您好,欢迎访问三七文档
当前位置:首页 > 建筑/环境 > 工程监理 > 1一般土石方工程作业指导书TSFGC-01
1TSFGC-02泥水坑及流砂坑开挖作业指导书455第8部分:配网工程一般土石方工程作业指导书编码:TSFGC-01TSFGC-02泥水坑及流砂坑开挖作业指导书1目次1适用范围······················································································································································22编写依据······················································································································································23作业流程图···················································································································································24安全风险辨析与预控···································································································································25作业准备························································································································································46作业方法··························································································································································47质量控制措施及检验标准·······························································································································71适用范围本节适用于35kV及以下配网工程架空线路工程的一般土石方工程(一般土石方作业、泥水坑及流砂坑开挖作业、岩石开挖作业、掏挖基坑开挖作业)施工。2编写依据表2编写依据序号引用资料名称1GB50233—2005《110~500kV架空送电线路施工及验收规范》2DL/T5168—2002《110kV~500kV架空电力线路工程施工质量及评定规程》3GB50202—2002《建筑地基基础工程施工质量验收规范》4Q/CSG11105—2008《南方电网工程施工工艺控制规范》5《中国南方电网有限责任公司基建工程质量控制作业标准(WHS)》3作业流程图图3作业流程图4安全风险辨析与预控4.1一般土石方工程作业前,施工项目部根据该项目作业任务、施工条件,参照《电网建设施工安全基准风险指南》(下简称《指南》)开展针对性安全风险评估工作,形成该任务的风险分析表。4.2按《指南》中与一般土石方工程作业相关联的《电网建设安全施工作业票》(编码:TSFGC-01-01/01),结合现场实际情况进行差异化分析,确定风险等级,现场技术员填写安全施工作业票,安全员审核,施工负责人签发。4.3施工负责人核对风险控制措施,并在日站班会上对全体作业人员进行安全交底,接受交底的作业人员负责将安全措施落实到各作业任务和步骤中。4.4安全施工作业票由施工负责人现场持有,工作内容、地点不变时可连续使用10天,超过10天须重新办理作业票,在工作完成后上交项目部保存备查。表4.1作业任务安全基准风险指南序号危害名称风险种类风险等级风险控制措施1施工区域防暑降温措施不足中暑中等风险1.避开炎热时间段作业;2.采取配置太阳伞、排风扇、中暑急救药物等措施,合理安排人员休息;3.提供足够茶水供应2户外蛇虫咬伤中毒中等风险1.穿好防护鞋,扎好裤脚;2.配带急救药物3道路测量防护措施不足交通意外高风险做好现场安全防护措施4定位复测踩空坑洞摔绊扭伤淹溺中等风险定位作业时,查勘坑洞位置,做好警示标识5挖掘机操作手无证上岗碰撞打击低风险挖掘机操作手必须持证上岗6挖掘机械回转半径范围内站人碰撞中等风险施工区域必须做好警示标识,挖掘机械工作期间禁止人员进入7操作人员前后间距不足碰撞打击低风险确保作业人员前后间距不得小于3m8基坑四周无有效的安全围蔽措施坠落低风险设置符合要求的围栏,围栏高度为1.1m,晚上设置夜间警示灯,防止外人误入工作区域9基坑边坡无支护或支护不足坍塌中等风险根据土质情况,制定支护施工方案,采取有效支护措施10挖出的土方和使用的材料工器具摆放在基坑四周坍塌打击中等风险将基坑挖出的土方及时转运,材料工器具摆放在离坑边2m以外的地方11抽水设备漏电或电源线损坏触电高风险严格执行一机一闸一漏电的电源箱,使用合格电源线,操作人员穿戴胶鞋12风镐机或电源线漏电触电高风险风镐机要用绝缘良好的电缆,使用前做好绝缘检查,配置漏电保护开关13基坑内岩石开凿没有防护措施打击低风险作业人员正确使用劳动防护用品,施工区域设置有效的防围措施14土方(泥浆)运输车辆撒漏工作环境污染低风险工地现场必须设置洗车槽,做好有效的防撒漏、防扬尘措施,未经清洗干净的车辆不得离开工地15土方(泥浆)运输车辆超载、超速等违章驾驶交通意外特高的风险设专人监管,确保工地装载土方(泥浆)不得超载、超速等违章驾驶16基坑回填分层夯实时,打夯机或电源线漏电触电高风险严格执行一机一闸一漏电的电源箱,使用合格电源线,操作人员穿戴胶鞋、胶手套5作业准备5.1作业前施工条件表5.1作业前施工条件序号项目内容确认人说明1任务单根据本单位实际设置内容(包含本项工作)本工序施工负责人经审批2相关证照根据需要办理涉及进入工作场所的手续、证件本工序施工负责人有效3工程合同或协议合同及安全协议本工序施工负责人有效4图纸设计图纸本工序施工负责人经审批5施工方案施工措施、安全技术交底(项目部级)本工序施工负责人经审批5.2人员、主要工器具及仪器仪表配置表5.2人员、主要工器具及仪器仪表配置序号项目内容说明1人员配置项目负责人、施工员、测量员、质安员等专业技术人员,配置满足施工安全、质量、进度需要的施工作业人员技术岗位必须持有与作业工种相应、有效的上岗证2施工内容相对应的设备、材料施工所需材料必须符合设计要求3施工内容相对应的器具、机械及工器具、仪表施工所需的工器具、机械、测量仪器等根据现场情况使用的工器具、机械符合相关要求。仪器、仪表使用前必须经有资质的单位检验合格且在检测有效期内才能使用5完成开工程序工作负责人向项目负责人报开工,并由项目负责人完成向监理单位开工报审手续施工准备完成后可报开工,当施工准备不足时,上报该项目负责人协调解决6作业方法表6作业方法序号项目内容说明1作业前工作(1)现场施工负责人向进入本施工范围的所有工作人员明确交待本次施工设备状态、作业内容、作业范围、进度要求、特殊项目施工要求、作业标准、安全注意事项、危险点及控制措施、危害环境的相应预防控制措施、人员分工,并签署(班组级)安全技术交底表。(2)现场施工负责人负责办理相关的工作许可手续,开工前做好现场施工防护围蔽警示措施;夜间施工的须有足够的照明。按安规规定佩戴统一的安全帽,统一佩戴有个人照片的作业证(或胸卡证),穿着统一的工作服(3)现场施工负责人组织检查确认进入本施工范围所有工作人员的是否正确使用劳保用品及着装,并带领施工作业人员进入作业现场2开始主要作业现场施工负责人发出许可开工命令3线路定位复测(1)线路定位前必须依据设计提供的数据对杆塔中心桩进行复测,复测完成后进行基坑定位。(2)复测时有下列情况之一时,应查明原因并予以纠正:1)以相邻直线桩为基准,其横线路方向偏差≥50mm。2)用经纬仪视距法复测时,顺线路方向两相邻杆塔位中心桩间的距离与设计值的偏差不小于设计档距的1%。3)转角桩的角度值,用方向法复测时对设计值的偏差不小于1′30″。(3)在以下特殊地点应重点复核:1)导线对地距离有可能不够的地形凸起点的标高。2)杆塔位间交叉跨越物的标高。3)相邻杆塔位的相对标高实测值与设计值的偏差≥0.5m,超过时应由设计方查明原因并予以纠正。(4)设计交桩后个别丢失的杆塔中心桩,应按设计数据予以补桩,其测量精度应符合下列要求:1)桩之间的距离和高度测量,可采用视距法同向两测回或往返各一测回测定,其视距长度不宜超过400m,当受地形限制时,可适当放长。2)因地形或障碍物等原因需改变杆塔位或拉线坑位置时,应及时汇报现场主要负责人,并由主要负责人根据情况逐级上报。会同设计和监理、建设单位现场处理。3)对设计平断面图中未标识的新增障碍物应重点予以复核4施工基面处理施工基面的处理应以施工图要求为准。基面处理后应平整,不应积水,边坡不应坍塌,及时清除周边的浮石、悬石,边坡、临边开挖根据要求装设防护措施5基坑开挖(1)土石方开挖应按设计施工,减少需开挖以外地面的破坏,合理选择弃土的堆放点以保护自然植被及环境。铁塔基础施工基面的开挖应以设计图纸为准,按不同地质条件规定开挖边坡。基面开挖后应平整,不应积水,边坡不应坍塌。(2)土方开挖的顺序、方法必须与设计工况相一致。(3)杆塔基础的坑深应以设计施工基面为基准。当设计施工基面为零时,杆塔基础坑深应以设计中心桩处自然地面标高为基准。拉线基础坑深以拉线基础中心的地面标高为基准。(4)杆塔基础(不含掏挖基础和岩石基础)坑深允许偏差为+100mm、50mm,坑应平整。同基基础坑在允许偏差范围内按最深基坑找平。(5)杆塔基础坑深与设计坑深偏差大于+100mm时,应按以下规定处理:1)铁塔现浇基础坑,其超深部分应铺石灌浆。2)混凝土电杆基础、铁塔预制基础、铁塔金属基础等,其超深在+100~+300mm时,应采用设计填料,每层不宜超过100mm。当不能以填土或砂、石夯实处理时,基坑超深部分按设计要求处理,设计无具体要求时按铺石灌浆处理。坑深超过规定值+300mm以上可采用铺石灌浆处理。(6)挖底面积小于2m2时,允许1人挖掘。向坑外抛土时,应防止土石块回落伤人,更不允许停留在坑内休息。(7)水泥路开挖时,如果采用机械方式打风镐,施工人员应戴安全帽、手套与面罩。如果采用人工方式,打铁锤人应站在扶凿人的侧面,不得戴手套,并应采取有效措施防止行人接近时石块弹起伤人。(8)基坑开挖时,应装设围栏或加盖板,夜间必须挂警示压实机具分层填筑厚度mm每层压实遍数平碾250~3006~8振动压实机250~3503~4柴油打夯机200~2503~4人工打夯<2003~4标志等。(9)挖土打洞的工具应坚实牢固,多人在一起工作时,应保持适当的距离以防止工具脱落伤人。(10)人工挖槽施工宜安排在少雨季节进行,若必须在雨期施工,应采取有效防水措施。开工前应做好计划和施工准备,一旦开挖即应连续快速进行,以防雨水浸泡基坑6基坑回填(1)回填前应清除坑内积水、草皮、垃圾等杂物,应对称回填,且应在基底压实后再进行。对填方土料应按设计要求验收后方可填入。(2)预制拉线基础回填时,拉棒的方向、角度应正确,各部连接环与拉棒应挺直,不得横置或卡住。(3)杆塔基础坑及拉线基础坑回填,应符合设计要求。应分层夯实,每回填300mm厚度夯实一次。坑口的地面上应筑防沉层,防沉层的上部边宽不得小于坑口边宽,其高度视土质夯实程度确定,一般
本文标题:1一般土石方工程作业指导书TSFGC-01
链接地址:https://www.777doc.com/doc-3025117 .html