您好,欢迎访问三七文档
当前位置:首页 > 建筑/环境 > 工程监理 > 冲孔灌注桩专项施工方案1
南沙产业园区管理服务中心广州协安建设工程有限公司1目录一、概述··········································································································2二、编制依据····································································································2三、施工主要机械设备准备··················································································3四、施工组织····································································································3五、作业条件····································································································4六、现场施工平面布置························································································5七、施工操作工艺······························································································6八、具体施工方法······························································································8九、质量控制与检验标准···················································································17十、安全措施··································································································19十一、常见施工问题及处理方法··········································································20南沙产业园区管理服务中心广州协安建设工程有限公司2一、概述工程名称:南沙产业园区管理服务中心新建工程建设单位:广州发展南沙投资管理有限公司设计单位:华南理工大学建筑设计研究院监理单位:广州建达建设监理有限公司施工单位:广州协安建设工程有限公司本工程位于南沙开发区珠电进厂路及环岛路交叉路口(原火电大院内),为一栋地上四层,地下一层(半地下室)的建筑物,地块面积约9612m2,建筑面积约19974m2,其中架空层(停车场)约5827m2,办公区约12327m2,配送中心约1010m2,食堂约810m2。基础为钢筋砼预应力管桩,主体为钢筋砼框架结构,建筑使用年限为50年,建筑等级为二级,抗震设防烈度为7度,建筑耐火等级为二级。本工程基础原采用静压预应力高强混凝土管桩,选用的管桩是PHC-AB500(100)型号,共364根。在施工过程中形成废桩81根。根据设计院补桩图(图号:结施-02代1,出图日期2008年10月24日),所有废桩的补桩办法为:补PHC桩2根;补灌注桩50根,其中桩径800mm有41根,桩径1000mm有9根。具体位置见平面图附后。二、编制依据1、南沙产业园区管理服务中心及相关图纸、工程地质资料;南沙产业园区管理服务中心广州协安建设工程有限公司32、国家现行相关的规范、规程及行业技术标准,主要包括:1)《混凝土结构工程施工质量验收规范》(GB50204-2002);2)《建筑地基与基础工程施工质量验收规范》(GB50202-2002);3)《建筑桩基技术规范》(JGJ94-2008);4)《建筑基桩检测技术规范》(JGJ106-2003);5)广东省标准《建筑地基处理技术规范》(DBJ15-38-2005);三、施工主要机械设备准备1、机械设备采用CK-1800冲击钻机3台、3~5t双筒卷扬机、插入式振捣器、泥浆泵3台、翻斗汽车、机动翻斗车、水泵以及钢筋加工系统设备等。2、主要工具冲锤或冲击钻头、钢护筒、掏(抽)渣筒、钢吊绳;测渣铁砣、混凝土浇灌台架、下料斗、卸料槽、导管、预制混凝土塞、大小平锹、磅秤。四、施工组织1、项目部管理人员序号姓名职务负责工作1陈天英技术负责人现场技术主控及指导2江有根安全员负责现场安全工作3梁亚六施工员施工安排及监督施工队南沙产业园区管理服务中心广州协安建设工程有限公司44李黎保测量员测量工作2、施工队人员序号姓名职务负责工作1蔡雄权技术负责人现场具体施工技术指导2黄海昌管理员施工队人员管理3梁月兴资料员负责施工资料记录机整理4黄锦泉材料员施工材料采购及管理5黄海昌机长冲桩机操作6韦启强机长冲桩机操作7黄祖旺机长冲桩机操作8韦世队电工现常用电维修9何友焊工现场钢筋笼制作10谢忠鉴焊工现场钢筋笼制作五、作业条件1、施工前,必须取得所需的地质勘察报告、桩基施工图,并编制施工技术方案或措施。2、施工场地内所有地区性上障碍物和地下埋设物(如管线、电缆、旧圬土、石块、树根等)已经排除,附近有隔震要求的建筑物和危房已采取保护措施。3、场地已经整平,周围已设排水设施,对场地中影响施工机械进场的松软土层已进行适当碾压处理。4、施工临时供水、供电、运输道路及小型临时设施已经铺设或修筑,泥浆池及废浆处理池等已设置。5、桩基测量控制桩、水准基点桩已经设置并经复核,桩位已钉南沙产业园区管理服务中心广州协安建设工程有限公司5小木桩或撒白灰标志。6、已在现场进行成孔试验,数量不少于2个,摸清地质情况并取得有关成孔技术参数。六、现场施工平面布置1、冲桩顺序:本工程共投入三台冲桩机,为使各个桩机互相不干扰作业,特确定如下冲桩路线。(1)1#机冲孔顺序:4#→8#→10#→7#→5#→6#→9#→22#→27#→26#→28#→29#→33#→30#→32#→36#共16根桩。(2)2#机冲孔顺序34#→31#→35#→38#→39#→46#→37#→47#→40#→42#→43#→41#→44#→45#→48#→50#共16根桩。(3)3#机冲孔顺序1#→11#→12#→14#→13#→23#→24#→15#→16#→20#→2#→17#→3#→21#→18#→25#→19#共17根桩。2、泥浆池布置:现场大泥浆池布置在拟建建筑物西北角,M轴外(1-4轴范围内)。南沙产业园区管理服务中心广州协安建设工程有限公司6大小约50m3。3、余泥浆用卡车运走。4、施工平面布置详见附后平面图。七、施工操作工艺1、冲击钻成孔灌注桩施工工艺程序是:场地平整→桩位放线→标高确定→开挖浆池、浆沟→护筒埋设→钻机就位,孔位校正→冲击造孔,泥浆循环→清除废浆、泥渣→清孔换浆→入岩确认→终孔验收→下钢筋笼和钢导管→清孔→首灌→灌注水下混凝土→成桩养护。2、成孔时应先在孔口设圆形6~8mm厚钢板护筒,护筒(圈)内径应比钻头直径大200mm,护筒总高一般为1.0-1.5m(其中埋入土内深度为0.5-1.0m,露出地面0.5m),然后使冲孔机就位,冲击钻应对准护筒中心,要求偏差不大于±20mm,开始低锤(小冲程)密击,锤高0.4~0.6m,并及时加块石与粘土泥浆护壁,泥浆密度和冲程可按下表选用,使孔壁挤压密实,直至孔深达护筒下3~4m后,才加快速度,加大冲程,将锤提高至1.5~2.0m以上,转入正常连续冲击,在造孔时要及时将孔内残渣排出孔外。各类土层中的冲程和泥浆密度选用表项次项目冲程(m)泥浆密度(t/m3)备注1在护筒中及护筒刃脚下3m以内0.9~1.11.1~1.3土层不好时宜提高泥浆密度,必要时加入小片石和粘土块2粘土1~2清水或稀泥浆,经常清理钻头上泥块3砂土1~21.3~1.5抛粘土块,勤冲勤掏渣,南沙产业园区管理服务中心广州协安建设工程有限公司7防塌孔4砂卵石2~31.3~1.5加大冲击能量,勤掏渣5风化岩1~41.2~1.4如岩层表面不平或倾斜,应抛入20~30cm厚块石使之略平,然后低锤快击使其成一紧密平台,再进行正常冲击,同时加大冲击能量,勤掏渣6塌孔回填重新成孔11.3~1.5反复冲击,加粘土块及片石3、冲孔时应随时测定和控制泥浆密度,每冲击1~2m深应排渣一次,并定时补浆,直至设计深度。排渣用抽渣筒法,是用一个下部带活门的钢筒,将其放到孔底,作上下来回活动,提升高度在2m左右,当抽筒向下活动时,活门打开,残渣进入筒内;向上运动时,活门关闭,可将孔内残渣抽出孔外。排渣时,必须及时向孔内补充泥浆,以防亏浆造成孔内坍塌。4、泥浆每隔1小时进行一次浓度检测。5、在钻进过程中每1~2m要检查一次成孔的垂直度。如发现偏斜应立即停止钻进,采取措施进行纠偏。对于变层处和易于发生偏斜的部位,应采用低锤轻击,间断冲击的办法穿过,以保持孔形良好。6、成孔后,应用测绳下挂0.5kg重铁砣测量检查孔深,核对无误后,进行清孔。可使用底部带活门的钢抽渣筒,反复掏渣,将孔底淤泥、沉渣清除干净。7、清孔后应立即放入钢筋笼,并固定在孔口钢护筒上,使在浇灌混凝土过程中不向上浮起,也不下沉。钢筋笼下完后,再次进行清孔,并检查无误后,应立即浇筑混凝土,间隔时间不应超过4h,以南沙产业园区管理服务中心广州协安建设工程有限公司8防泥浆沉淀和塌孔。混凝土灌注一般采用导管法在水中灌注。八、具体施工方法1、准备工作1)桩机就位根据现场平面布置,将3台桩机对准开始位置。2)冲击系统的连接:(1)转向环和锤头连接:将准备好的连接环(直径50毫米圆钢,长约110~120厘米制成的)穿套于转向环的下端,然后将连接环的两脚与锤头焊接牢固。其焊缝长度不少于30厘米。(2)卷扬机和冲锤的连接:主拉钢丝绳的一端固定在卷扬机上,另一端通过地滑轮、顶滑轮,而与转向环的上端连接,为了加大钢丝绳在弯曲部分的受力半径,延长钢丝绳的使用寿命,在钢丝绳的弯曲部位安装特制的槽形护铁。固结钢丝绳的第一个卡扣不可拧得太紧,以避免钢丝绳受力后在这里受伤而断脱。一般用3个卡扣,卡扣之间的间距应不少于6倍钢丝绳的直径。3)埋设护筒:(1)挖坑:挖深0.5~1米。护筒口必须高出地面至少50厘米以上,以保持孔内水位高于孔外水位或地面,使孔内水压力增加,利于保护孔壁不坍。基坑挖好后,安放护筒。(2)回填:先在护筒外围底部垫厚约20厘米的胶泥(耙耙泥)用脚踩紧,然后叠砌黄土草袋,草袋交错叠放,砌好一层草袋,又铺南沙产业园区管理服务中心广州协安建设工程有限公司9上一层胶泥,踩紧之后,叠砌第二层草袋,又铺一层胶泥,踩紧,如此更续填筑,使之略低于护筒口20厘米左右为止。黄土草袋和胶泥必须做到层层密实,这样既可防止河水渗透,同时使护筒固定不动。(3)准备护壁料:如地表为软土质,则在护筒里加片石、砂砾和黄土,其比例大致为3:1:1。如地表为砂砾卵石,在护筒里只加小石子(小颗粒的砂砾石)和黄土,比例大致为1:1。这些工作都要在开始冲孔之前作好。4)护壁泥浆的调制和使用(1)泥浆原料黏性土的性能要求本工程采用的泥浆原料为黄土(黏性土),可选用塑性指数大于25,粒径小于0.074mm的黏料含量大于50%的黏性土制浆。当缺少上述性能的黏性土时,可用性能略差的黏性土,并掺入30%的塑料指数大于25的黏性土。3)泥浆外加剂及其掺量a.CMC(CarboxyMethylCelluose)全名羧甲基纤维素,可增加泥浆黏性,使土层表面形成薄膜而防护孔壁剥落并有降低失水量的作用。掺
本文标题:冲孔灌注桩专项施工方案1
链接地址:https://www.777doc.com/doc-5907910 .html