云南龙江特大桥A合同段钢箱梁安装安全专项方案编制:复核:审核:中交第二公路工程局有限公司龙江特大桥A合同段项目经理部2013年8月1目录1工程概况..........................................................11.1工程概述......................................................11.2水文气象条件..................................................12编制依据..........................................................23施工工序简介......................................................23.1缆索吊设计与施工..............................................33.1.1缆索吊总体布置.............................................33.1.2缆索吊关键部位结构设计....................................33.1.3缆索吊安装施工............................................63.1.4系统调试与试吊.............................................93.2钢箱梁安装...................................................103.2.1施工机具准备.............................................103.2.1猫道处理..................................................103.2.2钢箱梁吊具................................................113.2.2钢箱梁吊装施工工艺流程....................................113.2.3钢箱梁吊装施工............................................124危险源辨识、风险评价及控制措施...................................145安全控制要点.....................................................185.1塔吊作业安全控制要点.........................................185.2龙门吊安全操作控制要点.......................................195.3十不吊.......................................................205.4卷扬机安全控制要点...........................................215.5缆索吊安全控制要点...........................................215.6钢丝绳安全控制要点...........................................235.7千斤顶安全控制要点...........................................265.8手拉链条葫芦安全操作控制要点.................................265.9升降机安全控制要点...........................................275.10高处作业安全控制要点........................................285.11高处作业吊篮使用安全操作规程................................295.12电焊机安全控制要点..........................................295.13气割作业安全控制要点........................................306安全保障措施.....................................................316.1建立健全安全管理制度.........................................316.2编制钢箱梁吊装施工技术方案、安全方案.........................316.3安全知识培训及安全技术交底...................................3126.4加强施工过程安全检查.........................................326.4.1定期、不定期安全生产检查..................................326.4.2专项安全检查..............................................326.4.3特殊性检查................................................326.4.4整改、复查、验收..........................................336.5施工安全保障措施.............................................336.5.1缆索吊安装安全保障措施....................................336.5.2钢箱梁吊装安全保障措施....................................346.5.3临时用电安全保障措施......................................376.5.4雨季施工安全保障措施......................................386.5.5夜间施工安全保障措施......................................397应急救援.........................................................397.1成立应急救援领导小组.........................................397.2应急指挥机构职责.............................................407.3事故报告程序及内容...........................................427.4应急救援程序响应.............................................427.5应急求援措施.................................................437.5.1坍塌事故急救..............................................437.5.2触电事故急救..............................................437.5.3机械伤害、起重伤害急救....................................447.5.4物体打击事故急救..........................................457.5.5高处坠落击事故急救........................................4611工程概况1.1工程概述龙江大桥主桥为320m+1196m+320m的双塔单跨钢箱梁悬索桥,主缆采用预制平行钢丝索股(PPWS),中跨矢跨比为1/10.5,两根主缆横桥向中心间距为25.5米。除两岸处长吊索距离桥塔中心15.2米外,其余吊索间距均为12.4米。主桥桥型总体布置图见图1.1-1所示。图1.1-1龙江特大桥主桥总体布置图(单位:cm)主桥钢箱梁全宽33.5m(含两侧各2.5m的检修道),高3.0m,全桥钢箱梁分A、B、C三种类型,共97段。A梁段为标准梁段,长12.4m,全桥共95段;B、C各一块,分别为腾冲、保山侧塔区无吊索梁段。钢箱梁吊装工程量见表1.1-1:表1.1-1梁段安装工程数量表梁段类型梁段长(m)单块重量(t)梁段数量(块)总重(t)备注A12.4153.49514851.9标准梁段,有吊索B8.91521腾冲侧塔区梁段,无吊索C7.3126.91保山侧塔区梁段,无吊索钢箱梁标准断面如图1.1-2所示。图1.1-2钢箱梁标准横断面图(单位:mm)1.2水文气象条件龙江特大桥跨越龙陵县龙江乡上邦焕村与腾冲县五合乡大丙弄村之间的龙江河谷,桥区属于中切割高中山峡谷地貌,该路线位于熔岩台地和河谷陡坡地区,2附近河段谷底高程在1180m左右,谷肩地带高程保山岸为1400~1450m,腾冲岸1410~1480m,河谷切割深度大,桥面距离谷底约280m,谷口宽度约1100m,桥轴纵断面岸坡坡度一般为30~60°,且多见陡崖峭壁,植被发育,溯源侵蚀强烈,堆积作用甚微。本区降雨受孟加拉暖湿气流控制,每年5~10月为雨季,11月到次年4月为旱季。龙江河谷区年均降雨量一般小于1600mm,向两侧随海拔增高逐步增加至1800~2000mm左右,盛行西南风,唯8~9月多有北风,一般风速1.6m/s~3.5m/s,瞬时最大风速28m/s。桥址处于中游龙江河段,平均水位4.33m,最高水位与最低水位相差5.24m,水位变幅较大;年平均流量47.2亿m³,属典型的山区性河流,为降雨补给,河水流量与降雨量在时间上相一致,雨季河水流量占全年流量的80%,为汛期,6~8月份流量为峰期,最小流量出现3~4月。2编制依据(1)《中华人民共和国安全生产法》(2002年11月1日起施行);(2)《中华人民共和国建设工程安全生产管理条例》(2004年2月1日起施行);(3)《公路工程施工安全技术规程》(JTJ076-95);(4)《施工现场临时用电安全技术规范》(JGJ46—2005)(5)《建筑施工高处作业安全技术规范》(JGJ80—1991)(6)《危险性较大的分部分项工程安全管理办法》建质[2009]87号(7)《起重机械安全规程》(GB6067.1-2010)(8)《缆索起重机技术条件》(SL375-2007)(9)《缆索起重机型式试验细则》(TSGQ7009-2007)(10)《重要用途钢丝绳》(GB8918-2006)(10)《职业健康安全管理体系》(GB/T28001-2011)(11)《环境管理体系》(GB/T24001-2004)(12)《钢箱梁安装施工技术方案》(2013年8月)(13)中华人民共和国国家、交通部、建设部行业相关标准。3施工工序简介33.1缆索吊设计与施工3.1.1缆索吊总体布置缆索吊主索跨径组合为310m+1196m+310m,利用两岸索塔作为缆索吊塔架,支撑索鞍布置于索塔上横梁顶面,主索分别锚固于两岸锚碇的散索鞍支墩上。缆索吊机左、右幅各设置1套起吊系统,主索左、右幅中心间距中跨16.2m,边跨锚固点中心间距25.5m。起重卷扬机及牵引卷扬机分别布置于两岸塔锚间引道上。缆索吊机总体布置见图3.1-1。图3.1-1缆索吊机总体布置图(单位:cm)缆索吊主要参数见表3.1-1所示。表3.1-1缆索吊主要设计参数项目参数最大额定起重量170t(含吊具)跨径布置310m+1196m+310m工作状态最大垂度(矢跨比)95m(L/12.6)最大纵移距离1
本文标题:钢箱梁吊装安全专项方案..
链接地址:https://www.777doc.com/doc-5808487 .html