您好,欢迎访问三七文档
当前位置:首页 > 行业资料 > 其它行业文档 > 二沉池污泥上浮的控制策略侯巧玲
侯巧玲 关云峰 尉国红 罗国强( 100022) ,。、。、、,,。 ControlofSludgeFloatingintheSecondarySettlingTankHOUQiaoling GUANYunfeng WEIGuohong LUOGuoqiang(BeijingUrbanConstructionEnviromentalProtectionInvestment&DevelopmentCo.,Ltd. Beijing100022)Abstract TheoxidationditchsludgetreatmentprocessisusedinDachengSewageTreatmentPlant.Thecausesoffloatingupwardofsludgeinsecondarysettlingtankisdiscussed.Themaincausesoffloatingupwardofsludgeisthehighdegreeofnitrificationandtoolongsludgere-tentioninthesecondarysettlingtank.Somemeasuresareadoptedtocontrolthesludgefloatingandmketheproductionnormal,suchasre-ducingthedissolvedoxygenintheoxidationditchtolowerthedegreeofnitrification,reasonablymodulatingtheoperationofthesecondarysettlingtankandincreasingsludgerefluxandremainedsludgerelease.KeyWords oxidationditch floatingupwardofsludge denitrification0 。。,,,[1]。1 。、3,,《》(GB18918—2002)A。1。1 2 1.5×104m3/d,10,10.8km2;4.0×104m3/d,16.6,16.7km2,。1,HRT1.5h,1,:17~20d,(BOD/MLSS)0.09kg/(kg·d),MLSS3.5g/L,HRT12h,100%。13,6(42),1。2(11)。、1。 1 、mg/L(pH)BODCODSSTNNH3-NTPpH19037019045403.06~9≤10≤50≤10≤15≤5(8)≤0.56~9 2。 2 mg/L(pH)BODCODSSTNNH3-NTPpH8621014052453.26~9 2,,,。3 3.1 ,,·52· IndustrialSafetyandEnvironmentalProtection 20113711November2011。200910,,,,。,,SS。,,,。,、,,。3.2 (1)。SVI170mL/g,,,12℃,,,,[2]。,SVI120mL/g,,。(2)。,、,1m3/d22500m3/d,,。2。2 2,97%,46.34mg/L,0.99mg/L,,6h,N2,,,。,,。,。(3)。,,,,,,。。4 (1),。,,DO2mg/L,,,,,DO1.2mg/L,3。3 DO3,DO,45.6mg/L,3.52mg/L,89%。(2)。0.8m3/(m2·h),2.5h,,0.4m3/(m2·h),。。(3),。80%120%,,,,,,,[3],。,5500mg/L3200mg/L,,。5 ,,、、、,,。[1],,.AAC[J].,2006,26(4):78-79.[2],,,.A2/O[J].,2010,26(13):44-45.[3],,,.[J].,2000,18(6):25-27. 侯巧玲,女,1978年生,四川阆中人,硕士研究生,助理工程师,研究方向为水污染控制。(:2010-08-20)·53·
本文标题:二沉池污泥上浮的控制策略侯巧玲
链接地址:https://www.777doc.com/doc-6558191 .html