您好,欢迎访问三七文档
当前位置:首页 > 建筑/环境 > 电气安装工程 > ABS工程电气安装监理细则
中国石化股份公司高桥分公司ABS耐热级牌号装置技术改造电气安装监理细则编制:审批:上海高华工程咨询监理有限公司2011年9月项目电气安装监理细则目录--1目录1工程概况···································································································12本监理细则适用范围及目标··········································································13监理细则编制依据······················································································14施工准备阶段监理要点················································································25施工阶段质量监理监控要点··········································································35.1电气安装主要流程图·············································································35.2盘柜基础安装的监理方法与措施······························································35.3现场操作柱安装监理的主要方法与措施·····················································55.4电气配管监理的主要方法与措施······························································55.5电缆铺设监理的主要方法与措施······························································65.6装置区照明安装监理的主要方法与措施·····················································65.7接地安装监理的主要方法与措施······························································75.8电机检查接线监理的主要方法与措施························································76交工文件资料监理监控要点··········································································86.1交工文件规定······················································································86.2电气交工文件主要内容··········································································8项目电气安装监理细则-1-1、工程概况1.1工程名称:中国石化股份公司高桥分公司ABS耐热级牌号装置技术改造工程1.2建设单位:中国石化股份公司高桥分公司1.3设计单位:中国石化工程建设公司1.4施工单位:上海高桥捷派克石化工程建设有限公司1.6本项目电气工程概述1.6.1本项目电气主要工程量包括:低压开关柜5台;防爆操作柱16套;防爆照明灯37套;电缆桥架40米;动力电缆约9100米;控制电缆约8500米;镀锌钢管约650米;镀锌扁钢约350米。1.7.3本工程电气施工特点本工程是在高桥分公司漕泾化工事业部厂区内技术改造,电气部分主要依托原有设施,进行部分改造,有效作业时间较短2、本监理细则适用范围及目标:本细则在监理规划的基础上,将电气安装监理工作内容具体化、详细化、深入化,使之成为可实际操作的实施细则,进而按计划全面有效地对电气安装各分项分部工程质量、安全等进行监理控制,以实现电气施工监理的全面控制和管理目标。本细则适用于本工程。3、监理细则编制依据本项目的《监理规划》和《安全(HSE)监理方案》;本项目的设计文件和施工图纸;本项目《施工组织设计》和《电气安装施工方案》;《电气装置安装工程电缆线路施工及验收规范》GB50168-2006;《电气装置安装工程接地装置施工及验收规范》GB50169-2006;《电气装置安装工程旋转电机施工及验收规范》GB50170-2006;《电气装置安装工程盘柜及二次回路结线施工及验收规范》GB50171-92;《电气装置安装工程母线装置施工及验收规范》GBJ149-90;《电气装置安装工程低压电气施工及验收规范》GB50254-96;《电气装置安装工程爆炸和火灾危险环境电气装置施工及验收规范》GB50257-96;《电气装置安装工程电气设备交接试验标准》GB50150-2006;项目电气安装监理细则--24、施工准备阶段监理要点4.1.熟悉合同文件、质量标准、设计图纸和技术资料;4.2.审核电气专业分包资质和专业人员资质,审核施工组织设计或专项方案,检查的数量,核实施工机具和施工人员到位;对分包单位资格应审核以下内容:分包单位的营业执照;企业资质等级证书;特殊行业施工许可证;分包单位的业绩;分包工程的内容和范围;专职管理人员和特种作业人员的资格证、上岗证;4.3.承担电气工程的施工企业应具备相应的资质;检查施工单位的质量保证体系、安全保证体系、质量管理体系、技术管理体系、施工质量控制和检验制度、相应的施工技术标准;4.4.检查电气工程采用的新技术、新设备、新材料、新工艺是否按照有关规定进行评审、鉴定及备案。施工前监理应督促施工单位对新的或首次采用的施工工艺进行评价,并制定专门的施工技术方案报监理审核;4.5.检查施工单位应对从事电气工程施工作业的人员进行技术交底和必要的实际操作培训,技术交底书面记录交监理备案;4.6.在施工单位自检合格的基础上,监理对材料和设备的品种、规格、参数等进行检查确认。监理应对材料和设备的质量证明文件进行核查;进入现场的材料和设备均有出厂合格证、中文说明书及相关性能检测报告;定型产品和成套技术应有型式检验报告;进口材料和设备应按规定进行出入境商品检验;4.7.监理应参加建设单位组织的设计交底会,并对图纸中存在的问题通过建设单位向设计单位提出书面意见和建议;项目电气安装监理细则--35、施工阶段质量监理监控要点5.1、电气安装主要流程图5.2、盘柜安装的监理主要方法与措施本工程在ABS变配电室新增5台低压柜(S128、S130~S133)。5.2.1对低压盘、柜开箱检查,检查其型号、规格及屏面布置是否符合设计要求,有无损坏或脱漆、元件是否完好无损5.2.2(1)检查基础型钢安装是否符合如下表要求。底座安装的允许偏差应符合下列规定:项目允许偏差mm/mmm/全长不直度15水平度15(2)检查低压盘、柜安装的允许偏差是否符合如下表要求项目允许偏差(mm)垂直度(每米)<1.5施工准备电气设备安装预制预埋电信安装照明配管桥架安装动力暗配管接地线铺设设备安装照明穿线动力明配管接地测试线缆铺设灯具安装照明调试施工准备线缆铺设系统试验系统受送电试车交工验收项目电气安装监理细则--4水平偏差相邻两盘顶部<2成列盘顶部<5盘面偏差相邻两盘边<1成列盘面<5盘间接缝<25.2.3盘、柜接地应牢固、良好,并与接地线进行可靠连接,盘柜基础型钢应有2点以上与接地主干线可靠连接。5.2.4对母线安装的检查(1)母线的接触面应紧密,连接螺母应用力矩扳平紧固。矩扳手拧紧钢制连接螺栓的力矩值应符合下列规定:序号螺栓规格力矩值(N·m)1M88.8~10.82M1017.7~22.63M1231.4~39.24M1451.0~60.85M1678.5~98.1(2)母线表面应平整、光洁、无裂纹、无折皱。安装螺孔采用机械钻孔;母线加工后接触面应保持清洁,涂以导电膏;平置母线螺栓由下往上穿,其余情况,螺母应置于维护侧,螺栓长度宜露出螺母2-3扣。螺栓为镀锌螺栓。螺栓连接的母线两侧均应有平垫圈,螺母侧应装有弹簧垫圈,螺栓受力应均匀。5.2.5盘柜安装后应按以下要求及时进行内在质量检查:a认真阅读配电系统的原理图、接线图、发现问题应及时和有关方面联系;b检查电器元件质量、型号、规格应符合设计及有关标准、规范要求;c继电保护元件整定范围应能满足设计整定值要求;d计量仪表刻度值范围应能满足实际需要;e内部配线应整齐完好,固定牢固,标识清楚且与原理图、接线图相符;f检查主母线的布置是否正确,母线连接处的处理方式,相序及相色标识是否清晰、齐全;g检查主母线与分支母线连接处的搭接面是否符合要求,分支母线上标识的相序是否与主母线相符;h检查移动式设备(如开关柜小车)动作是否灵活,断路器(接触器)跳、合闸是否符合技术要求;i导电部分的电气间隙及爬电距离应符合规范要求;电气元件固定牢固,接地良好。5.2.6盘内接线检查(1)电缆在盘下固定后,由盘底穿入盘内,在盘底作电缆头并加以固定,剥电缆外皮时应防止损伤芯线。(2)电缆芯线应捆扎成束沿配线架引上,分支时应弯度一致、并行排列。项目电气安装监理细则--5(3)电缆芯线应采用专用打号机打出回路编号,其字迹应清析、持久、内容齐全。(4)严格按图纸接线,每个端子一侧接线宜为一根,不得超过两根。(5)配线应整齐、美观、固定牢固,不得有中间接头。5.3、现场防爆操作柱安装监理的主要方法与措施本工程现场安装16套防爆操作柱。(1)防爆操作柱上的按钮应动作灵活、可靠,防止电机无法停车或无法启动的现象发生。(2)操作柱及控制箱上的指示仪表应完好并经校验合格。(3)成排安装的防爆操作柱应在一条直线上,上面的设备编号、标识应清晰,安装位置应便于操作、维护。5.4、电气配管监理的主要方法与措施(1)电气配管前,有关人员应与土建、安装及专业进行详细图纸会审,了解现场布置情况,以及电气配管是否与安装专业设备、管道、结构等位置相矛盾,以免施工后产生矛盾,造成返工。(2)钢管(Ф50及以下)连接处全部采用螺纹连接,管端螺纹长度不应小于管接头长度的1/2,连接后的螺纹外露宜为2-3扣,螺纹的表面应光滑,无缺损。(3)暗配管连接处焊跨接线,刷沥青漆防腐,明配管的连接处抹电力复合脂,以保证电气管路的接地可靠。(4)钢管配完后应及时密封管口,防止进入杂物。(5)电气配管质量要求:﹡管口无毛刺和尖角,管口应有护线帽或做成喇叭口。﹡电缆管弯制后,不应有裂缝和显著的凹瘪现象,其弯扁程度不宜大于管子外径的10%;电缆管的弯曲半径不应小于穿入电缆的最小允许弯曲半径。﹡电缆管的内径与电缆外径之比不得小于1.5。﹡电缆管应安装牢固,支架间距不宜超过3m。﹡电缆埋设深度不应小于0.7m,在人行道下敷设时,不应小于0.5m。﹡电缆管应有不小于0.1%的排水坡度。﹡电缆管连接应紧密,不得有地下水和泥沙渗入。项目电气安装监理细则--65.5、电缆敷设监理的主要方法与措施本工程配电室至现场的电缆沿桥架敷设,出桥架后电缆穿钢管明敷至设备处(1)电缆敷设应在设备已就位,桥架安装、钢管配制等工作已完成,经共检合格后方可进行。(2)电缆敷设前应认真阅读电缆敷设有关图纸,熟悉设备位号、电缆路径及经过断面,防止放错电缆事故发生。(3)电缆运输的过程中应固定牢固,并用吊车吊下,严禁将电缆盘直接从车上推下。(4)敷设时应核对好电缆型号、规格、电压等级、长度等。(5)测量电缆绝缘电阻,高压电缆要进行直流耐压试验,确认电缆合格后方可敷设,试验时作好记录。(6)电缆敷设时应选定参
本文标题:ABS工程电气安装监理细则
链接地址:https://www.777doc.com/doc-2895631 .html