您好,欢迎访问三七文档
当前位置:首页 > 建筑/环境 > 工程监理 > 1、钢结构厂房施工方案
稳乐汽车制动系统生产线工程钢结构厂房专项施工方案第1页共52页目录第一章工程概况··········································2第二章施工方案编制依据··································3第三章施工现场平面布置··································3第四章施工组织/人员/机具配备····························3第一节施工组织机构··································3第二节劳动力配备····································4第三节施工机具配置··································5第五章施工进度计划······································6第六章主要施工方法······································7第一节构件的制作····································7第二节基础验收······································8第三节钢柱安装······································8第四节吊车梁安装···································11第五节刚架梁和屋面系统安装·························12第六节围护结构安装·································16第七节屋面和墙体彩板安装···························16第七章钢结构吊装施工方案································23第一节构件进场与验收·······························23第二节吊装准备·····································25第三节吊装流程·····································27第四节吊装顺序····································28第五节钢构件运输··································28第六节钢柱、柱间支撑吊装方法······················28第七节屋架、托架、天窗和檩条吊装方法··············30第八节吊车梁吊装方法······························31第九节制动系统吊装方法····························32第十节施工安全措施································33第八章质量保证措施······································34第一节质量目标·····································34第二节质量管理的外部过程···························35第三节工程施工过程的质量管理·······················36第九章安全生产和文明施工································37第一部分安全生产···································37第一节安全生产管理机构·····························37第二节管理措施·····································39第三节管理细则·····································40第四节现场安全用电方案·····························41第五节高处作业安全方案·····························46第六节脚手架工程安全方案···························49第二部分文明施工···································52稳乐汽车制动系统生产线工程钢结构厂房专项施工方案第2页共52页第一章工程概况工程名称:稳乐汽车制动系统生产线工程—2#、3#厂房工程工程地址:芜湖市鸠江区经济开发区阳天路西侧建设单位:芜湖稳乐制动系统有限公司设计单位:浙江华洲国际设计有限公司勘探单位:冶金部华东勘探基础工程总公司监理单位:浙江东城建设工程监理有限公司施工总承包单位:芜湖三江建筑安装有限公司该工程2#厂房为单层轻钢结构(局部二层),建筑面积6810.30㎡,外型呈长方型,长93m,宽63m,檐口高度8.1米,室内外高差为0.20m。结构型式为变截面焊接H型钢,采用高强螺栓连接。设计基本风压:0.40KN/㎡,抗震等级:6度设防。钢结构主要构件材料:钢柱、钢梁采用Q345B中板焊接;高强螺栓采用10.9级摩擦型,材质为40Cr;刚性系杆、支撑采用Ⅰ级钢;檩条采用薄壁C型钢,材质为Q235B钢。钢结构和檩条表面防腐处理采用喷砂除锈、两度防锈底漆、两度醇酸漆。屋面采用钢网+铝箔纸+50保温棉+单层海蓝色彩钢瓦屋面、墙面采用单层白色彩钢瓦墙面。板厚0.476、0.42㎜;保温材料采用50㎜厚离心玻璃丝棉;屋面板、钢网与檩条联接采用自攻螺钉联接。该工程3#厂房为单层轻钢结构,建筑面积6086.40㎡,外型呈长方型,长93m,宽63.4m,檐口高度8.1、10m米,室内外高差为0.20m。结构型式为变截面焊接H型钢,采用高强螺栓连接。设计基本风压:0.40KN/㎡,抗震等级:6度设防。钢结构主要构件材料:钢柱、钢梁采用Q345B中板焊接;高强螺栓采用10.9级摩擦型,材质为40Cr;刚性系杆、支撑采用Ⅰ级钢;檩条采用薄壁C型钢,材质为Q235B钢。钢结构和檩条表面防腐处理采用喷砂除锈、两度防锈底漆、两度醇酸漆。屋面采用钢网+铝箔纸+50保温棉+单层海蓝色彩钢瓦屋面、墙面采用单层白色彩钢瓦墙面。板厚0.476、0.42㎜;保温材料采用50㎜厚离心玻璃丝棉;屋面板、钢网与檩条联接采用自攻螺钉联接。标高1.2米窗台墙以上墙板为920型单层白色压形钢板。稳乐汽车制动系统生产线工程钢结构厂房专项施工方案第3页共52页屋面为840型单层海蓝色压形钢板,内贴保温棉。其它工程技术细节详见设计说明和施工图。第二章施工方案编制依据工程总体施工组织设计施工图纸《钢结构工程施工质量验收规范》(GB50205-2001)《建筑钢结构焊接技术规范》(JGJ81-2001)《门式刚架轻型房屋钢结构技术规程》(CECS102:2002)《混凝土结构工程施工质量验收规范》(GB50204-2002)《钢结构施工规范》(GB50755-2012)《钢结构质量检验评定标准》(GB50221-2001)第三章施工现场平面布置施工现场平面布置详见总体施工组织设计第四章施工组织/人员/机具配备第一节施工组织机构本工程为钢结构和彩板维护工程为一体的综合性工程,施工技术比较复杂,为确保工程质量和工期目标的实现,由项目经理代表公司履行合同;组织工程的施工直到工程正式交付。项目部配有土建、测量、钢结构、焊接、等专业的工程技术人员。为顺利的完成工程施工任务,项目经理部共设置了2个钢结构施工分队,每个施工分队均有相关专业一线技术人员监督指导施工。项目经理部主要管理人员的职责分工如下:稳乐汽车制动系统生产线工程钢结构厂房专项施工方案第4页共52页项目经理:徐文元代表公司履行合同规定的责任和义务,对工程施工负全责。技术负责人:邹丰收主持施工方案、各专项作业指导书的制定并监督指导方案的执行,在施工过程中,及时指导和协调解决施工中遇到的各种技术问题,对工程的技术质量负责。生产副经理:张文献组织施工作业,根据施工现场实际情况统筹协调、调动施工机具和人力资源,科学的组织好流水施工,确保施工作业总部署有机的实施,同时也是安全生产、环境保护措施实施和文明施工的组织者和具体责任人。各施工分队长:陶庭进章贵宝各分队队长在项目生产副经理领导和指挥下,对本队的施工、安全、环保及财产保护负责。施工组织机构详见总体施工组织设计第二节劳动力配备除部分劳动力工等辅助工种雇用外来务工人员外,公司拥有强大的技术工人储备,技术工人均通过了国家有关部门进行的岗位技能鉴定,稳乐汽车制动系统生产线工程钢结构厂房专项施工方案第5页共52页持有相关专业的上岗证书,电/气焊工和起重工还持有技术质量监督局考核颁发的特种作业上岗证书。这些是劳动力投入计划得以保证的基础,而不断的对技术工人进行培训,择优上岗,按绩效考核定岗定酬是保证劳动力质量的有效措施。主要技术工种劳动力使用计划(钢结构施工)铆工8人其中技师2人,高级工2人。电焊工2人持证上岗起重工6人持证上岗气焊工2人持证上岗油漆工6人其中高级工1人。力工10人能适应高空作业。测量工2人持证上岗维护电工2人持证上岗第三节施工机具配置本工程是一个集钢结构工程和彩板维护工程为一体的综合性工程,必须投入性能可靠的专业化施工机械设备,以确保工程施工的连续性和稳定性,进而确保工程质量一次验收合格。所投入的起重机械,均在技术质量监督局登记注册,处于有效的安全性能检验周期内;所有计量和检测设备均处于有效的计量检定周期内。其它通用机械和焊接设备,其技术性能和安全可靠性均经过公司设备处专业技术人员严格的检验与试验后方可投入工程施工。稳乐汽车制动系统生产线工程钢结构厂房专项施工方案第6页共52页主要施工机械设备使用计划序号设备名称规格型号单位数量1.汽车式起重机25t辆12.汽车式起重机16t辆13.汽车式起重机8t辆14.拖板车20t辆15.载重汽车10t长箱半拖挂辆16.载重汽车1.5t辆17.半自动二氧化碳保护焊机台28.半自动氧乙炔焰切割机台29.电焊机ZD400台1010.无齿锯φ400台211.钻床φ25台112.磁力钻台113.烘干箱台214.手动压力机台115.千斤顶8t、20t台各216.倒链3t、5t台各417.扭矩扳手1000NM个818.电剪子台419.弹簧秤10kgf个120.水平仪台221.经纬仪台2第五章施工进度计划施工进度计划是按80个日历天安排的,为确保工期目标的实现,项目部还要制定详细的内控计划,争取工程提前交付。施工进度计划详见附图001。稳乐汽车制动系统生产线工程钢结构厂房专项施工方案第7页共52页项目经理要用科学发展观组织和指挥施工,及时与业主方有关负责人或监理工程师沟通,及时报告施工计划和施工进度完成情况,认真听取业主和监理工程师的指示。用PDCA循环的模式,根据各种客观条件的变化科学的制定、实时的调整中长期和近期施工计划。项目经理要及时调整人力物力资源,根据客观条件及时调整作业项目安排。第六章主要施工方法第一节构件的制作1.主要构件委托专业化钢构件厂进行工业化制作。2.主要构件(刚架柱、抗风柱和刚架梁)为焊接H型钢构件,焊接H型钢构件经校正后,外形尺寸偏差必须符合国家有关标准规范的规定(见下表)。序号项目允许偏差(mm)1.截面高度(h)h<500±2.0500≤h≤1000±3.0h>1000±4.02.截面宽度(b)±3.03.腹板中心偏移2.04.翼缘板垂直度b/1003.05.弯曲矢高l/10005.06.扭曲h/2505.07.腹板局部平面度t<143.0t≥142.03.构件预制厂家要根据国家有关标准规范和工程所在地建筑工程质量监督管理部门的规定进行有关检验与试验,并出具相关报告。4.构件出厂时制造厂家要以每个单体建筑为单元,对不同类别构件开具出厂合格证明。稳乐汽车制动系统生产线工程钢结构厂房专项施工方案第8页共52页第二节基础验收1.基本要求1)交接的基础至少是一个安装单元的全部基础。2)基础混凝土的强度至少要达到设计强度的75%。3)基础周围回填处理完毕。
本文标题:1、钢结构厂房施工方案
链接地址:https://www.777doc.com/doc-161192 .html