您好,欢迎访问三七文档
中国石化胜利油田有限公司石油化工总厂50×104吨/年催柴加氢精制装置土建施工方案目录THESECONDCONSTRUCTIONCOMPANY,SINOPEC中国石化集团第二建设公司目录1.工程概况......................................................................11.1工程简介............................................................................................................................................................11.2工程实物量........................................................................................................................................................12.编制依据及施工验收规范.........................................................13.施工程序及施工方法.............................................................13.1施工程序............................................................................................................................................................13.2施工方法............................................................................................................................................................24.施工技术要求...................................................................24.1基础工程............................................................................................................................................................24.2原有基础处理....................................................................................................................................................64.3门窗更换............................................................................................................................................................64.4砌砖工程............................................................................................................................................................64.5雨季施工措施....................................................................................................................................................75.工程质量标准...................................................................75.1试件(试块)的制作留取................................................................................................................................75.2砼设备基础尺寸允许偏差和检验方法............................................................................................................86.质量保证措施...................................................................96.1建立质保体系....................................................................................................................................................96.2质保措施............................................................................................................................................................97.HSE实施及保证措施............................................................107.1项目部HSE方针..............................................................................................................................................107.2项目部HSE管理目标.....................................................................................................................................107.3HSE实施保证措施..........................................................................................................................................118.施工进度计划..................................................................129.劳动力安排计划................................................................1210.施工机具及主要手段用料表.....................................................12中国石化胜利油田有限公司石油化工总厂50×104吨/年催柴加氢精制装置土建施工方案第1页共15页THESECONDCONSTRUCTIONCOMPANY,SINOPEC中国石化集团第二建设公司1.工程概况1.1工程简介(1)催柴加氢精制装置土建工程内容:新建仪电控制室,高低压配电室平面改造,电缆沟,反应器R4101框架基础,构架—4改造,构架—5改造,管架改造,塔炉及设备基础,泵基础等土建工程,其中仪电控制室、高低压配电室平面改造的土建工程和装置里的塔炉基础为本次施工的主要内容。本工程地处东营地区,土质较松散,施工难度较大,还有许多设备基础需要拆除、移位,对临近利旧的建筑物及设备需要采取妥当的保护措施。(2)结构形式A.框架、管架、塔及炉基础均采用现浇钢筋砼结构。B.设备基础:均采用现浇钢筋砼或素砼结构。C.泵基础:采用现浇素砼结构。D.控制室为砖混结构。1.2工程实物量工程实物量(见附录一)2.编制依据及施工验收规范2.1QG/SE18.01-1996《质量手册》和QG/SE18.02-1996《质量体系程序文件》中国石化第二建设公司;2.2QG/SE12.03《施工方案/措施编制、审批管理标准》中国石化第二建设公司;2.3《石油化工施工安全技术规程》SH3505-1999;2.4《中国石化胜利油田有限公司石油化工总厂50×104吨/年催柴加氢装置质量计划/施工组织设计》2.5施工图纸:图号62-01∽09洛阳设计院设计。2.6《建筑地基处理技术规范》JGJ79-972.7《混凝土结构工程施工质量验收规范》GB50204-20022.8《石油化工设备混凝土基础工程施工及验收规范》SH3510-20002.9《钢筋焊接及验收规范》JGJ18-963.施工程序及施工方法3.1施工程序施工准备→旧基础拆除→测量放线→桩基施工→土方开挖→碎石垫层→砼垫层→钢筋绑扎→模板支设→砼浇筑→拆模→土方回填→交付安装中国石化胜利油田有限公司石油化工总厂50×104吨/年催柴加氢精制装置土建施工方案第2页共15页THESECONDCONSTRUCTIONCOMPANY,SINOPEC中国石化集团第二建设公司3.2施工方法(1)土方开挖:对于小型基础采用人工开挖,而大型基础采用以机械为主、人工为辅进行开挖;(2)模板的支设:小型基础的模板可以一次性的支设,采用钢模体系;而对于大型基础采用竹胶板木龙骨模板体系;对于框架采用复合木模板和钢模板相结合的方式;(3)钢筋的制作:钢筋制作在钢筋棚里下料预制,然后进行现场绑扎;框架柱钢筋采用直螺纹连接;(4)砼的浇注:对于独立基础、条形基础、大板基础采用一次浇注法,而对于框架结构采用二次浇注法;(5)砼的养护:采用塑料薄膜和草袋覆盖保温的综合蓄热法进行养护。4.施工技术要求4.1基础工程(1)土方工程A.施工准备工作为了保证土方开挖顺利进行,前期的准备工作要充分周密,尤其应做好以下几项工作:B.给定坐标的引测工作及工程的轴线定位。C.测量放线及测量桩、点的保护。D.施工用电、用水,设置供电,供水路线,保障施工特别是夜间施工不受阻碍。(2)土方开挖A.根据现场实际情况及施工工期的要求,基础的开挖,采用人机相结合的开挖方式,以提高施工的工作效率。B.为防止超挖或者扰动老土,机械开挖至基底200mm处应停止,采用人工挖土,完成部分及时复核土面标高是否符合要求,以免出现超挖、欠挖现象。C.开挖后可以用作回填的土堆放一旁,其余土方用自卸汽车运至业主指定的弃土堆放地点。D.为防下雨对基底造成破坏,产生不必要的损失,每完成一段既做好素砼垫层。(3)放坡系数为保证基坑稳定,放坡应根据土质、现场相邻建构筑物及道路距离等情况而定。(4)排水中国石化胜利油田有限公司石油化工总厂50×104吨/年催柴加氢精制装置土建施工方案第3页共15页THESECONDCONSTRUCTIONCOMPANY,SINOPEC中国石化集团第二建设公司采用集水井及轻型井点两
本文标题:加氢土建方案
链接地址:https://www.777doc.com/doc-2626968 .html