目录第一篇工程概况及搭设设计························································错误!未定义书签。一、工程概况··································································错误!未定义书签。二、编制根据··································································错误!未定义书签。三、脚手架设计:····························································错误!未定义书签。第二篇落地脚手架施工方案······················································错误!未定义书签。一、落地式脚手架搭设参数······················································错误!未定义书签。二、落地式脚手架搭计算书··························································错误!未定义书签。三、施工··············································································错误!未定义书签。1、施工准备···································································错误!未定义书签。2、搭设·········································································错误!未定义书签。四、拆除··············································································错误!未定义书签。1、拆除脚手架前准备工作应符合下列规定:·························错误!未定义书签。2、拆除脚手架时,应符合下列规定:··································错误!未定义书签。3、卸料时应符合下列规定:··············································错误!未定义书签。五、检查与验收·····································································错误!未定义书签。1、构配件检查与验收·······················································错误!未定义书签。2、脚手架检查与验收·······················································错误!未定义书签。六、安全管理········································································错误!未定义书签。第四篇验收与操作安全····························································错误!未定义书签。一、平台制作安装与拆除·························································错误!未定义书签。二、使用规定··································································错误!未定义书签。三、寻常保养········································································错误!未定义书签。四、防雷接地办法··································································错误!未定义书签。第一篇工程概况及搭设设计一、工程概况福建绿洲工业固体废物无害化处置项目地处南平。本工程分为三个单位工程,1、焚烧车间:构造层次:三层,建筑总高度:23.90米,建筑面积:2806.1;2、1#暂存库:构造层次:二层,建筑总高度:14.050米,建筑面积:2972.2;3、预解决车间构造层次:一层局部三层,建筑总高度:16.30米,建筑面积:1281.3,总建筑面积约7059.5平方米,均为钢筋混凝框架构造,某些屋面安装为钢构造,建筑安装工程费用总投资额约1400万元人民币。建设单位:监理单位:设计单位:勘察单位:施工单位:质监单位:安监单位:合同工期:建设工期为150日历天施工质量:合格原则二、编制根据1、《建筑施工扣件式钢管脚手架安全技术规范》(JGJ130-)2、《直缝电焊钢管》(GB/T13793-)3、《普通碳素构造钢》GB/T700-4、《钢管脚手架扣件》GB15831-5、《低合金高强度构造钢》GB/T1591-6、《钢筋混凝土用钢第一某些:热轧光圆钢筋》GB1499.1-三、脚手架设计:本工程有三栋楼构成其中1、焚烧车间,建筑总高度:23.90米;2、1#暂存库,建筑总高度:14.050米;3、预解决车间建筑总高度16.30米:本工程外架最高搭设高度均未超过24.00M故外架脚手架采用落地式双排脚手架搭设。详细搭设方式为:外架脚手架采用落地式双排脚手架搭设均一次性搭设至屋面并超施工层一步即可。本工程处在郊区地段,夏秋季节受台风影响严重雨水较多,需要对其进行地面硬化后,设立排水沟,进行有组织排水,以保证架体基本稳定性。由于本工程建筑构造形式类似简朴,故选用焚烧车间做为方案设计对象,别的栋号参照焚烧车间房设立即可。第二篇落地脚手架施工方案一、落地式脚手架搭设参数1.1.1立杆立杆接头除顶层顶步外,别的各层各步接头必要采用对接扣件连接,立杆与大横杆采用直角扣件连接。接头交错布置,两个相邻立柱接头避免出当前同步同跨内,并且在高度方向至少错开50cm;各接头中心距主节点距离不不不大于步距1/3。立杆在顶部搭接时,搭接长度不不大于1m,必要等间距3个旋转扣件固定,端部扣件盖板边沿至搭接纵向水平杆杆端距离不不大于100mm。1.1.2大横杆大横杆置于小横杆之下,立柱内侧,用直角扣件与立杆扣紧,采用至少6m且同一步大横杆四周要交圈。大横杆采用对接扣件连接,其接头交错布置,不在同步同跨内;相邻接头水平距离不不大于50cm,各接头距立柱距离不不不大于纵距1/3(本工程不不不大于50cm),大横杆在同一步架内纵向水平高差不超过全长1/300(本工程不超过50cm),局部高差不超过5cm。1.1.3小横杆每一立杆与大横杆相交处(主节点)都必要设立一根小横杆,并采用直角扣件扣紧在大横杆上,该杆轴线偏离主节点不不不大于15cm。小横杆间距与立杆纵距相似,且依照作业层脚手板搭设需要,在两立柱之间等距离设立1根小横杆,最大间距不超过75cm。小横杆伸出外排大横杆边沿距离不不大于10cm,伸出里排大横杆距离构造外边沿15cm。上下层小横杆在立杆处错开布置,同层相邻小横杆在立杆处相向布置。1.1.4纵、横向扫地杆纵向扫地杆采用直角扣件固定在距离底座上皮20cm立柱上,横向扫地杆则用直角扣件固定在紧靠纵向扫地杆下方立柱上。对于立杆存在较大高低差时,扫地杆错开,高处纵向扫地杆向底处延长两跨与立柱固定。1.1.5剪刀撑本工程双排落地脚手架采用剪刀撑与横向斜撑相结合方式,随立柱、纵横向水平杆同步搭设,用通长剪刀撑沿架高持续布置,所有采用单杆通长剪刀撑。剪刀撑从底部到顶部持续设立,斜杆与地面夹角在45°~60°之间(本工程所有在50°左右)。斜杆相交点处在同一条直线上,并沿架高持续布置,剪刀撑一根斜杆扣在立杆上,另一根扣在小横杆伸出端头上,两端分别用旋转扣件固定,在其中间增长2~4个扣节点。所有固定点距主节点距离不不不大于15cm。为保证剪刀撑顺直,同步充分考虑剪刀撑安全作用,剪刀撑采用对接扣件连接(保证钢管和对接扣件质量和必要寻常检查)。本工程除在每一拐角处设立横向斜撑外,中间每隔6跨设立一道。横向斜撑在同一节间,由底至顶层呈之字形持续布置,斜杆采用通长杆件,使用旋转扣件固定在与之相交立杆或横向水平杆伸出端上。1.1.6脚手板作业层脚手板两端设直径为4mm镀锌钢丝箍两道。在作业层下部加设一道水平兜网,随作业层上升,同步作业层不超过两层。首层满铺一层脚手板,以上每隔6层也需要满铺一层脚手板,并设立安全网及防护栏杆。脚手板设立在三根横向水平杆上,并在两端8cm处用直径14号镀锌钢丝箍绕2~3圈固定。脚手板应平铺、满铺、铺稳,接缝处设两根小横杆,各杆距离接缝距离均不不不大于15cm。靠墙一侧脚手板距离构造墙距离不不不大于15cm。拐角处两个方向脚手板重叠放置,避免浮现探头及空挡现象。1.1.7连墙件连墙件采用刚性连接,垂直间距为5.4m,水平间距为5.4m(连墙杆水平布置详见脚手架平面布置图)。连墙件用φ48×3.0钢管,其与脚手架连接采用直角扣件,第一道连墙件从约1.5m标高开始设立,连墙件尽量接近主节点,偏离主节点不不不大于300mm。连墙件中连墙杆尽量呈水平设立,当不能水平设立时,与脚手架连接一端应下斜连接,不得采用上斜连接;当脚手架暂时不能设立连墙件时可搭设抛撑,抛撑采用通长杆与脚手架可靠连接,与地面成45°~60°夹角。+11.00+6.00±0.00基本地面1.1.8防护设施脚手架满挂全封闭密目安全网,密目网采用1.8m×6.0m规格,用网绳绑扎在大横杆外立杆内侧。作业层安全网应高于平台1.2m,并在作业层下部挂一道水平兜网,在架内高度3.0m左右设首层平网,往上每隔6步设隔层平网,施工层随层设网。一层至四层搭起落地架二、落地式脚手架搭计算书阐明:脚手架工程一次性从一层搭设至三层(约23.90M)本计算书仅对一至三层脚手架搭设进行计算。一、参数信息:1.脚手架参数搭设尺寸为:立杆纵距为1.55米,立杆横距为1.05米,立杆步距为1.80米;计算脚手架为双排脚手架搭设高度为23.90米,立杆采用双立管;内排架距离墙长度为0.20米;小横杆在上,搭接在大横杆上小横杆根数为2;采用钢管类型为Φ48×3.0;横杆与立杆连接方式为单扣件;扣件抗滑承载力系数为0.80;连墙件采用二步三跨,竖向间距3.60米,水平间距5.40米,采用扣件连接;连墙件连接方式为双扣件;2.活荷载参数施工荷载均布参数(kN/m2):3.000;脚手架用途:构造脚手架;同步施工层数:3;3.风荷载参数基本风压为0.45,风荷载高度变化系数μz为1.25,风荷载体型系数μs为1.20;考虑风荷载4.静荷载参数每米立杆数承受构造自重原则(kN/m2):0.1248;脚手板自重原则值(kN/m2):0.350;栏杆挡脚板自重原则值(kN/m2):0.110;安全设施与安全网(kN/m2):0.005;脚手板铺设层数:3;5.地基参数地基土类型:杂填土上浇筑混凝土垫层;施工活荷载原则值(kN/m2):500.00;基本底面扩展面积(m2):0.09;基本减少系数:0.40。二、小横杆计算:小横杆按照简支梁进行强度和挠度计算,小横杆在大横杆上面。按照小横杆上面脚手板和活荷载作为均布荷载计算小横杆最大弯矩和变形。1.均布荷载值计算小横杆自重原则值:P1=0.038kN/m;脚手板荷载原则值:P2=0.350×1.000/3=0.117kN/m;活荷载原则值:Q=3.000×1.000/3=1.000kN/m;荷载计算值:q=1.2×0.038+1.2×0.117+1.4×1.000=1.586kN/m;小横杆计算简图2.强度计算最大弯矩考
本文标题:钢管脚手架专项方案打印完成
链接地址:https://www.777doc.com/doc-8761830 .html