您好,欢迎访问三七文档
1目录1.编制说明························································································22.编制依据························································································63.影响环境因素的控制措施···································································73.1施工噪声的控制措施·······································································73.2施工扬尘控制措施··········································································83.3生产、生活垃圾控制措施·······························································113.4污水控制措施··············································································143.5节约用水、电、材料控制措施·························································153.6火灾隐患潜在事故控制措施····························································1721.编制说明1.1编制目的为了贯彻执行公司的环境方针,确保满足GB/T24001-2015标准的要求,不断改善环境质量,保证环境管理体系于本工程施工中的有效实施,保持良好的运行,同时加强企业管理规范,标准化要求,增强企业的实力,提高了经济与社会效益。1.2地理位置:朝阳区将台乡,东临东坝路、西侧为相临10#、13#楼、北临将台北岗北路、南临东八间房路,对居民影响较小。1.3工程概况:序号项目内容1工程名称将台乡农民回迁安置房项目11#、12#、14#、15#住宅楼及3#车库东段2建设单位北京星泰建恒房地产开发有限公司3设计单位北京市弘都城市规划建筑设计院4监理单位达华工程管理(集团)有限公司5勘察单位北京市地质工程勘察院6质量监督北京市朝阳区建设工程质量监督站7施工单位北京市朝阳田华建筑集团公司8分包单位四川森茂劳务有限责任公司9质量目标合格10安全目标北京市绿色安全文明工地11开竣工日期2015年12月31日至2018年8月7日31.4建筑设计简介:建筑设计概况项目内容建筑功能住宅楼建筑特点地下为连通车库建筑面积总面积129600㎡主楼97637㎡车库31963㎡建筑层数地上11#、12#28层地下住宅3层14#、15#25层车库2层建筑层高(m)主楼地下部分地下三层3.75m地下二层3.50m地下二层3.55m车库地下部分地下二层3.60m地下二层4.00m地上部分标准层2.8m建筑高度(m)绝对标高(m)31.10m室内外高差(m)-0.30基底标高(m)-12.20m最大基坑深度(m)-15.00m建筑总高(m)11#楼、12#楼95.60m14#楼、15#楼87.20m建筑防火一级墙面保温90mm聚苯板外装修外墙立面涂料,出入口等为外墙砖内装修墙面腻子、涂料地面用户自理4结构设计概况序号项目内容1结构形式基础结构形式筏板基础主体结构形式框架、剪力墙屋盖结构形式全现浇2地基车库天然地基住宅复合地基3地下防水混凝土自防水抗渗等级P8、P6卷材防水4mm+3mm厚SBS型聚酯胎改性沥青卷材4mm厚金属铜胎改性沥青防水卷材+3mm厚自粘型聚乙烯胎改性沥青防水卷材4抗震等级工程设防烈度8度框架剪力墙抗震等级二、三级5砼强度等级楼号层数柱剪力墙及连梁地下室外墙梁、楼板楼梯11#12#14#15#-3-7C45C45C45C30C308-17C40C40/C30C3018-22C35C35/C30C3023-顶层C30C30/C30C30车库地下一层C35C35C35C30C30地下二层C30C30C30C35C306钢筋类别HPB300、HRB335E、HRB400E(热轧钢筋)7钢筋接头直螺纹连接≥16mm的钢筋绑扎搭接<16mm的钢筋基础底板厚度(mm)500、800、90058结构断面尺寸外墙厚度(mm)地上:250、300、450地下:300、400、700内墙厚度(mm)地上:160、200、250、300、700地下:200、250、300、400柱断面尺寸(mm)800*800梁断面尺寸(mm)750*800、400*600、楼板厚度(mm)400、250、200、180、150、1209楼梯结构形式现浇钢筋混凝土板式楼梯62.编制依据2.1田华集团公司《质量环境手册》和《程序文件》2.2适用的法律及其它要求附表:序号法律、法规1中华人民共和国环境保护法2中华人民共和国大气污染防治法3北京市水污染物排放标准4城市区域环境噪声标准5国家《建筑施工场界噪声限值》6市政府关于发布本市第九阶段控制大气污染措施的通告7建设项目环境保护管理条例8化学危险品安全管理条例9关于加强用水器具质量管理的通知10北京市节约用水的若干规定11市政府关于维护施工秩序减少施工噪声扰民的通知12关于加强施工工地噪声管理的通知13关于加强春季施工工地扬尘管理紧急通知1414中华人民共和国固体废物环境防治法15中华人民共和国环境噪声污染防治法16北京市建设工程施工现场环境保护工作基本标准2.3公司环境管理方案,项目部环境管理目标、指标一览表。2.4项目部重要环境因素清单。73.影响环境因素的控制措施3.1施工噪声的控制措施3.1.1目标:实施此管理方案,使各种噪音符合《建筑施工场界噪声限制GB12523—2001》的规定。3.1.2噪声的来源:我工地主要噪声的来源,土方工程挖掘机、装载机;结构工程振捣棒、电锯、电刨、空压机、塔吊、砼地泵、砂轮锯、电焊机、电钻、切断机、调直机等;装修工程的振捣棒、电锯、电刨、升降机、砂轮锯、电焊机、电钻、切断机、调直机等。3.1.3指标:施工阶段昼间(分贝)夜间(分贝)土方施工7555结构施工6853装修施工63533.1.4对施工机械产生的噪声预防和采取措施:3.1.4.1预防(1)对各种使用机械设备事先进行检测,排除其因故障而增大噪音的因素。满足夜间施工55分贝要求可以夜间施工。(2)对一些机械如挖掘机、装载机、塔吊、升降机振捣棒等不易封闭的机械规定白天施工,夜间噪声分贝大于55的,夜间22:00-6:00禁止施工。(3)对一些机械如,电锯、电刨、砼地泵、搅拌机、砂轮锯、电钻等使用采取定点封闭式的操作棚,同时操作棚的搭设材料采用轻质材料(如轻质陶粒空心砌块,彩钢岩棉夹心板等)。(4)对一些机械器具作业时间进行计划分析按排尽量避免或减少夜间作业。8(5)采取新工艺产品的更新替代,振捣棒采用低音式的振动棒,计划分期淘汰更新,减少人为因素产生的噪声,塔吊指挥作业信号联系将哨声改用无线对讲机,夜间人员作业禁止大声喧哗,材料卸运不得出现物料相互撞击,轻拿轻放,任何车辆进场不得鸣笛等要求。(6)对特殊时期(假日,学生高考期间)的施工计划安排做到,考虑严谨,并采取加大投入的办法改变一些机械替代方式,如现场砼输送泵改为汽车泵车输送办法。(7)对各类机械严格按照操作规程要求,周密计划性的机械作业时间相互错开,以免集中施工,噪音超标,加强机械的日常检修与保养,设专人经常对现场噪音值进行监测;发生噪音超标时及时进行原因分析,及时采取措施予以解决。3.1.4.2实施阶段:基础、主体、装修时期。3.1.4.3预算资金:投资项目名称单位面积需用资金(元)备注木工棚m2150120000料具棚(砂轮锯、焊机、切断机、调直机棚振动棒)m210010000通讯设备、人为噪音控制10000合计1320003.1.4.4责任人及完成时间:(1)各工种人员的安全措施交底由安全组负责:责任人:彭志奇;执行人:王淑明,苏志伟。要求完成时期2018年8月7日。(2)各类设备、措施的施工由工程组负责,技术组配合,负责人:郝占勋执行人:张豪、孙中堂、于子群、丁武伟。要求完成时间:2018年8月7日3.2施工扬尘控制措施3.2.1目标9制定管理方法及实施法律制度、设立防尘、降尘的设施和措施,达到市级样板文明工地标准。3.2.2指标现场目测1.0m以上无扬尘,主要环形道路及环路主要物料场地全部硬化。施工现场应每天根据现场情况及时进行清扫洒水;在土方施工、干燥天气、风力四级以上的天气条件下,应适当增加洒水次数。现场采用自动喷淋降尘系统。沿现场内主要道路围挡或防护栏杆下部布设PVC水管和喷头,每日根据环境情况喷淋降尘。通过喷头均匀喷洒,最大限度的利用水的降尘效果,用洒水车或人工来洒水。专职岗位制要求。3.2.3施工扬尘的管理措施:施工现场松散材料类别分为:粉状、袋状、(白灰、石膏粉等),松散颗粒状材料(砂子、石子、页岩陶粒、石渣)。(1)粉状松散材料,砂、石、石渣等进场按规定地点存放,密织尼龙网覆盖严密。(2)基槽灰土回填土时,严禁抛灰筛土,要求先按计量人工拌和,再过筛办法避免白灰产生扬尘现象。(3)注意天气情况计划分析避免刮大风天时,松散材料进场,同时要求四级以上(含四级)大风天气不得进行松散物扬筛作业。(4)严格把关用料计划进场要求,避免一些松散料过早进场现象。(5)装修期间料场扬尘管理:1)砂子、石子、材料进场及时堆放覆盖,每种料场规划为三面490宽砖档墙,高1.5m料场面积约300m2,院内地面硬化水泥地面;时常保持料堆干净、整洁专人清扫、无扬尘。2)水泥袋装,专用库房存放。3.2.4施工过程降尘管理:(1)施工现场各场区责任区包干进行监督检查制度。(2)施工现场设专人清扫、降尘洒水工作配备自制洒水设备及使用工具。10(3)楼内施工垃圾采用专用垃圾料料斗(铰连结扣盖封闭式),而且随即运至垃圾房。(4)现场设立封闭式施工垃圾房,不少于三处,生活和生产垃圾分开。日存日清运要求,并设专人管理措施。(5)四级以上(含四级)大风的天气禁止产生扬尘的作业施工。(6)任何运输松散物料的运输车,必须采用防尘专用车辆。以防路途中遗洒或扬尘。(7)楼内需进行清扫,要求应提前2小时安排专人进行地面洒水湿润,避免尘土飞扬的现象。(8)冬施过程中,保温材料,聚苯板,保温板等易碎物料,要求随作业随清理,不得出现散料遗弃抛扔。(9)装修施工中,对成品保护材料(如保护膜、捆扎的草绳等)禁止随手遗弃,作业人员必须用纺织袋存放,统一清运。(10)木工作业中的锯末、刨花清理要求,采用纺织袋装运至垃圾间,不得松散,车运防止散落现象发生。(11)总包与施工企业对环保要求应签订协议书、责任状,并制定管理及奖罚制度。3.2.5现场道路硬化管理要求:(1)施工现场场地全部硬化。钢筋加工棚、木工棚、料具棚办公区全部硬化。(2)车辆进入口(大门处)设置洗车水池以免零星泥土带入及带出现场。(3)场内道路及场地要求专人清扫,时常保持清洁卫生。3.2.6施工现场绿化环境。3.2.7投入资金:投入项目名称单位工程量需用资金(元)备注11场内硬化路道m2120001000000降尘、绿化、洒水、器具30000垃圾间、砂石料池、颗粒物覆盖物100000合计11300003.2.8完成时间及责任人:名称完成时间道路硬化2016.3.1-2016.4.1绿化环境2016.4.1-2016.4.15此方案由工程组、安全组负责。负责人:彭志奇执行人:郝占勋、张豪3.3生产、生活垃圾控制措施:3.3.1目标:贯彻环境法的实施,确保文明现场,卫生要求符合标准,在生活、生产区设立垃圾站,控制垃圾存放,注意对大气污染,对人
本文标题:环境管理方案
链接地址:https://www.777doc.com/doc-5726473 .html