您好,欢迎访问三七文档
当前位置:首页 > 建筑/环境 > 工程监理 > 高浓度石化废水综合处理工程徐志标
徐志标, 童学强(广东省城乡规划设计研究院,广东广州510290) : 采用气浮/铁炭曝气/芬顿氧化/UASB/生物接触氧化工艺处理高浓度石化废水,介绍了系统的启动与运行情况。工程实践表明,该组合工艺对COD、色度等均有较好的去除效果,处理后出水水质达到《污水综合排放标准》(GB8978—1996)的一级标准。 : 石化废水; 气浮; 铁炭曝气; 芬顿氧化; UASB; 生物接触氧化:X703.1 :C :1000-4602(2009)22-0066-03ComprehensiveTreatmentProjectofHigh-concentrationPetrochemicalWastewaterXUZhi-biao, TONGXue-qiang(GuangdongUrbanandRuralPlanningandDesignInstitute,Guangzhou510290,China) Abstract: Theairflotation/Fe-Caeration/Fentonoxidation/UASB/bio-contactoxidationprocesswasusedtotreatthehigh-concentrationpetrochemicalwastewater.Thestart-upandoperationsituationofthesystemareintroduced.TheprojectpracticeindicatesthatthiscombinedprocesshasagoodremovalefficiencyofCODandcolor.ThetreatedeffluentqualitycanmeetthefirstlevelcriteriaspecifiedintheIntegratedWastewaterDischargeStandard(GB8978-1996). Keywords: petrochemicalwastewater; airflotation; Fe-Caeration; Fentonoxidation; UASB; bio-contactoxidation1 工程概况,COD、(BOD/COD0.1)。(),[1]。,,。40m3/d,COD15000mg/L,BOD51500mg/L,SS800mg/L,pH3~4,《》(GB8978—1996)。2 工艺流程和主要构筑物2.1 1。1 Fig.1 Flowchartofwastewatertreatmentprocess ,,COD;·66·第25卷 第22期2009年11月 中国给水排水CHINAWATERWASTEWATER Vol.25No.22Nov.2009,,。,,UASB。UASB,CH4CO2。UASB,、,。,,,。2.2 ,。1。1 Tab.1 Mainstructuresandtheirparameters//m3/4.0m×5.0m15033m3,;17m32.2m×4.0m1121∶1,2.78kg/m3,HRT8h2.2m×4.0m112,HRT8h2.2m×4.0m112UASB4.0m×5.0m2502UASB,HRT58h,40m3,1.5m×5.0m17,HRT4h4.0m×5.0m350,HRT29h,40m3,,2(11),DO2~4mg/L2.2m×4.0m112,HRT7h,500mm2.2m×6.0m1220.7m,3 工程调试与运行3.1 /,,、,。(0.4MPa),,,,,,,。,,COD12000mg/L,COD20%。3.2 ,pH3~4,(DO4.0mg/L),,,,H2、Fe2+、Fe3+,,,。,,、、,[2]。,COD7440mg/L,COD38%。3.3 pH5,,,()pH3,FeSO42000mg/L,H2O23000mg/L,,Fe2+,H2O2,·OH,HO2·[3]。,Fenton·OH,、。,COD2970mg/L,COD60%,90%。3.4 ,NaOHNaHCO3pH7.0~7.5,。38℃,。·67·徐志标,等:高浓度石化废水综合处理工程第25卷 第22期3.5 UASB,,20kg/m3。、,33~38℃,pH7.0~7.5,1500mg/L。UASB,,0.7kgCOD/(m3·d),pH、、VFACOD,(2000~5000mg/L),VFA1000mg/L,。COD60%,4.9kg-COD/(m3·d)。,,,。,UASBCOD60%,COD1200mg/L。3.6 UASB,,UASB,,UASB,。3.7 UASB,10kg/m3,24h,DO2.0~4.0mg/L。,C∶N∶P=100∶5∶1、,。,,100%,COD、pH、DO、。10d,,,,,。,COD100mg/L,COD92%。3.8 ,,;COD100mg/L。5000mg/L(50%),。1/。3.9 ,,。4 经济效益分析40m3/d,0.74/m3;25kg/d,2300/t,1.44/m3;FeSO480kg/d,500/t,1/m3;H2O2120kg/d,1400/t,4.20/m3;2,650/(·),1.08/m3。8.46/m3,12.35/a。5 结论① ,,。。② ///UASB/,,《》(GB8978—1996)。:[1] .[J].,2003,29(1):46-47.[2] .[M].:,2003.[3] ,.Fenton[J].,2000,21(3):93-96.:15918719819E-mail:xuzhibiao2007@163.com:2009-07-20·68·第25卷 第22期 中国给水排水
本文标题:高浓度石化废水综合处理工程徐志标
链接地址:https://www.777doc.com/doc-6563592 .html