您好,欢迎访问三七文档
莆炎高速三明段YA8合同段(K355+300-K366+000)路基施工方案编制人:审核人:审批人:中交第二公路工程局有限公司莆炎高速三明段YA8标项目经理部二〇一八年一月目录第一章编制依据及原则________________________________11.1编制依据______________________________________11.2编制原则______________________________________1第二章工程建设条件__________________________________32.1工程概况______________________________________32.2技术标准______________________________________32.3自然条件______________________________________42.3.1地形地貌________________________________42.3.2地质条件________________________________42.3.3气候条件________________________________42.3.4水文条件________________________________5第三章总体布置及工期安排____________________________63.1施工总平面布置________________________________63.1.1施工区段划分_____________________________63.1.2施工便道_________________________________63.1.3弃土场___________________________________73.2施工进度安排__________________________________83.3施工进度安排__________________________________83.4拟投入主要设备及人员__________________________8第四章施工技术方案_________________________________124.1施工准备_____________________________________124.1.1施工测量________________________________124.1.2调查与实验______________________________134.1.3清理场地及拆除工程______________________134.1.4其他___________________________________144.1.5熟悉设计文件____________________________144.2基底处理_____________________________________154.2.1一般基底处理____________________________154.2.2软弱地基处理____________________________154.2.3换填处理________________________________154.3冲击碾压_____________________________________164.4土工格栅施工_________________________________174.5铺筑填方试验段_______________________________194.6填土路堤施工_________________________________204.6.1施工流程________________________________204.6.2施工工艺________________________________214.7土石混填施工_________________________________244.7.1施工准备________________________________244.7.2施工流程________________________________264.7.3施工方法________________________________264.8填石路堤施工_________________________________294.8.1填筑流程________________________________304.8.2填筑工艺________________________________304.8.3施工注意事项____________________________324.8.4路堤施工质量标准________________________334.9土(土石)方路堑施工_________________________344.9.1施工流程________________________________344.9.2施工方法________________________________354.9.3施工注意事项____________________________364.10石方路堑施工________________________________374.10.1施工流程_______________________________374.10.2施工方法_______________________________384.11支挡工程施工________________________________434.11.1挡土墙施工_____________________________434.11.2桩板墙施工_____________________________484.12坡面防护及排水______________________________534.12.1锚索(杆)(杆)框架施工_______________544.12.2客土喷播植草、拱形骨架植草灌、TBS植草灌634.12.3浆砌预制块拱形骨架护坡施工_____________684.12.4路基排水_______________________________694.12.5施工安全注意事项_______________________734.13桥台台背处理________________________________754.14零填(低填)浅挖处理________________________764.15高填路堤____________________________________774.16高填深挖路基变形与稳定检测__________________77第五章质量管理_____________________________________805.1质量管理_____________________________________805.2质量体系_____________________________________805.3制度保证措施_________________________________815.4路基施工质量保证措施_________________________84第六章安全管理_____________________________________866.1安全目标_____________________________________866.2安全体系_____________________________________866.3制度保证措施_________________________________876.4路基施工安全保证措施_________________________886.4.1路基施工________________________________886.4.2用电及劳动保护措施______________________896.4.3雨季施工安全保证措施____________________896.4.4突发事件应急措施________________________906.4.5治安消防措施____________________________926.4.6安全应急救援预案________________________94第七章环境保护措施_________________________________977.1路基施工环境保护措施_________________________977.2文物保护措施_________________________________97第1页路基施工方案第一章编制依据及原则1.1编制依据(1)莆炎高速三明段YA8标《两阶段施工图设计》;(2)《福建省高速公路施工标准化管理指南》(3)我国现行公路、桥涵工程施工规范及质量检验评定标准:《公路桥涵施工技术规范》(JTGF50/1-2011)。《公路工程质量检验评定标准》(JTGF80/1-2004)。《公路路基施工技术规范》(JTGF10-2006)《公路土工试验规程》(JTJE40-2007)《公路工程施工安全技术规程》(JTGF90-2015)《爆破安全规程》(GB6722-2014)1.2编制原则(1)坚持科学性、先进性、经济性、合理性与实用性相结合的原则结合本工程特点,采用先进的施工技术,采用科学的组织方法,合理地安排施工顺序、优化施工方案。做好劳动力、物资、机械的合理配置,推广“四新”技术,采用国内外可靠、先进的施工方法和施工工艺,力求施工方案的适用性、先进性相结合,做到施工方案科学合理、技术先进,确保实现设计目标。(2)百年大计、质量第一的原则第2页要求工程达到高平顺性、高稳定性和耐久性,必须坚持质量第一的原则。确立质量目标,制定创优规划,严格执行ISO9001质量标准,确保每个检验批、分项工程的质量达到优质工程标准的要求,健全质量保证体系,保证实现质量国际一流的目标。(3)保证工期的原则本工程工期紧,质量标准高,必须保证足够的技术装备和人员投入,采用机械化施工,合理安排施工工序,合理安排人员、材料和机械设备,优化资源配置。充分考虑气候、季节及交叉施工作业对工期的影响,采取相应措施,以一流的管理,确保合同工期。(4)坚持专业化作业与综合管理相结合的原则充分发挥专业人员和专用设备的优势,综合管理,合理调配,采用先进的施工技术,科学安排各项施工程序,超前计划,合理安排工序衔接。运用网络施工管理技术,组织连续、均衡、有序地施工。(5)安全生产,预防为主的原则运用现代科学技术,采用先进可靠的安全预防措施,确保施工生产和人身安全。(6)文明施工、环境保护的原则实行文明施工,重视环境保护,珍惜土地,合理利用。严格遵照国家环保政策和建设单位对本工程环境保护的要求,精心组织、严格管理、文明施工,在方案的编制上力争把施工对周围环境的影响降低到最低限度,并制定出详细的文明施工和环保措施,争创“安全生产、文明施工、标准化工地”。第3页第二章工程建设条件2.1工程概况莆炎高速三明段YA8标全长10.7km,起止桩号K355+300~K366+000,地处三明市建宁县,主线共设置大桥9座,长2928米;隧道两座,其中张家坊隧道为长隧道,左线长2395米,右线长2391米;大佛岭1号隧道为中长隧道,左线长547米,右线长500米;主线涵洞12道,跨线机耕天桥1座;路基挖方195万方,填方103万方。本标段路基横断面采用整体式和分离式两种,整体式路基总宽度26米:中间带宽度3.5米(中央分隔带2.0米+路缘带2*0.75米),行车道2*2*3.75米,外侧路缘带及硬路肩宽度2*3.0米,土路肩宽度2*0.75米。分离式路基单幅宽度为13米,其中:行车道宽度2*3.75米;左侧硬路肩宽度1米;右侧硬路肩宽度3米;土路肩宽度2*0.75米。2.2技术标准公
本文标题:路基施工方案
链接地址:https://www.777doc.com/doc-1847820 .html