当前位置:首页 > 建筑/环境 > 工程监理 > 奉化绿城玫瑰园三期I标段临时用电专项施工方案
奉化绿城玫瑰园三期I标段领悟您发展的愿景交付您满意的产品1目录第一章工程概况·························3第一节、工程简介··············································································3第二章设计依据·························4第三章现场用电初步设计·····················5第一节、线路布置··············································································5第二节、设计说明··············································································6第四章负荷计算·························7第六章配电箱及共关箱·····················65第六章临时用电与管理·····················65第七章接地与防雷·······················67第八章配电线路························70第九章配电箱和开关箱·····················72第十章现场照明························75第十一章电气安全管理·····················77第十二章电防火措施······················79第十三章电器防护措施·····················83第十四章防雷设置时应注意事项·················85第十五章用电技术档案·····················86第十六章施工现场用电管理组织体系···············87附图1、施工现场用电平面布置图2、施工现场临时用电配电系统示意图奉化绿城玫瑰园三期I标段领悟您发展的愿景交付您满意的产品23、动力分配电箱内部系统装置图4、照明分电箱内部系统装置图奉化绿城玫瑰园三期I标段领悟您发展的愿景交付您满意的产品3第一章工程概况第一节、工程简介一、各方建设主体建设单位:奉化绿城房地产开发有限公司设计单位:浙江绿城建筑设计有限公司勘察单位:杭州市勘测设计研究院监理单位:杭州城市建设监理有限公司建设单位:浙江省建工集团有限责任公司二、工程概述序号内容说明1工程名称奉化绿城玫瑰园三期工程I标段2建设地点本项目位于奉化市金钟路以西、桥西岸路以北、开源路以东3建设规模I标段由2幢32层高层,地上建筑面积为46940.4㎡,地下建筑面积为11955㎡4结构层数框架剪力墙结构,地上32层,地下1层(局部2层)5承包方式包工包料总承包模式6质量要求必须确保验收合格,达到绿城精细化工作管理要求,争创“甬江杯”7安全要求达到宁波市建筑安全文明施工标化工地标准8工期要求778日历天本工程共安装2台QTZ80塔吊,主体阶段设钢筋制作场1个,木工制作场1个。施工电梯两台。奉化绿城玫瑰园三期I标段领悟您发展的愿景交付您满意的产品4第二章设计依据本方案根据下列标准编制:1.《施工现场临时用电安全技术规范》JGJ46-2005;2.《特低电压(ELV)限值》GB3805-2008;3.《建筑施工安全检查标准》JGJ59-2011;4.《通用用电设备配电设计规范》GB50055-20115.国家技术监督局《剩余电流动作保护装置安装和运行》GB13955-2005;6.国家技术监督局、建设部《建筑工程施工现场供用电安全规程》GB50194-2014;7.《建筑机械使用安全技术规程》JGJ33-2012;8.省市发布的有关建筑施工质量、安全文件;9.浙江建工集团有限公司有关安全管理、文明施工的文件;10.本工程的施工组织设计;11.业主提供的有关数据;奉化绿城玫瑰园三期I标段领悟您发展的愿景交付您满意的产品5第三章现场用电初步设计本方案主体施工阶段时设计,业主提供1个600KV电压器。第一节、线路布置根据施工用电表的实际情况、现场用电实际需求,同时考虑到保证现场施工用电的安全性、可靠性、实用性及经济性,确定本工程项目主要施工用电设置为五路供电。工程的生活区\办公区设置在业主提供的场地,临时用电由另行安装.具体如下:1线路A8#塔吊动力线路、安装在塔吊上的照明用电2线路B11#塔吊动力线路、安装在塔吊上的照明用电3线路C木工加工棚、砂浆搅拌机、钢筋车间线路4线路D8#楼人货梯及施工用电5线路E11#楼人货梯及施工用电施工平面布置,确定供电总平面图和用电系统图,具体详见附图一、用电原则采用TN-S接地、接零保护系统(三相五线制)。采用三级漏电保护系统奉化绿城玫瑰园三期I标段领悟您发展的愿景交付您满意的产品6采用三级配电形式配电主线路沿基坑外围布置,采用电缆沟埋地敷设,其余车间、用电明线均采用PVC套管。规范配电装置和使用。规范电动建筑机械的安全装置和使用条件。第二节、设计说明1、施工用电按规范用TN——S低压供电系统。2、现场施工用电的设备较多,设备之间的容量相差较大,为简化计算,按需要系数法计算,需要系数是估计值。3、通过正确计算,合理分布负荷,使三相均衡。4、根据供电负荷容量及分布情况,使变压器配电房尽量靠近负荷中心。5、合理进行补偿,提高功率因素。奉化绿城玫瑰园三期I标段领悟您发展的愿景交付您满意的产品7第四章负荷计算1、施工机具序号机械名称型号规格数量额定功率(KW)总荷载1固定式塔吊ZJ6012248962施工电梯SCD200/200220403砼搅拌机JZM35027.5154砂浆机VJ2002365钢筋切断机GQ-40A2366钢筋弯曲机GW-40A2367钢筋调直机GJ4/42368木工平板刨MB503248奉化绿城玫瑰园三期I标段领悟您发展的愿景交付您满意的产品89木工圆盘锯MJ16025.51110木工轧刨机MB104CD24811插入式振动器ZN70C151.522.512平板式振动器ZW41.5613电冲击钻回Z1J型50.432.1514砂浆搅拌机HJ-200A23.436.8615涂料搅拌器SHD-38A200.901816套丝机7S-Ø10041.5617电动试压泵SY-35042818手电钻Φ6-Φ1240.10.419切割机SQ-50045.52220磨光机51101140.62.4奉化绿城玫瑰园三期I标段领悟您发展的愿景交付您满意的产品921割管机GD42.28.823液压弯管机WG-63--22手拉葫芦3T5--23无线对讲机MOTOLO20--24塔吊大灯43242、供电系统设置总配电箱线路B1号动力分箱固定式塔吊开关箱固定式塔吊2号照明分箱高压汞灯开关箱高压汞灯线路C3号动力分箱固定式塔吊开关箱固定式塔吊4号照明分箱高压汞灯开关箱高压汞灯奉化绿城玫瑰园三期I标段领悟您发展的愿景交付您满意的产品10线路E5号动力分箱木工平刨床开关箱木工平刨床木工圆锯开关箱木工圆锯木工轧刨机开关箱木工轧刨机砂浆搅拌机开关箱砂浆搅拌机钢筋弯曲机开关箱钢筋弯曲机钢筋切断机开关箱钢筋切断机钢筋调直机开关箱钢筋调直机套丝机开关箱套丝机6号照明分箱白炽灯开关箱白炽灯白炽灯开关箱白炽灯白炽灯开关箱白炽灯奉化绿城玫瑰园三期I标段领悟您发展的愿景交付您满意的产品11线路G9号动力分箱施工升降机开关箱施工升降机砂浆搅拌机开关箱砂浆搅拌机交流电焊机开关箱交流电焊机10号照明分箱碘钨灯2开关箱碘钨灯2线路H11号动力分箱施工升降机开关箱施工升降机交流电焊机开关箱交流电焊机12号照明分箱碘钨灯2开关箱碘钨灯2二、设计内容和步骤1、现场勘探及初步设计:(1)本工程所在施工现场范围内施工前无各种埋地管线。(2)现场采用380V低压供电,设一配电总箱,内有计量设备,采用TN-S系统供电。奉化绿城玫瑰园三期I标段领悟您发展的愿景交付您满意的产品12(3)根据施工现场用电设备布置情况,总箱进线采用导线空气明敷/架空线路敷设,干线采用直接埋地敷设,用电器导线采用直接埋地敷设。布置位置及线路走向参见临时配电系统图及现场平面图,采用三级配电,三级防护。(4)按照《JGJ46-2005》规定制定施工组织设计,接地电阻R≤4Ω。2、确定用电负荷:(1)、固定式塔吊Kx=0.8,Cosφ=0.75,tgφ=0.88将Jc=40%统一换算到Jc1=25%的额定容量Pn=48kWPe=n×(Jc/Jc1)1/2×Pn=1×(0.4/0.25)1/2×48=60.72kWPjs=Kx×Pe=0.8×60.72=48.57kWQjs=Pjs×tgφ=48.57×0.88=42.84kvar(2)、高压汞灯Kx=0.6,Cosφ=0.7,tgφ=1.02Pjs=0.6×6×1.1=3.96kWQjs=Pjs×tgφ=3.96×1.02=4.04kvar奉化绿城玫瑰园三期I标段领悟您发展的愿景交付您满意的产品13(3)、固定式塔吊Kx=0.7,Cosφ=0.65,tgφ=1.17将Jc=40%统一换算到Jc1=25%的额定容量Pn=48kWPe=n×(Jc/Jc1)1/2×Pn=1×(0.4/0.25)1/2×48=60.72kWPjs=Kx×Pe=0.7×60.72=42.5kWQjs=Pjs×tgφ=42.5×1.17=49.69kvar(4)、高压汞灯Kx=0.6,Cosφ=0.7,tgφ=1.02Pjs=0.6×6×1.1=3.96kWQjs=Pjs×tgφ=3.96×1.02=4.04kvar(5)、木工平刨床Kx=0.65,Cosφ=0.6,tgφ=1.33Pjs=0.65×6=3.9kWQjs=Pjs×tgφ=3.9×1.33=5.2kvar奉化绿城玫瑰园三期I标段领悟您发展的愿景交付您满意的产品14(6)、木工圆锯Kx=0.65,Cosφ=0.6,tgφ=1.33Pjs=0.65×11=7.15kWQjs=Pjs×tgφ=7.15×1.33=9.53kvar(7)、木工轧刨机Kx=0.65,Cosφ=0.6,tgφ=1.33Pjs=0.65×8=5.2kWQjs=Pjs×tgφ=5.2×1.33=6.93kvar(8)、砂浆搅拌机Kx=0.75,Cosφ=0.85,tgφ=0.62Pjs=0.75×6.86=5.145kWQjs=Pjs×tgφ=5.15×0.62=3.19kvar(9)、钢筋弯曲机Kx=0.2,Cosφ=0.65,tgφ=1.17Pjs=0.2×6=1.2kW奉化绿城玫瑰园三期I标段领悟您发展的愿景交付您满意的产品15Qjs=Pjs×tgφ=1.2×1.17=1.4kvar(10)、钢筋切断机Kx=0.65,Cosφ=0.7,tgφ=1.02Pjs=0.65×6=3.9kWQjs=Pjs×tgφ=3.9×1.02=3.98kvar(11)、钢筋调直机Kx=0.2,Cosφ=0.65,tgφ=1.17Pjs=0.2×6=1.2kWQjs=Pjs×tgφ=1.2×1.17=1.4kvar(12)、套丝机Kx=0.3,Cosφ=0.65,tgφ=1.17Pjs=0.3×6=1.8kWQjs=Pjs×tgφ=1.8×1.17=2.1kvar(13)、白炽灯Kx=1,Cosφ=1,tgφ=0奉化绿城玫瑰园三期I标段领悟您发展的愿景交付您满意的产品16Pjs=1×0.1×1=0.1kWQjs=Pjs×tgφ=0.1×0=0kvar(14)、白炽灯Kx=1,Cosφ=1,tgφ=0Pjs=1×0.1×1=0.1kWQjs=Pjs×tgφ=0.1×0=0kvar(15)、白炽灯Kx=0.9,Cosφ=0.9,tgφ=0.48Pjs=0.9×1×1=0.9kWQjs=Pjs×tgφ=0.9×0.48=0.44kvar(16)、施工升降机Kx=0.3,Cosφ=0.6,tgφ=1.33Pjs=0.3×20=6kWQjs=Pjs×tgφ=6×
本文标题:奉化绿城玫瑰园三期I标段临时用电专项施工方案
链接地址:https://www.777doc.com/doc-178678 .html