您好,欢迎访问三七文档
第1页共20页目录一、编制依据·····················································································································2二、编制原则·····················································································································2三、工程概况·····················································································································2四、施工特点·····················································································································2五、透水混凝土特点·········································································································2六、施工准备·····················································································································6七、施工管理·····················································································································8八、生产规划···················································································································12九、质量保证···················································································································14十、安全生产措施···········································································································16第2页共20页彩色透水混凝土专项施工方案一、编制依据1、锦江大道(科华南路一驿都大道)绿道建设项目施工图纸;2、《透水水泥混凝土路面技术规程》(CJJ/T135-2009);3、《高承载透水混凝土艺术地坪施工与验收规程》(QBZJ/01-2007)。二、编制原则1、本工程质量要求:符合国家现行验收合格标准;严格按照设计标准,现行施工规范和质量检验评定标准,紧密结合现场实际情况,编制技术先进、切实可行、经济合理的施工方案,配备性能优良、配套的施工设备,确保工程质量合格率100%,工程质量优良率90%以上。2、确保工期目标,合同工期85日历天。依据我项目部现有的技术水平、施工管理经验和设备配套能力,科学统筹安排施工进度,安排体现合理、高效,施工区段划分做到协调统一,均衡生产,以确保本工程施工总工期。三、工程概况锦江大道(科华南路-驿都大道)绿道建设项目,位于成都市锦江区锦江大道,由成都市兴锦现代农业投资有限责任公司投资兴建,包括新建绿道3.48万平方米,改造绿道0.16万平方米,改造绿化约15.9万平方米。包括园建工程、绿化工程、景观给排水工程和景观电气工程四部分内容如下:园建工程主要内容:人行道、骑行道、游步道、广场、花池、构筑物、雕塑、廊架、景观小品等内容。绿化工程的主要内容:乔木、灌木、绿篱、地被及草坪的种植和养护。景观景观给排水工程的主要内容:景观给排水管道系统。景观照明工程的主要内容:景观照明配电系统和设备接地系统及安全措施。含弱电排管和各类升降井及井盖安装。四、施工特点1、透水混凝土施工要求高效、专业、经验丰富的施工队伍。序号内容1高承载透水地面之间的结合2特殊伸缩缝设置(与基层)3伸缩缝的设置(面层美观度)4高承载透水地面与其他材料之间防断裂2、合同工期85天,组织足够的人员与机械,保证能如期完成工程。3、施工的工序是所有工程里的最后一道铺装工序,所以要把工程质量及效果做到最好,使整个工程取得成功。五、透水混凝土特点1、产品优点第3页共20页1)高承载力整体性高承载透水艺术地面铺装系统,其抗沉降性能强于一般透水砖地面系统。同时,这种铺装系统也具有抵抗土壤冻胀对刚性路面产生破坏的能力。2)高透水率高承载透水艺术地面拥有15%~25%的孔隙,混凝土面层透水速度达到270升/平米/分钟,远远高于最大的降雨在最优秀的排水系统下的排出速率。3)安全性能高由于具有高透水率这一特点,从而使得路面不会产生积水,消除了路面反光和车辆高速行驶形成的水雾问题,大大提高了路面的防滑性能,保证了行驶的安全性。4)吸尘降噪并防治河流污染15%~25%的大孔隙,对降尘起到了吸附作用,并且降低了车辆行驶产生的噪音。传统停车场流走物中的主要成分,是来自停车场地本身沥青粘合剂中的碳氢化合物(油类),而这种化合物对环境是有污染的,采用高承载透水地面的停车场能够有效消除这种污染的危害及其影响。5)调节空气温度、湿度,缓解城市热岛效应高承载透水艺术地面是一种能够有效补充地下水,缓解城市热岛效应的很好的铺装解决方案。6)面层艺术装饰效果高承载透水艺术地面具有很强的艺术装饰性和可塑性,能够实现不同的造型图案、分割样式和多种配色方案,来满足不同环境和个性化要求的装饰风格。2、材料特性1)塌落度低,通常为0-2cm。2)拥有15%--25%的大孔隙。第4页共20页3)透水率强,2.7-4.5mm/s(毫米每秒)。第5页共20页4)抗冻融性:经实验室检测,经50次冻融循环频率温度后试件质量损失极小,强度损失率为11%。5)耐酸雨性能由于高承载透水地面内部孔隙结构与外界环境相通,对路面长期耐久性和抗腐蚀性能有更高要求,北京又属我国中度弱酸雨地区,应奥运森林公园业主及设计方的要求,由北京市建筑工程质量检测中心制定了针对耐酸雨腐蚀的检测方案,并进行了试验,试验结果令人满意。3、结构特点:1)配合比:通过骨料、水泥、外加剂、耐候树脂和矿物掺料等实现高强度、高耐久性、抗腐蚀性和抗冻融性,并确保可工作时间和改善水泥浆粘度。第6页共20页2)水灰比(W/C)通常在0.27—0.30(下图分别显示过干、适中和过湿的透水砼)过干过湿适中六、施工准备(一)、施工前准备1、认真阅读施工图纸,会同设计、业主、监理、总包进行图纸会审,并做好图纸会审记录。2、按实际工程需要配备各专业工程师、施工工长、施工班组。3、做好施工组织设计、施工方案和工程技术、安全交底工作。4、按施工总平面布置图搭设临时设施。5、及时提供材料合格证明、材料试验报告等。6、协调工程进度、各专业配合,按计划完成各施工任务,确保施工总进度。7、搞好自身管理,协调设计、建设、监理、总包各项关系,确保工程管理、步调一致。8、施工用水。本工程施工用水采用市自来水厂水源组织施工。第7页共20页(二)、场地准备1、搅拌场地:因工期紧工作量大,面层石子、底层碎石、水泥、透水混凝土专用材料等需按照每天需施工完成的面积全部备齐。2、库房及设备。(三)、用电准备施工现场为市政主干道两侧绿道改造工程,根据本工程特点,结合现场实际情况,无电源接驳点,全段施工采用发电机发电施工。在施工过程中,保证足够的安全用电措施,并符合《施工现场临时用电安全技术规范》及现场施工机械配合进行临时用电设计的编制。1、根据各种机械的总用电量,计算搅拌场地所需的用电功率:2、设计配电设备、电线、电缆的规格,根据用电平面布置图进行线路、设备、开关敷设等安装。(三)、材料准备1、通用材料:水泥、石子。2、专用材料:根据现场施工进度运输至施工现场。所有材料根据施工进度进场,同时由于施工工作面狭长,现场石子和水泥只能根据各工作面施工需要,准备3天内正常施工材料。其他材料均按全部需求量储存备料,所使用的碎石粒径应符合技术要求。(四)、机具准备1、机械设备一览表:序号机具名称规格数量产地备注1强拌式砼搅拌机JS350型4台山东2人力手推车20辆山东3混凝土切割机行走式500型4台陕西4摩擦式整平机4套美国进口5长杆压实棍2台美国进口6水平仪B404台中国深圳7汽油平板夯4台上海8砂轮切割机4台山东第8页共20页9高压清洗机QL3804台苏州10柴油发电机50kw3台陕西11柴油发电机30kw8台12柴油发电机10kw3台13柴油发电机7.5kw3台14柴油发电机5.5kw2台15喷涂机5台北京16道路吹风机5台山东17材料二次转运车辆4辆2、辅助材料:填缝胶(胀缝间距6m)。3、配套工具及易耗材料:木模板(12cm)、滚刷、剪刀、刮板、墨斗、30M~50M钢尺、钻头、水桶、拌料桶、毛刷、老虎钳、水瓢、电工工具、灯架、铁锹、灯管、地膜、彩条布、手推车、刮杠、铁抹子、修边刀、铁耙子、木抹子、笤帚、搅拌器、盒尺、移动铁架等。4、消防器材:干粉灭火器、砂袋、水等。七、施工管理(一)、管理体制在工程施工中实行项目经理负责制,采用项目成本核算制的项目法施工模式。以项目经理和主要管理、技术、质安、物资供应等主管人员为中心,组织精干、高效的项目经理部,对工程质量、工期目标、施工安全、文明施工、项目核算及施工全过程负责。对管理成员、施工机械、物资供应、施工技术管理等方面都做到充分保证。以优质、高速、安全、文明为主轴,不断优化生产要素,加强动态管理,科学组织、精心施工,大力推广先进技术,有效推广全面质量管理,强化质量、安全两个保证体系,在保证质量达到优良的同时,力争工期提前。(二)、项目组织机构1、机构图见附图一。2、现场主要管理人员工作及职责。1)项目总负责人a)对生产、经营管理工作全面负责;b)负责组织各种资源,完成本项目施工合同,对工程质量、施工进度、第9页共20页安全文明施工状况予以控制;c)贯彻实施公司的质量方针和质量目标,指导对本工程项目进行策划,制定项目质量目标和项目经理部管理职责,确保质量目标的实现;d)主持召开项目例会,对项目的整个生产经营活动进行组织、指挥、监督和协调;e)以企业法人委托代表身份处理与工程有关的外部关系及签署有关合同等其它管理职权,对总经理负责。2)项目经理a)在项目经理的领导下开展工作,负责组织本工程的施工生产、建立项目安全、质量保证体系,对施工全过程安全、质量负责;b)负责优化施工组织工作,领导安全文明施工,组织实施本工程质量计划,确保满足合同要求和实现质量目标;c)负责纠正和预防措施的组织实施。3)项目技术负责人a)负责组织本项目质量策划,组织编制质量计划并按规定报批,主持建立项目质量保证体系,将项目质量管理目标分解到各部门、班组和各岗位,并对执行情况检查,实施监督;b)负责组织图纸会审、技术交底和质量计划交底工作;c)负责组织贯彻技术规程、规范和质量标准,认真贯彻实施各级管理制度和相关程序,对本项目人员违反操作规程和程序造成的质量问题负有领导责任;(d)负责文件和资料的管理工作,确保现场使用的文件均为有效版本,指导和检查生产过程的各种质量记录和统计应用工作,确保质量记录的完整性、准确性和可追溯性;e)定期召开质量例会,并及时向公司主管部门反馈质量信息;f)负责组织动员本项目全体员工积极配合质量体系审核,认真制定纠正和预防措施;g
本文标题:彩色透水混凝土方案
链接地址:https://www.777doc.com/doc-6791106 .html