延吴高速孙岔隧道切割施工方案河北栋梁砼切割技术有限公司2013年7月9日煤矿巷道切割改造施工方案协议-2-目录一、工程概况·····································································3二、服务与照管··································································3三、施工部署·····································································41、项目管理机构的组建························································42、项目管理人员配置表························································43、施工劳动力配置计划························································54、主要施工机械、设备、材料配置计划···································55、施工临时用水、用电准备··················································6四、工程造价及结算方式······················································6五、拆除施工方案·······························································81、工程特点分析及整体拆除方案:·········································82、拆除作业工序:······························································8六、质量保证措施·····························································10七、安全管理措施·····························································101、安全管理方针、目标·······················································112、安全教育制度································································113、安全管理制度·······························································124、安全防护措施·······························································125、消防措施·····································································14煤矿巷道切割改造施工方案协议-3-八、环境保护与文明施工措施··············································151、降尘措施·····································································152、降低噪音措施·······························································163、渣土清运措施·······························································164、文明施工措施·······························································175、环境卫生措施·······························································18煤矿巷道切割改造施工方案协议-4-一、工程概况工程名称:隧道切割拆除工程项目工程地点:陕西省延安施工内容:隧道巷道改造静力切割拆卸二、服务与照管该项目位于陕西省延安,我们严格执行各项管理制度,和环境、安全保护措施,保证施工安全和避免环境污染。措施如下:1、不断与甲方领导及负责人沟通,随时接受甲方领导对施工的指导与建议,并对错误之处及时改进。2、领会甲方对于本工程的安全技术交底,并执行甲方规定的各项规章制度。3、按照规定的时间施工,并采取可行的技术措施,减小施工时产生的震动、噪音、扬尘污染。4、遵守工地有关制度,按照规定时间施工。三、施工部署1、项目管理机构的组建由于本工程位置特殊对施工技术、安全、质量方面的要求高。我公司将委派经验丰富的工程技术人员,以及施工管理人员组成项目管理机构。根据工程特点,合理组织施工。煤矿巷道切割改造施工方案协议-5-2、项目管理人员配置表序号职务人数职能1项目经理1项目负责人2施工经理2施工负责人3后勤主管1物资供应4安全员1安全负责人3、施工劳动力配置计划根据本工程的实际工程量、施工难度特点,经技术论证,拟投入如下技术工种和施工人员如下表:施工劳动力配置表序号工种机械数量班组人数/每班总人数1切割施工组长5台2122切割施工工人5台33123液压分裂机工人41884钻孔技术工2台1225液压钻机2台1246合计18人4、主要施工机械、设备、材料配置计划根据本工程的实际工程量、难度特点,经技术论证,拟投入如下设备及相关耗材:机械、设备及主要施工材料配置表煤矿巷道切割改造施工方案协议-6-序号设备名称单位数量备注1绳锯切割机台4切割设备2碟片式切割机台4用于横向切割分块3工程钻机台5钻穿金刚石孔4水泵台2施工供水设备11液压分裂机套3切割后分裂卸块设备12绳锯机头套4切割设备配套器材13绳锯液压钳台2绳锯切割设备5、施工临时用水、用电准备(1)施工用电:切割作业需要使用380伏三相电源。可根据现场配电箱情况接出满足切割设备作业所需的电源,为切割设备提供动力电源。(2)施工用水:切割作业需要用水。可根据附近的水源接点情况用自备水管引导水源。四、施工计划进程安排1、在切割进行前对特殊位置进行支撑加固.进行分段放线确定切割位.煤矿巷道切割改造施工方案协议-7-置.横向向前掘进切割1.5米拆卸后待加固完成后方可进行下一步切割.避免交叉作业.积极的配合甲方管理人员的管理.有计划的保证安全提前完成工程量。五、切割拆除施工方案1、工程特点分析及整体拆除方案:本工程切割拆卸部分为:隧道巷道内切割拆卸过程中要本着低振动、安全施工不破坏原结构的原则施工。我们经对图纸认真分析并了解现场情况后,决定采取如下方法对建筑实施局部保护性拆除施工。1横向按每一次1.5米最长距离不超两米的施工方法进行。2采用碟式锯片横向切割.横向上下间距为1米,切割深度按图纸规范要求进行切割。防止对保留结构造成损坏。3首先采用水钻钻机钻吊装孔和绳锯的穿绳孔。4立向竖刀位置.切割前采用钻机进行钻分裂机预备孔.卸块时采用分裂方法更为安全高效。3(绳锯)切割设备对顶板进行切割分块,切割成独立块后,采用50铲车顶升拆卸。2、拆除作业工序:合理的安排施工工序,是高效率施工的保障。本项目的总体施煤矿巷道切割改造施工方案协议-8-工工序如下:(1)首先清理施工范围内残留物及杂物。并将切割的场地清理腾空,使整个拆除区周围无障碍,达到切割拆卸作业的最佳位置(3)拆除部分按预计规划范围,吊装孔规格为70mm—108mm,切割块规格按重量比例进行切割,每块重量为5吨以内,为确保铲车能平稳拆卸安全施工。(4)测量放线后,按照甲方所划切割线确定的位置,在每个吊拆构件体上用水钻钻孔,每块板上打一个圆孔,使每个吊拆单元可以穿入钢丝绳进行吊拆。六、质量保证措施1、施工前,管理人员认真学习施工规范、工艺标准、设计要求和施工组织方案,做到心中有数。2、做好对施工人员的技术交底,并对参加施工人员进行质量及安全教育。3、改变施工工艺必须经双方协调同意,任何变更一律以书面通知为准。4、施工用材料、工具与设备应经过检验合格后方可进场。煤矿巷道切割改造施工方案协议-9-七、安全管理措施1、安全管理方针、目标(1)安全管理方针:安全第一,预防为主。(2)安全生产目标:确保无重大工伤事故,杜绝死亡事故。(3)安全组织保证体系:针对本工程的规模与特点,以项目经理为首,由各施工小组的管理人员组成安全保证体系。2、安全教育制度安全教育程序如下框图组织安全教育工人三级教育特种工人培训教育班前教育技术交底上报项目经理部上报安全总监备案现场责任工程师监督检查安全资料下发批阅教育考卷填写教育卡培训资料下发上岗证填写教育卡本检查班前工具检查日安全注意事项组织安全活动周一下午12:30安全生产大会每天月25日15:00安全生产总结会安全总监主持召开(全体人员参加)书面提交现场经理,项目经理例会人员记录备案安全宣传教育上周安全总结表彰汇报月安全年产状况,提出下月安全生产控制计划煤矿巷道切割改造施工方案协议-10-3、安全管理制度(1)安全技术交底制:根据安全措施要求和现场实际情况,各级管理人员需亲自逐级进行书面交底。(2)班前检查制:总工程师在班前对施工方督促与检查。(3)周一安全活动制:经理部每周一要组织全体施工人员进行安全教育,对上一周安全方面存在的问题进行总结,对本周的安全重点和注意事项做必要的交底,使广大工人能心中有数,从意识上时刻绷紧安全这根弦。(4)定期检查与隐患整改制:经理部每周要组织一次安全生产检查,对查出的安全隐患必须制定可行的整改措施。定时间、定人员整改,并作好安全隐患整改、消项记录。(5)危急情况停工制:一旦出现场危及职工生命安全险情,要立即停工,同时即刻报告公司,及时采取措施排除险情。(6)持证上岗制:特殊工种必须持有上岗操作证,严禁无证上岗。4、安全防护措施煤矿巷道切割改造施工方案协议-11-(1)所有施工人员认真贯彻执行公司“安全第一”的安全方针。(2)开工前要对全体施工人员进行技术安全、消防保卫等交底,做到班前班后总结,对工程结构详细了解,全员明白清楚后方可施工。(3)民工进场前要签订《施工安全协议书》,明确安全责任,做到安全合理用工,并指定专人负责安全生产指挥。(4)施工人员要遵守安全生产三大纪律:进入施工现场必须戴好安全帽、高空作业必须系好安全带、高空作业不得往下掉东西。(5)施工人员进场要配带入场证,业务人员进场需到门卫处领取安全帽方可入场。(6)甲方及公司上级领导在门卫处领取安全帽,由现场人员陪同入场视察,指挥检查工作。(7)各工种必须按照本工种的安全技术操作规程操作。(8)专职安全员巡视现场,严格按照安全交底及安全操作规程施工。(9)使用明火作业要经消防安全部门审批。使用氧气、乙炔时必须开动火证。氧气切割作业时,必须设专人对切割时产生的铁渣进行处理。并备有灭火器保证消防安全。煤矿巷道切割改造施工方案协议-12-(10)机械负荷前应进行试运转,不得带“病”作业,每日要检查各部件牢固情况。(11)在高空作业时,检查下部结构情况是否稳固,分段作业要观察结构连接情况,不得立体作业。(12)在施工期间,做到三不伤害:不伤割自己,不伤害别人,不被别人伤害,确保安全施工。(15)在施工过程中做好安全防护。搭设围挡对施工区域进行封闭,防止非施工人员进入现场。(16)施工中发生重大突发事件时,果断采取措施并及时向甲方及有关管理部门汇报。5、消防措施(1)进入施工现场的工作人员一律进行防火安全教育。(2)进入施工现场必须严禁遵守施工现场所规定的各项保卫工作条例。(3)进入施工现场的人员禁止随便吸烟,必须
本文标题:煤矿巷道栋梁切割施工方案
链接地址:https://www.777doc.com/doc-2302747 .html