封闭式组合电器安装作业指导书编码:BDDQ-ZW-02批准人:审核人:编写人:110kV金源变二期工程项目部2016年3月10日目次1适用范围····················································································································172编写依据····················································································································173作业流程····················································································································174安全风险辨析与预控·····································································································185作业准备····················································································································196作业方法····················································································································207质量控制措施及检验标准·······························································································221适用范围本作业指导书适用于110~500kV电压等级,频率为50Hz的封闭式组合电器(GIS)的安装作业,包括户外式、户内式、组合型、单元型。2编写依据表2-1编写依据序号引用资料名称1GBJ147—1990《电气装置安装工程高压电器施工及验收规范》2GBJ149—1990《电气装置安装工程母线装置施工及验收规范》3DL408—1991《电业安全工作规程(发电厂和变电所电气部分)》4DL5009.3—1997《电力建设安全工作规程(变电所部分)》5Q/CSG10001—2004《变电站安健环设施标准》6Q/CSG10007—2004《电力设备预防性试验规程》7Q/CSG10017.2—2007《110kV~500kV送变电工程质量检验及评定标准第2部分:变电电气安装工程》8Q/CSG11105.2—2008《南方电网工程施工工艺控制规范》9《中国南方电网公司十项重点反事故措施》3作业流程作业(工序)流程见图3-1。图3-1作业(工序)流程图4安全风险辨析与预控4.1封闭式组合电器安装作业前,施工项目部根据该项目作业任务、施工条件,参照《电网建设施工安全基准风险指南》(下简称《指南》)开展针对性安全风险评估工作,形成该任务的风险分析表。4.2按《指南》中与封闭式组合电器安装作业相关联的《电网建设安全施工作业票》(编码:BDDQ-ZW-02-01/01),结合现场实际情况进行差异化分析,确定风险等级,现场技术员填写安全施工作业票,安全员审核,施工负责人签发。4.3施工负责人核对风险控制措施,并在日站班会上对全体作业人员进行安全交底,接受交底的作业人员负责将安全措施落实到各作业任务和步骤中。4.4安全施工作业票由施工负责人现场持有,工作内容、地点不变时可连续使用10天,超过10天须重新办理作业票,在工作完成后上交项目部保存备查。5作业准备5.1人员配备表5-1作业人员配备表工序名称建议工作人数负责人数监护人数基础检查画中心线2(一个间隔)11间隔单元设备安装连接6(一个间隔)11就地控制柜安装4(一个间隔)11控制电缆敷设4(一个间隔)11控制电缆接线4(一个间隔)11进出线套管安装4(一个间隔)11操动机构连接及调校4(一个间隔)11气管安装2(一个间隔)11回路电阻测试、吸附剂更换2(一个间隔)11检漏、抽真空和充气2(一个间隔)11单元测试2(一个间隔)11交流耐压试验4(一个间隔)11注:作业人数根据具体工程量规模配备。5.2主要工器具及仪器仪表配置表5-2主要工器具及仪器仪表配置表序号名称规格/编号单位数量备注1吊车50T/25T/16T台12吸尘器台13滚筒20T条54丙酮瓶505烘箱台16SF6充放装置台27SF6微水检测仪台18SF6检测仪台29钢丝绳头25对1010卡环16T只1011农用薄膜卷212无水酒精97%以上瓶5013无尘纸巾卷5014滑轮5T台515链条葫芦3T只516链条葫芦2T只1017导向杆视法兰口螺丝定条218温湿度表个1注:主要工器具及仪器仪表根据具体工程量规模配备。6作业方法6.1施工准备6.1.1技术准备:按规程、生产厂家安装说明书、图纸、设计要求及施工措施对施工人员进行技术交底,交底要有针对性。6.1.2人员组织:技术负责人、安装负责人、安全质量负责人和技术工人。6.1.3机具的准备:按施工要求准备机具,并对其性能及状态进行检查和维护。6.1.4施工材料准备:酒精、无尘纸巾、农用薄膜、丙酮等。6.2组合电器设备安装6.2.1以母管的中心为基准,标出各间隔的中心线。6.2.2整个间隔为1件设备,每件的重量在6~9t之间,设备就位时比较困难,用室内天车吊装时,要选择好吊点,尼龙吊套、吊装角度要符合要求,避免设备倾斜,吊装过程中要设专人指挥,防止振动过大损伤设备及地面。6.2.3对照生产厂家资料中的产品标志,开箱后将各组件的号码标在相应位置及图纸上,然后根据号码将各组件一一对应就位,就位安装时用线垂、水平尺找准中心和调好水平。6.2.4就位前首先确定中心单元,并将其运至预定位置,找正后将基础点焊固定,然后以此为基准进行拼装,两侧单元向中心单元平移对接。每个间隔之间应保持有1m距离为母线对口的施工作准备。6.2.5母线的安装连接。(1)将要延伸的母管放置距已固定好的母管大约2000mm的位置,按生产厂家图示位置松开制动螺栓,分别将两个对接法兰封盖打开,检查对接面应光滑,没有划痕、凹凸点、铸造砂眼等缺陷;检查支持绝缘子和盆式绝缘子应无裂纹、无闪络痕迹、内膛无粉尘、无焊渣,导体和内壁应平整且无尖端、无毛刺。(2)将导体完全地插入管内的接口,并保持导体水平。将涂有硅胶的“O”形密封环压入密封法兰的密封槽,对接法兰之间的密封垫在对接前必须全部更换。(3)对接时使用两组以上的手搬葫芦,固定在整个GIS单元的首尾两端,在专人指挥下同时用力,使整个单元平行滑动。当两个接口相距约50mm时,使用两支与结合螺栓直径相同的导向杆贯穿两个对接法兰的相对应的两组螺孔,该两组螺孔必须位于法兰面任一直径的两端,然后慢慢扳动葫芦,使两个单元逐步靠近,并随时检查两根导向杆是否伸缩自如,否则必须重新找平或找正。(4)对接成功后,先将法兰圆周上的螺栓全部插入,再按对角方向逐一拧紧,特别注意每条螺栓不要一次拧紧,而是按对角旋转进行。(5)安装母线筒时,应先吊起母线筒的一端,再将另一端垫平,使之平移对接,两组母线的汇合处装有伸缩节,其具体安装要求及调整方法符合生产厂家规定。(6)母管与出线套管连接前,应先进行套管永久支撑构架的安装。由于户外灰尘大,接口前,接头部分的孔应用胶纸封好,驳接时才撕掉。户外湿度较大,应注意防潮。(7)驳接母管时,应一边接母管,一边设置临时支撑或永久性支撑构架,以免因自身重力引起母管变形。(8)母管内膛作业时,必须由专门指定人员完成,作业时必须戴好帽子、口罩、穿无扣连体工作服,所用工具须记录,工作完毕后再清点,防止遗留在膛内。(9)连接插件的触头中心应对准插口,不得卡阻,插入深度应符合规定。(10)内膛作业完毕封闭前,用吸尘器进行清理,以防头发、灰尘等细小杂物留在膛内。(11)每完成一次性对接工作,都必须随时测量对接后的接触电阻值,如不合格必须返工,并随时检查对接后的相位是否正确。6.2.6气体的密封。(1)检查“O”形密封槽和法兰表面有无刻痕、凹印、污物等,在涂密封胶前,用溶剂将其清洗干净,并充分干燥。所用溶剂应满足以下要求:环氧树脂用无水乙醇清洗,金属件用稀释剂清洗。(2)使用的密封胶应是能防水、防腐的KE44RTVW或KE45RTVW型,使用前应先在接管口开一小斜口,然后将接管口连接到密封胶管上。(3)在密封槽底靠外侧的角上涂一层密封胶,靠气体内侧不能涂有密封胶,应注意密封胶不得与其他任何型号的溶剂混合使用。(4)均匀抹平密封胶面,使槽底靠外部的角上都布满密封胶。(5)检查专用“O”形密封胶垫是否有损伤与污物,用无水乙醇清洗干净,然后将它放入槽内靠近外部的区域。(6)在“O”形密封胶垫与密封槽靠外侧顶部的接触处涂一层密封胶,用手将胶面均匀抹平,将多余的胶抹到槽的外法兰面上。(7)在“O”形密封胶垫至外部边缘的法兰面上均匀涂一层约1mm厚的密封胶,注意法兰的连接必须在涂胶后的1h内完成。连接后应将多余的清理干净。(8)确认元件内部没有任何异物即可进行驳接。(9)电压互感器的安装需在交流耐压试验后进行;避雷器安装需在工频耐压后进行。(10)对照安装图进行接地开关操动机构的连接,通过调节连杆,使得制动间隙在允许的范围内(2~8mm)。(11)在断路器单元、母管全部装好后,即可开始抽真空、充气。抽真空与充气应按生产厂家提供的程序进行。6.2.7密封室抽真空程序。(1)抽真空前,检查所有气室防爆膜应无损坏;所有打开气室内的吸附剂必须更换。(2)打开GIS气体密封室的进气阀门盖子。(3)把软皮管接头连接到进气阀门上。(4)启动真空泵,并打开管路的阀门。(5)抽真空过程中每隔10min观察一次真空表的读数,看指针是否有持续下降。如指针持续下降,表明有泄漏点,必须及时处理。监视真空表读数达到133.3Pa时,继续抽真空30min,停4h不低于133.3Pa,再抽2h后可充气。(6)关闭GIS密封室的进气阀门,停止真空泵。(7)拆除软皮管。6.2.8SF6气体充注程序。(1)检查证实GIS密封室的进气阀门关闭。(2)打开GIS密封室的进气阀门盖子。(3)连接安全阀门及接头到GIS密封室的进气阀门上。(4)把接头、SF6气体调节装置、尼龙软管连接到气体钢瓶上。(5)打开SF6气体钢瓶阀门,然后慢慢地按顺时针方向转动调节装置手柄,使SF6气体把软管里的空气赶出。(6)把尼龙软管连接到安全阀门上。(7)打开GIS密封室的进气阀门,并调整SF6气体调节装置的手柄,对GIS密封室进行充气。(8)获得准确压力后,关闭SF6气体钢瓶阀门,关闭GIS密封室阀门,并拆除尼龙软管。(9)除生产厂家有特别说明外,SF6气体密封室都应先抽真空后充SF6气体,抽真空过程中如真空泵突然停止,应立即关闭有关阀门,并检查确定真空泵的空气是否回流至胶管或SF6气体密封室。6.2.9充气完成8h后,可采用局部包扎法进行气体检漏。用透明塑料布和胶带将GIS所有的对接口(包括密度继电器、充气口、接地开关轴封、地线封盖、电力电缆接头等)包扎严密。包扎24h后进行定量检测,SF6气体泄漏量应符合要求。6.2.10部件螺栓的连接应按厂家提供的力矩值进行紧固;在抽真空前必须把设备基础槽钢跟预埋件焊接牢靠。6.2.11待调整好各支架的中心、位置、高度后,可对照生产厂家图纸进行地脚螺丝的安装与设备接地的工作。6.2.12在组件安装过程中,可同时进行就地控制箱就位,电缆的敷设、接线,设备的调试等工作。7质量控制措施及检验标准7.1质量控制措施7.1.1GIS的安装是将元件按照
本文标题:封闭式组合电器安装作业指导书
链接地址:https://www.777doc.com/doc-2468855 .html