您好,欢迎访问三七文档
当前位置:首页 > 建筑/环境 > 工程监理 > 工字钢悬挑脚手架施工方案(专家会审版)
1目录一、编制依据·············································1二、工程概况·············································1三、总体筹划及施工部署···································21、总体筹划··········································22、安全领导小组······································4四、搭设流程及施工工艺···································4五、材料选择及构造要求···································15六、劳动力安排···········································16七、脚手架检查与验收·····································171、构配件检查与验收··································172、脚手架检查与验收··································18八、脚手架施工安全保证措施·······························191、组织保障··········································192、技术措施··········································223、监测监控··········································23九、应急预案·············································25十、型钢悬挑脚手架计算书·································272型钢悬挑脚手架专项施工方案一、编制依据1、民兴·瑞丰园商住楼施工设计图纸;2、民兴·瑞丰园商住楼施工组织设计;3、各类参考规范、图书:《建筑施工组织设计规范》GB/T50502-2009《建筑施工脚手架实用手册》《建筑结构荷载规范》GB50009-2012《混凝土结构设计规范》GB50010-2010《钢结构设计规范》GB50017-2011《建筑施工安全检查标准》JGJ59-2011《建筑施工高处作业安全技术规范》JGJ80-91《建筑施工扣件式钢管脚手架安全技术规范》JGJ130-2011危险性较大的分部分项工程安全管理办法(建质[2009]87号文)二、工程概况工程基本情况工程名称民兴·瑞丰园商住楼工程地点黄石港区武汉路308#建筑面积(m2)29522.62建筑高度(m)81.17基础形式人工挖孔桩主体结构框剪抗震等级3抗震设防烈度6地上层数26地下层数1标准层层高2.9m标准层楼板厚度120mm标准层结构混凝土强度梁、板C25各责任主体名称3建设单位湖北民兴置业有限公司设计单位黄石市佳境建设设计有限公司施工单位大冶建工集团有限责任公司监理单位湖北华泰工程建设监理有限公司项目经理梁勋刚总监理工程师尹贵炘技术负责人梁勋猛专业监理工程师高开元本工程为湖北民兴置业有限公司开发建设的民兴·瑞丰园商住楼工程,位于黄石市武汉路308号。建设单位为湖北民兴置业有限公司;设计单位为黄石佳境建筑设计有限公司;监理单位为湖北华泰工程建设监理有限公司;施工单位为大冶建工集团有限责任公司。民兴·瑞丰园商住楼建筑高度为81.17m,地下1层,地上26层,1层层高5.1m,2层层高4.5m,3层层高4.9m,4-26层为标准层层高2.9m。三、总体筹划及施工部署(一)、总体筹划本工程考虑到施工工期、质量、安全和合同要求,故在选择方案时,应充分考虑以下几点:1、架体的结构设计,力求做到结构要安全可靠,造价经济合理。2、在规定的条件下和规定的使用期限内,能够充分满足预期的安全性和耐久性。3、选用材料时,力求做到常见通用、可周转利用,便于保养维修。4、结构选型时,力求做到受力明确,构造措施到位,升降搭拆方便,便于检查验收;5、综合以上几点,脚手架的搭设,还必须符合JCJ59-2011等检查标准要求,要符合相关文明标化工地的有关标准。6、结合以上脚手架设计原则,同时结合本工程的实际情况,综合考虑了以往的施工经验,决定采用的脚手架方案为:本工程为普通型钢悬挑脚手架,分三段悬挑,第一段5层楼面~13层楼面,共23.2m;第二道悬挑为13层楼面~21层楼面,共23.2m;第三段悬挑为21层~屋面,共22.5m.7、在悬挑脚手架计算时,将9#楼第二段悬挑层(13层楼面~21层楼面)悬挑高度为23.2m,作为计算参考依据(具体布置见型钢平面布置图)。4(二)、安全领导小组搭设过程中,因处在施工高峰期,各施工班组在交叉作业中,故应加强安全监控力度,现场设定若干名安全监控员。水平和垂直材料运输必须设置临时警戒区域,用红白三角小旗围栏。谨防非施工人员进入。同时成立以项目经理为组长的安全领导小组以加强现场安全防护工作,本小组机构组成、人员编制及责任分工如下:梁勋刚(项目负责人)——组长,负责协调指挥工作;梁勋猛(技术负责人)——副组长,负责现场施工指挥,技术交底;曹祥权(施工员)——组员,负责现场施工指挥;梁玮(安全员)——组员,负责现场安全检查工作;张家坊(架子工班长)——组员,负责现场具体施工;四、搭设流程及施工工艺普通型钢悬挑脚手架施工准备→放线定位→预埋U型钢筋拉环或锚固螺栓→悬挑架的支承结构安装→竖立杆→将纵向扫地杆与立杆扣接→安装横向扫地杆→安装纵向水平杆→安装横向水平杆→安装连墙件→安装剪刀撑→挂安全网→作业层铺脚手板和挡脚板。搭设参数表:5脚手架排数双排大小横杆布置小横杆在上搭设高度(m)21立杆型号Φ48×3.5立杆纵距(m)1.5立杆横距(m)0.65内排架距离墙长度0.25立杆步距(m)1.8连墙件布置方式二步三跨型钢悬挑长度(m)1.2锚固长度(m)3.3钢丝绳支撑道数1施工均布荷载(kN/m2)3同时施工层数2脚手板铺设层数2地区黄石市基本风压(kN/m2)0.351、型钢水平悬挑梁(1)型钢水平悬挑梁必须保证有足够的锚固强度和截面抗屈曲能力,型钢水平悬挑梁的纵向间距与上部脚手架立杆的纵向间距相同,立杆直接支承在悬挑梁上。上部脚手架立杆与挑梁支承结构应有可靠固定的定位点,以确保上部架体的稳定,定位点离悬挑梁端部不小于100mm。通常采用在型钢上焊接150-200mm、外径φ40mm的钢管固定柱,立杆套座其外,并同时在立杆下部设置扫地杆。见下图6(2)型钢水平悬挑梁宜采用双轴对称截面的型钢。悬挑钢梁型号及锚固件应按设计确定,钢梁截面高度为160mm。悬挑梁尾端应在两处及以上固定于钢筋混凝土梁板结构上。锚固型钢悬挑梁的U型钢筋拉环或锚固螺栓直径为16㎜。用于锚固的U型钢筋拉环或螺栓应采用冷弯成型。U型钢筋拉环、锚固螺栓与型钢间隙应用钢楔或硬木楔楔紧。型钢悬挑梁外端设置钢丝绳与上一层建筑结构斜拉结。钢丝绳不参与悬挑钢梁受力计算;钢丝绳与建筑结构拉结的吊环应使用HPB235级钢筋,其直径为20㎜,吊环预埋锚固长度应符合现行国家标准《混凝土结构设计规范》GB50010中钢筋锚固的规定。(3)悬挑钢梁悬挑长度应按设计确定,固定段长度不应小于悬挑段长度的1.25倍。型钢悬挑梁固定端应采用2个(对)及以上U型钢筋拉环或锚固螺栓与建筑结构梁板固定,U型钢筋拉环或锚固螺栓应预埋至混凝土梁、板底层钢筋位置,并应与混凝土梁、板底层钢筋焊接或绑扎牢固,其锚固长度应符合现行国家标准《混凝土结构设计规范》GB50010中钢筋锚固的规定。(4)型钢悬挑梁与建筑结构采用螺栓角钢压板连接,角钢的规格为63mm×63mm×6mm。7型钢悬挑脚手架构造图1——钢丝绳或钢拉杆悬挑钢梁U型螺栓固定构造图81——木楔侧向楔紧;2——两根1.5m长直径18mmHRB335钢筋悬挑钢梁穿墙构造图1——木楔楔紧悬挑钢梁楼面构造图2、立杆(1)脚手架立杆采用对接接长,立杆的对接扣件应交错布置,两根相邻立杆的接头不应设置在同步内,同步内隔一根立杆的两个相隔接头在高度方向错开的距离不宜小于500㎜;各接头中心至主节点的距离不宜大于步距的1/3。(2)脚手架立杆顶端栏杆宜高出女儿墙上端1m,宜高出檐口上端1.5m。3、脚手架纵向水平杆、横向水平杆、脚手板(1)纵向水平杆的构造应符合下列规定:1、纵向水平杆应设置在立杆内侧,单根杆长度不应小于3跨;2、纵向水平杆接长应采用对接扣件连接或搭接,并应符合下列规定:1)两根相邻纵向水平杆的接头不应设置在同步或同跨内;不同步或不同跨两个相邻接头在水平方向错开的距离不应小于500mm;各接头中心至最近主节点的距离不应大于纵距的1/3(见下图)9(a)接头不在同步内(立面)(b)接头不在同跨内(平面)纵向水平杆对接接头布置1——立杆;2——纵向水平杆;3——横向水平杆2)搭接长度不应小于1m,应等间距设置3个旋转扣件固定;端部扣件盖板边缘至搭接纵向水平杆杆端的距离不应小于100mm。3、使用竹串片脚手板时,纵向水平杆应作为横向水平杆的支座,用直角扣件固定在立杆上。铺竹串片脚手板时纵向水平杆的构造1——立杆;2——纵向水平杆;3——横向水平杆;4——竹串片脚手板;5——其它脚手板(2)横向水平杆的构造应符合下列规定:1、作业层上非主节点处的横向水平杆,宜根据支承脚手板的需要等间距设置,最大间距不应大于纵距的1/2;102、使用竹串片脚手板时,双排脚手架的横向水平杆两端均应采用直角扣件固定在纵向水平杆上。(三)主节点处必须设置一根横向水平杆,用直角扣件扣接且严禁拆除。(四)脚手板的设置应符合下列规定:1、作业层脚手板应铺满、铺稳、铺实;2、竹串片脚手板应设置在三根横向水平杆上。脚手板的铺设应采用对接平铺或搭接铺设。脚手板对接平铺时,接头处应设两根横向水平杆,脚手板外伸长度应取130mm~150mm,两块脚手板外伸长度的和不应大于300mm(图a);脚手板搭接铺设时,接头应支在横向水平杆上,搭接长度不应小于200mm,其伸出横向水平杆的长度不应小于100mm(图b)。(a)脚手板对接(b)脚手板搭接脚手板对接、搭接构造3、作业层端部脚手板探头长度应取150mm,其板的两端均应固定于支承杆件上。4、剪刀撑(一)悬挑脚手架应在外侧全立面连续设置剪刀撑。(二)剪刀撑的设置应符合下列规定:1、每道剪刀撑跨越立杆的根数不小于4跨,且不小于6m,斜杆与地面的倾角应在450~600之间;剪刀撑跨越立杆的最多根数剪刀撑斜杆与地面的倾角a450500600剪刀撑跨越立杆的最多根数n7652、剪刀撑斜杆的接长应采用搭接,搭接长度不小于1m,并采用不少于2个旋转扣件固定。端部扣件盖板的边缘至杆端距离不小于100mm。113、剪刀撑斜杆应用旋转扣件固定在与之相交的横向水平杆的伸出端或立杆上,旋转扣件中心线至主节点的距离不应大于150mm。5、连墙件(一)脚手架连墙件设置的位置、数量应按专项施工方案确定。(二)连墙件的布置应符合下列规定:1、应靠近主节点设置,偏离主节点的距离不应大于300mm;2、应从底层第一步纵向水平杆处开始设置,当该处设置有困难时,应采用其它可靠措施固定;3、应优先采用菱形布置,或采用方形、矩形布置。(三)连墙件中的连墙杆应呈水平设置,当不能水平设置时,应向脚手架一端下斜连接。(四)连墙件必须采用可承受拉力和压力的构造,采用刚性连墙件与建筑物连接。6、防护栏杆(1)脚手架外侧使用建设主管部门认证的质量合格绿色密目式安全网封闭,且将安全网固定在脚手架外立杆里侧。(2)选用18#铅丝张挂安全网,要求严密、平整。(3)脚手架外侧必须设1.2m高的防护栏杆和30cm高踢脚杆,顶排防护栏杆不少于2道,高度分别为0.9m和1.3m。(4)脚手架内侧形成临边的(如遇大开间门窗洞等),在脚手架内侧设1.2m的防护栏杆和30cm高踢脚杆。12
本文标题:工字钢悬挑脚手架施工方案(专家会审版)
链接地址:https://www.777doc.com/doc-180958 .html