新津总承包项目部第一分部新津县城市干道维修改造示范区建设项目电厂沟桥右幅桩基施工方案编制:审核:审批:日期:新津总承包项目部第一分部目录1编制依据....................................................12工程概况....................................................22.1工程概述.................................................22.2气象条件.................................................52.3水文条件.................................................52.4工程地质.................................................53施工方法....................................................73.1施工工艺流程图...........................................73.2施工工期计划.............................................83.3施工前准备工作...........................................93.4冲孔灌注桩施工..........................................113.4.1冲击钻机就位与调试...................................113.4.2冲击钻孔............................................123.4.3清孔................................................133.4.4验孔................................................133.5钢筋施工................................................143.5.1概述................................................143.5.2钢筋笼加工..........................................143.5.3钢筋笼吊装...........................................163.6混凝土施工..............................................183.6.1导管下放............................................183.6.2混凝土灌注..........................................193.7桩基检测................................................213.8主要措施工程数量........................................213.9钻孔桩施工常见问题预防及处理............................233.9.1钻孔施工常见问题的预防及处理.........................234资源配置...................................................274.1人力资源配置............................................274.2机械设备配置............................................284.3主要工程材料............................................295.质量管理措施...............................................305.1质量管理组织机构........................................305.2质量管理制度............................................315.3质量保证措施............................................326安全管理措施...............................................336.1安全管理组织机构........................................336.2安全管理制度............................................337施工安全控制...............................................347.1安全目标................................................347.2主要危险源..............................................347.2.1钢筋加工及安装施工安全措施..........................357.2.2施工用电安全措施.....................................357.2.3起重作业安全措施....................................367.2.4夜间施工作业安全措施.................................377.2.5雨季施工安全措施....................................378应急响应...................................................378.1应急启动条件和分级......................................378.2响应程序................................................388.3应急结束................................................388.4应急救援联络通信录......................................388.4.1应急资源保障.........................................398.4.2医院及紧急联系联系电话...............................398.5各类事故的处置程序和抢险措施............................408.5.1触电事故的抢险措施...................................408.5.2高处坠落及物体打击事故的抢险措施.....................408.5.3坍塌事故的抢险措施...................................418.5.4机械伤害事故的抢险措施...............................418.5.5火灾事故的抢险措施...................................419环境保护、文明施工及各方协调................................419.1环境保护................................................419.2文明施工................................................429.3各方协调................................................429.3.1协调工作涉及到的单位或人员...........................429.3.2协调措施............................................43-1-1编制依据《成都市建筑工程深基坑施工管理办法》(成都市建设委员会,2009.07);《成都地区基坑工程安全技术规范》(DB51/T5072-2011);《关于进一步加强我市建筑基坑安全管理工作的通知》(成建安监发[2011]22号文);《关于进一步加强我市建筑基坑安全管理工作的通知》(成建安监发[2012]37号文);《建筑基坑支护技术规程》(JGJ/120-99);《建筑基坑工程监测技术规范》(GB50497-2009);《施工现场临时用电安全技术规范》(JGJ46-2005);《建筑机械使用安全技术规程》(JGJ33-2001);《建筑地基基础技术规范》DBJ13-07-2006;《工程测量规范》GB50026-2007;《建筑边坡工程技术规范》GB50330-2002;《建筑基坑工程监测技术规范》GB50497-2009;《建筑变形测量规程》(JGJ/T8-97);《建筑基坑工程技术规范》(YB9258-97);《混凝土结构设计规范》(GB50010-2010);《建筑地基基础工程施工质量验收规范》(GB50202-2002);《建筑桩基技术规范》(JGJ94-2008);《建筑施工安全检查标准》(JGJ59-99);《锚杆喷射混凝土支护技术规范》(GB50086-2001);《关于印发《危险性较大的分部分项工程安全管理办法》的通知》(建质[2009]87号);《建设北路北延线(蜀龙路五期)工程下穿框架桥及船槽及船槽岩土工程勘察报告》;《成都市建设北路北延线(蜀龙路五期)工程项目施工图设计路基及船槽工程》(中铁二院工程集团有限责任公司)。-2-2工程概况2.1工程概述新津县地处四川盆地西部、成都南部,位于成都向南发展主轴线上,东连双流,西接邛崃、大邑,南邻彭山,北毗崇州,距成都市区28公里,距西南航空港18公里,区位优势明显,有“成都南大门”之称,是天府新区战略新兴产业功能区,成都市重要的物流基地,以新材料为主导的卫星城。其地理位置见图2.1-1。图2.1-1新津县地理位置随着成都市成为“西部之心、休闲之都”,以及成都南部新城的崛起,新津面临前所未有的发展机遇,但城区基础设施年代久远,与新津县战略定位不符,急需进行提升改造。本项目四川成都新津县环城生态带(东部)建设项目等7个项目是成都市新津县近年来最大规模的城区升级改造项目,包含市政道路、桥梁、风景园林、河道疏浚、生态整治等类型。本项目涵盖施工内容多、涉及施工工作面广、地方政府重视程度高、地方百姓关注程度高、地方沟通协调工作杂。-3-该工程是新津县环城生态带(东部)建设项目等7个项目之一的城市干道维修改造示范区建设项目的一部分,起点为金三角交叉口路口,终点西创大道交叉路口。项目在跨越电厂沟处设置桥梁一座。该桥为既有桥梁拓宽改造,老桥桥梁宽度约为17.7m,孔跨布置为(1×20)m,桥梁上部结构采用T梁,下部采用重力式桥台,桥位处规划红线宽度40m,桥梁需加宽约22.3m,其中左幅加宽约10.3m,右幅加宽约为12m。与此同时,原有老桥因不满足现行荷载要求,需进行加固处理。该工程为城市主干道升级改造工程,其地理位置见图2.1-2、图2.1-3。图2.1-2本项目地理位置图2.1-3电厂沟桥地理位置综上,本工程包含三个部分:新建左幅框架桥(见图2.1-4)、新建右幅加宽桥梁、既有老桥加固。其中右幅桥梁上部采用现浇钢筋混凝土箱梁,桥台采用桩柱式桥台,基础为桩基础,两侧各3根共计6根,单桩直径均为φ1.1m,桩长17m-17.5m,-4-桩间距为5m。桩顶
本文标题:电厂沟桥桩基施工方案0409
链接地址:https://www.777doc.com/doc-201402 .html