表格式(SY01)································································································112设备材料验收用表格式(SY02)································································································138施工及质量检验通用记录表格格式(SY03-A)········································································146动设备安装工程施工及质量检验记录用表格式(SY03-B)·····················································174静设备安装工程施工及质量检验记录用表格式(SY03-C)·····················································191储罐/气柜制作安装工程施工及质量检验记录用表格式(SY03-D)········································225球罐制作安装工程施工及质量检验记录用表格式(SY03-E)··················································230管道安装工程施工及质量检验记录用表格式(SY03-F)··························································233电气安装工程施工及质量检验记录用表格式(SY03-G)·························································252自控仪表安装工程施工及质量检验记录用表格式(SY03-H)·················································283通信安装工程施工及质量检验记录用表格式(SY03-I)··························································304工业建、构筑物施工交接质量复测确认用表格式(SY03-J)··················································3233.附录B交工技术文件用表填写及使用说明···············································································335总说明············································································································································335施工综合管理用表使用说明(SY01)························································································335设备材料验收用表使用说明(SY02)························································································337施工及质量检验通用记录用表使用说明(SY03-A)·································································338动设备安装工程施工及质量检验记录用表使用说明(SY03-B)·············································340静设备安装工程施工及质量检验记录用表使用说明(SY03-C)·············································341储罐/气柜制作安装工程施工及质量检验记录用表使用说明(SY03-D)································344球罐制作安装工程施工及质量检验记录用表使用说明(SY03-E)··········································344管道安装工程施工及质量检验记录用表使用说明(SY03-F)··················································344·2·电气安装工程施工及质量检验记录用表使用说明(SY03-G)·················································347自控仪表安装工程施工及质量检验记录用表使用说明(SY03-H)·········································350通信安装工程施工及质量检验记录用表使用说明(SY03-I)···················································351工业建、构筑物施工交接质量复测确认用表使用说明(SY03-J)···········································353编后语·························································································································································355·87·1范围本规定依据《中国石油天然气股份有限公司炼油化工项目竣工验收手册》(上册)的相关要求,确定了炼油化工项目建设从工程开工到工程交接,即工程施工阶段设计、采购、施工、监理单位或工程总承包单位移交给建设单位的技术文件的要求。本规定适用于中国石油天然气股份有限公司新建、扩建、改建等炼油化工生产装置及辅助配套工程建设项目的交工技术文件填写、编汇、组卷和交付。2引用文件GB/T11822-2000科学技术档案案卷构成的一般要求GB/T18894-2002电子文件归档与管理规范DA/T28-2002国家重大建设项目文件归档要求与档案整理规范GB50319-2000建设工程监理规范SH/T3903-2004石油化工建设工程项目监理规范GB/T50326-2006建设工程项目管理规范GB/T50358-2005建设项目工程总承包管理规范《中国石油天然气股份有限公司炼油化工建设项目竣工验收手册》(上册)3术语3.1建设项目在一定的条件约束下,以形成固定资产为目标的一次性事业。一个建设项目必须在一个总体设计或初步设计范围内,由一个或若干个相互内在联系的单项工程所组成,经济上实行统一核算,行政上实行统一管理。3.2单项工程指建设项目中具有独立设计文件、可独立组织施工,建成后可以独立发挥生产能力或工程效益的工程。3.3单位工程具有独立设计文件、可独立组织施工,但建成后不能独立发挥生产能力或工程效益的工程。3.4建设性质一般分新建、扩建、改建和技术改造。3.5建设规模建设项目中主要生产装置的设计生产能力。·88·3.6中间交接单项工程或单位工程按设计文件所规定的范围全部完成,并经管道系统和设备的内部处理、电气和仪表调试及单机试车合格后,承包单位和建设单位所作的交接工作,它标志着工程施工安装结束,由单机试车转入联动试车。它是工程保管、使用责任的移交,不解除承包单位对工程质量、验收应负的责任。3.7工程交接建设项目、单项工程或独立单位工程在联动试车完成后、投料试车前,承包单位和建设单位按规定内容所作的交接工作。3.8专项验收包括建设项目的消防、环境保护、安全设施、职业病防护设施、档案及竣工决算审计等六个方面的竣工验收;其中消防、环境保护、安全设施、职业病防护设施竣工验收由政府行政主管部门验收,档案验收和竣工决算审计由股份公司主管部门验收和审计。3.9竣工验收是全面考核建设工作,检查是否符合设计要求和工程质量的重要环节,对促进建设项目(工程)及时投产,发挥投资效果,总结建设经验有重要作用。3.10生产准备为发挥建设项目效益和作用,保证正常生产或使用所做的各项准备工作。主要包括:组织准备、人员准备、技术准备、资金准备、物资准备、外部条件准备、营销准备等七个方面的任务。3.11单机试车现场安装的驱动装置空负荷运转或单台机器、机组以水、空气等为介质进行的负荷试车,以检验其除受介质影响外的机械性能以及制造、安装质量。3.12联动试车对规定范围内的机器、设备、管道、电气、自动控制系统在各处达到试车标准后,以水、空气、部分实物料等介质所进行的模拟运行,以检验其除受介质影响外的全部性能和设计、制造、安装质量。3.13预试车在安装工程完成以后,投料试车前现场进行的各种工作。包括管道系统和设备的内部处理、电气及仪表调试、单机试车和联动试车。3.14投料试车建设项目的生产装置按设计文件规定的介质打通生产流程,并以生产出设计文件规定的产品为目的的生产过程。3.15生产考核投料试车产出合格产品后,对装置生产能力、工艺指标、产品质量、设备性能、自控水平、消耗定额、经济效益等是否达到设计要求的全面考核。引进装置应通过考核,确定各项指标是否达到合同保证值。3.16试生产投料试车后,至正式交付生产前的生产过程。3.17开工报告建设项目或单项(位)工程开工的依据,包括建设项目开工报告和单项(位)工程开工报告。·89·3.18项目文件建设项目在立项、审批、招投标、勘察、设计、施工、监理及竣工验收全过程中形成的文字、图表、声像等形式的全部文件。包括项目前期文件、项目竣工文件和项目竣工验收文件等。3.19项目前期文件工程开工以前在立项、审批、招投标、勘察、设计以及工程准备过程中形成的文件。3.20项目竣工文件项目竣工时形成的反映施工(指建筑、安装)过程和项目真实面貌的文件,主要由项目施工文件、项目竣工图和项目监理文件组成。3.21项目施工文件项目施工过程中形成的反映项目建筑、安装情况的文件。3.22项目竣工图项目竣工后按照工程实际情况所绘制的图纸。3.23项目监理文件监理单位对项目工程质量、进度、安全和建设资金使用等进行控制的文件。3.24项目竣工验收文件项目竣工后试运行中以及项目竣工验收时形成的文件。3.25交工技术文件施工单位或其他承建单位按国家现行的施工标准和规范以及股份公司相关规定,在施工和管理过程中所形成的,在工程交接时移交建设单位的工程交付、安全质量、使用性能等技术资料,是项目竣工文件的重要组成部分。3.26竣工验收报告是建设项目建设全过程的总结报告。3.27竣工决算是正确核定新增固定资产价值,反映竣工项目建设成果的文件,是办理固定资产交付使用手续的依据。3.28质量证明文件原件加盖生产厂红色检验章或质量证明书专用章的产品质量证明文件及供应商在产品质量证明文件上加盖红色印章的延续性的质量证明
本文标题:2 炼油化工建设项目竣工验收手册(下册)
链接地址:https://www.777doc.com/doc-5143974 .html