您好,欢迎访问三七文档
北京房建股份有限公司1目录一、工程概况·············································1二、编制依据·············································1三、绿色施工管理体系·····································2(一)绿色施工领导小组···································2(二)领导小组职责·······································2(三)绿色施工管理体系···································3四、重点部位控制措施·····································3五、资源节约措施·········································4(一)土地节约措施·······································4(二)材料节约措施·······································5(三)节水节能措施·······································5(四)资源利用···········································5六、环境保护措施·········································6(一)防止扬尘污染措施···································6(二)防止水污染措施·····································7(三)防止噪声污染措施···································8七、现场临设和围挡布置···································8八、职业健康与卫生防疫···································9九、施工现场节约警示标牌································102绿色施工方案一、编制依据(一)《北京市建设工程施工现场环境保护工作基本标准》(二)《绿色施工管理规程及图例》【北京市建设委员会】(三)《北京市建筑施工现场安全标准化手册》【北京市建设委员会】(四)《北京市建设工程施工现场管理办法》北京市人民政府令第247号。(五)合众思壮北斗高精度定位与位置服务产业基地施工组织设计(六)合众思壮北斗高精度定位与位置服务产业基地工图纸(七)合众思壮北斗高精度定位与位置服务产业基地施工总平面图。(八)其它有关法规、规范、标准和通知等二、工程概况(一)工地名称:科研楼等2项(合众思壮北斗高精度定位与位置服务产业基地)(二)工程地点:北京市海淀区永丰产业基地Ⅱ-4-C地块(三)工程面积:建筑面积34816.96㎡(四)建设单位:北京合众思壮科技股份有限公司(五)设计单位:北京维美工程设计有限公司(六)监理单位:北京建扶工程建设监理有限责任公司(七)施工单位:北京房建建筑股份有限公司3、安全生产管理制度及组织体系3.1组织机构(1)项目部建立安全生产管理体系,成立安全文明生产领导小组,组织领导施工现场的安全生产管理工作。安全文明生产领导小组如3下:组长:冯二女(项目经理)手机18600376639副组长:廖兵(生产经理)手机13158590221姜太平(安全主管)手机18001039011组员:曹知富王凤华和青山王凤华李宝贵史传明段世寅王国良郝向威李红亮陈芙蓉陈基华三、绿色施工管理体系(一)绿色施工领导小组组长:冯二女(项目经理)成员:肖志勇姜太平和青山李红亮史传明段世寅王见博尹健宇陈宝华李红亮高鹏王国良郝向楠郝向威历山曾建王福增李宝贵陈基华刘惠刘晓凤王景奎张喜乐(二)绿色施工领导小组职责1、计划和布置施工现场绿色、环保资源投入,制定绿色施工方案和目标。2、贯彻落实《北京市建设工程施工现场环境保护工作基本标准》、《绿色施工管理规程及图例》和《北京市建筑施工现场安全标准化手册》等法律、法规、规定及标准,组织员工学习和掌握绿色施工知识。43、进行安全检查的同时,经常和定期进行绿色施工检查,及时纠正违章施工和违章作业,确保绿色施工全面达标。4、总结和讲评绿色施工情况,奖励先进,处罚落后和违规行为。5、听取上级部门检查和群众意见,不断改进施工方法,做好“四节”(节地、节水、节能、节约材料与资源利用)工作。6、办理建筑垃圾消纳手续、收集整理绿色施工资料等。(三)绿色施工管理体系(网络图)四、重点部位控制措施(一)临时设施建设。现场办公和临时设施搭建,按规划部门的要求办理相关手续;选用有产品合格证的高效保温隔热活动板房,由具备安装、拆除资质的单位进行安装和拆除。(二)清槽和渣土绿色运输。清槽渣土外运选用已经具备“北京市流体散装货物运输车辆准运证”和“北京市渣土消纳许可证”等资绿色施工领导小组组长:冯二女副组长:姜太平具体组织实施电工班水暖班土建队装饰队后勤生活区房制定绿色施工方案收集整理资料绿色施工检查(定期和不定期)分包队现场5质的单位。(三)控制施工扬尘,降低声、光排放。1、在施工现场大门口设洗车池和高压水枪等冲水设施,车辆出场经冲洗后方可外出。2、现场和生活区分别设立封闭式建筑垃圾和生活垃圾站,建筑垃圾外运应办理车辆准运证和建筑垃圾消纳证,将车厢遮盖严密,清理车帮的浮土,轮胎用水冲刷干净,方可允许车辆出场。3、现场存放砂石料和渣土按市政府“五个100%”要求严密遮盖。4、现场施工所有场地浇筑混凝土进行硬化处理,每日专人清理和洒水。5、电锯、平刨、搅拌机等强噪音设备布置在远离居民区的一侧,搭设封闭严密的隔音防护棚。6、合理安排施工工序,尽可能或杜绝夜间高噪音作业,因技术要求需连续浇筑作业或夜间施工时,按规定办理夜间施工手续。(四)确保安全生产。1、建设工程施工按着规范要求和工程建设强制性标准进行施工,脚手架施工、塔吊吊运物料、模板施工作业、临时用电和钢筋焊接气割作业等重点施工部位,制定专项施工方案或技术措施。2、加强职工安全教育,经常和定期进行安全检查,及时纠正违章指挥和违章作业。3、做好现场安全防护,配备安全防护用品,对危险性较大的施工作业,设警戒区,专人监护,严防他人靠近和通行。64、氧气、乙炔瓶、油漆、稀料、防水材料即保温材料单独保管和存放。五、资源节约措施(一)土地节约措施。现场临时设施选择以高效保温隔热和轻便为主,便于安装和拆除,尽可能避免使用粘土砖。(二)节能措施。1、现场办公和工人宿舍等临时设施按坐北朝南设计,留通风和采光的窗口,尽量减少用电照明时间。2、夏季工人宿舍统一安装吊扇,一个宿舍安装一个,办公室内空调温度设置不低于20℃,冬季室内空调温度设置不高于26℃,空调运行期间关闭门窗。3、生活区每个宿舍安装一个灯口,会议室等大一点的房间安装两个灯口,在满足照明的前提下,室内照明功率密度均不大于5W/㎡,做到人走灯灭,杜绝长明灯现象。4、为缩短运输距离,充分利用现场优势,基础开挖的渣土现场存放。(三)节能、节水措施。同建设单位签定供水协议,生活区和施工现场分别安装水表,建立用水节水台帐。2、盥洗、生活用水器具采用节水型,符合有关规定和节水标准。3、施工现场大门口洗车池、搅拌站、和混凝土罐车冲洗等分别设沉淀池,废水沉淀后用于现场洒水降尘和浇灌绿化场地。(四)资源利用。71、现场消防栓设置,尽量与建设单位洽商,按永久性要求设置地下消防栓,避免施工后拆除,浪费材料和人工费用。2、结构柱子采用定型模板,顶板支模材料以多层板、竹胶板为主,可重复使用,这样大大降低了施工成本和能源消耗。3、钢筋焊接有要求的按要求,没有要求的采用对接的方法,避免搭接增加消耗量,钢筋损耗控制在2.5%以内。4、所有方木、木板均不得随意裁截,做到长料不短用,优材不劣用,用过的木材在现场存放,以利于再利用。5、混凝土浇筑过程中,散落水泥不待干硬随时清理和回收。6、现场临时设施以高效轻便安全为主,竣工1个月内即拆除,并能再次和重复使用。六、绿色施工及环境保护措施。(一)防止扬尘污染措施1、大门口和现场施工道路做硬化处理,浇筑厚100-150㎜的C20混凝土,即浇筑厚100㎜的C15混凝土,施工现场硬化处理100%。2、使用车辆外运渣土时,遮盖严密,车辆出场,将轮胎和车帮清扫干净,并用高压水枪冲刷轮胎;洗车池内保持一定的水位,经常清理和换水。3、基础回填,较干燥的回填土,用水管喷水降尘,四级及以上的大风天气,停止回填作业。4、设混凝土泵和混凝土运输车冲洗池,混凝土车和混凝土泵每次使用后冲刷干净,污水排入池内,待沉淀后二次用于现场道路洒水8降尘使用。5、现场砂石料存放时,用密目安全网遮盖严密,使用时,掀开一头,并及时遮盖压实。6、油漆、稀料存放,单独设危险品库房,地面使用SBS卷材做防水处理。7、二次结构和装修时,砂浆搅拌机配备喷雾器,设沉淀池,冲刷滚筒的污水排入沉淀池内,沉淀后用于现场降尘等二次利用。8、木料加工场地,搭设封闭式防护棚,并设在远离居民楼一侧。9、现场设封闭式垃圾站,现场施工垃圾清理后,使用专用封闭吊桶将建筑垃圾吊运至垃圾站,统一由垃圾运输车将垃圾外运;建筑垃圾和生活垃圾分别存放和外运;垃圾装车前,洒水后再装车。建筑垃圾外运,采取遮盖措施,轮胎和车辆清扫冲刷干净。10、食堂和茶炉使用清洁燃料,严禁使用煤炭和木柴生火做饭。11、现场杜绝熬制沥青。12、现场和生活区严禁乱丢和焚烧水泥袋、塑料袋、一次性餐盒、橡胶、电缆线护套、油布、废油漆桶、杂草、树枝、树叶、纸张等垃圾废料,废电池、电瓶等有腐蚀性废料,严禁与建筑垃圾混放。13、施工现场和施工道路指定专人经常洒水,天气干燥和刮风时,每天多次洒水,做到不扬尘。14、遇有四级风以上天气不得进行土方回填、转运和筛灰等可能产生扬尘污染的施工。15、水泥和其它易飞扬的细颗粒建筑材料应密闭存放,使用时有9防止扬尘措施。(二)防止水污染措施1、搅拌机前台、混凝土输送泵及运输车辆清洗处设置沉淀池,经二次沉淀后的水用于现场洒水降尘。2、现场存放油料和油料库房有防渗漏措施。3、食堂设置污水隔油池,除油后方可排入下水管。(三)防止噪声污染措施1、搅拌机、电锯、电刨子、大型空气压缩机等强噪声设备,搭设封闭式机棚,并尽可能设置在远离居民的一侧,以减少噪声污染。2、合理安排工序,尽量避开夜间砼振捣。3、夜间10点以后和早上6点以前需进行施工作业时,必须向院办和行政主管部门提出申请,批准后向环保备案,采取各种有效降噪措施,方可施工。4、塔吊指挥应使用无线通讯对讲机,以避免使用哨声扰民。5、钢管和其它易产生声响的料具,装卸和搬运时,应轻拿轻放,严禁从车上或高处向下投扔。6、车辆进场低油门低速行驶,不超过5公里/小时,不得鸣气笛。7、施工人员要文明作业,遵守作息时间,不得大声喧哗,不得打闹和吵架。8、建立群众来访接待处,多听取居民意见,不断改进施工方法和工作作风,防止各种扰民事件的发生。七、现场临设和围挡布置10(一)临时设施布置1、为便于管理,办公区设置2、生活区设置3、施工现场设置有警卫室、厕所、库房和封闭式垃圾站等设施。4、办公的临时设施材质系高效保温隔热的活动板房,有产品合格证,安装拆除单位具备施工资质。5.工程内杜绝存放易燃易爆材料和住人。(二)现场围挡和大门口布置1、施工现场和生活区及办公区采用封闭式管理,分别用红机砖砌筑外墙并抹灰和使用铁板围挡,围墙和围挡高度不低于2.5米。2、施工现场大门口设置在近邻公路的一侧,设警卫室。3、大门口设置有五版二图,即安全生产、消防保卫、环境保护、文明施工制度牌和印有工程名称、建筑面积、建设单位、施工单位等内容的施工标识牌及施工现场平面布置图,应急流程图。。八、职业健康与卫生防疫(一)职业健康1、从事脚手架作业的高处作业人员,需经过体检和培训,取得特种作业操作证方可进行脚手架搭设拆除作业。2、炊事员经体检后,办理
本文标题:绿色施工专项方案
链接地址:https://www.777doc.com/doc-6847140 .html