0青藏铁路建设某标某特大桥施工组织设计编制:复核:审批:1目录一、编制依据与编制原则······································1二、工程概况················································2三、施工组织部署············································5四、大、小临设施·············································7五、施工方案及施工工艺······································8(一)场地平整及防洪····································8(二)测量放线··········································8(三)挖井基础施工·····································9(四)钻孔灌注桩施工····································11(五)承台施工··········································20(六)明挖扩大基础施工··································21(七)实体墩、台施工·····································21(八)圆形空心墩施工····································23(九)特殊条件下桥涵施工注意事项························30(十)冬雨季主要施工措施································31六、安全、质量、工期、文明施工和环境保护等保证措施···········31(一)安全保证措施······································31(二)质量保护措施······································34(三)工期保证措施······································36(四)文明施工··········································36(五)环境保护措施······································372一、编制依据与编制原则(一)编制依据1、铁道第一勘察设计院设计的《某特大桥施工图》及相关标准图。2、铁道部青藏铁路建设指挥部及监理对工程的要求。3、对现场的踏勘情况及对当地资源的调查情况。4、我公司施工设备的配备及在类似工程施工中积累的施工、管理经验。5、铁道部颁《铁路桥涵施工规范》(TBJ203-96)和《铁路桥涵工程质量检验评定标准》(TB10415-98)、《铁路桥涵施工技术安全规则》(TBJ403-87)等。6、国家及地方的有关的法令、法规等。(二)编制原则1、某特大桥是青藏铁路重点控制性工程,只有保证工程的顺利如期竣工,才能保证全线的正常铺轨工作。所以,我们按照工期略有提前的原则编制施工计划,以此为前提配备劳动力、材料和机械设备。2、坚持以人为本的原则,合理配置生产要素,坚持以机械化施工为主,人工辅助的总体指导思想,充分考虑高原低温、缺氧对劳动力和机械设备效率的影响,加强医疗保障和劳动保护。投入足够的能适应高原气候的人员、精良的机械设备进场,提高机械化程度,降低施工人员的劳动强度。3、遵循技术先进可行、经济合理、安全可靠的原则合理进行施工。4、采取平行作业,流水作业,顺序作业法组织施工。混凝土施工3充分考虑低温影响,以集中拌合为主,采取有效的升温、保温措施,确保混凝土质量。5、坚持高起点、高标准、高质量、高效率,严格要求、严格管理,争创一流的指导方针,确保优质、安全、高效地完成施工任务,创建优质精品工程。二、工程概况某特大桥位于XX上游约15公里,XX与XX汇合口以下约2公里处,设计为1-24m+20-32m后张法预应力混凝土梁桥,中心里程为DKXX,桥全长690.19M,全桥位于R=800m、L=150m反向曲线及夹直线上,夹直线长428.27m,纵坡向拉萨方向上坡6‰和16‰。本桥桥台采用T型桥台,1号、2号、17∽20号桥墩为圆端形实体墩,3~19号采用圆形空心墩,该桥墩身平均高度达40m,最高墩身达50m;1号、2号、19号、20号墩为挖井基础;3-5#墩采用4φ180钻孔桩12根,共356延米,6-18#墩采用9φ150钻孔桩117根,共2556延米;两台基础为明挖扩大基础。4号墩右侧下埋有油管,左侧下埋设有通信光缆,曲线段桥梁中心与墩中心线有50CM的横向预偏心。全桥总圬工量为25470.9m3.(一)地质状况工点处地层为第四系全新统冲积土、细砂、中砂、粗砂、砾砂、圆砾土、卵石土、洪积粉砂、粗砂、圆砾土、碎石土,拉萨侧出露及下覆古生界石灰岩,具体描述如下:1、土(Qal34)黄褐色,厚度2~3m分布于河床底部的透镜体,局部为夹层,中密、潮湿I级松土,б0=150KPa。42、粉砂(Qpl44)褐黄色,厚度2~3m,分布于阶地表层及底部夹层,中密-密实,潮湿,I级松土,б0=150KPa。3、粉砂(Qpl43)褐黄色,厚度2.7m,分布于格侧桥台的透镜体,中密-密实、潮湿,I级松土,б0=150KPa。4、细砂(Qalpl444)淡黄色,厚度2~7m,分布于河床底部,多为透镜体,局部为夹层,中密,潮湿-饱和。I级松土,б0=150KPa。5、中砂(Qal54)淡黄色,厚度1-5.0m分布于河床底部,为透镜体、中密、饱和,I级松土,б0=350KPa。6、粗砂(Qalpl554)淡黄色,厚度1~7.0M,分布于河床及阶地底部,多为透镜体,局部为夹层,中密,潮湿饱和,I级松土,б0=350KPa。7、粗砂(Qpl53)淡黄色,厚度1.6m分布于格侧桥台,多为透镜体,中密,潮湿,I级松土,б0=400KPa。8、砾砂(Qal54)褐黄色,灰黄色,厚度2~7m,分布于河床底部,为透镜体,局部为夹层,中密,潮湿-饱和,I级松土,б0=400KPa。9、圆砾土(Qplal664)褐黄色,灰黄色,厚度8~28m,为该工点的主要地层,粒径组成:60mm的约占15%~0%,20~10mm的约占15%~20%,10~2mm的约占15%~40%,余为砂土充填,中密,潮湿,II级普通土。б0=500KPa。10、圆砾土(Qpl63)褐黄色,灰黄色,厚度大于25m,为该工点处格侧桥台的主要地层,粒径组60mm的约占15%~30%,20~10mm的约占15%~20%,10~2mm的约占15%~40%,余为砂土充填,中密,潮湿,II级普通土。б0=500KPa。511、圆砾土(Qdl64)褐黄色,灰白色,厚度5~7m,分布于格侧岸坎坡脚,粒径组成:20mm的约占15%~30%,20~10mm约占15%~20%,10~2mm的约占15%~40%,余为砂土充填,稍密,潮湿,II级普通土,б0=300KPa。12、卵石土(Qal74)褐黄色,灰白黄色,厚度1~8m,主要分布在河床表层及底部,粒径组成:60mm的约占10%~20%,60~40mm的约占25%~35%,40~20mm的约占30%~40%,余为砂土充填,中密,潮湿饱和。III级普通土。б0=650KPa。III级普通土。б0=550KPa。13、石灰岩(QlZ5)灰白色,夹有方解石脉,细粒结构,厚层状,石质坚硬,强风化层厚0.5~6.5m,Ⅳ级软石,б0=1000Kpa。弱风化,Ⅴ级次坚石,б0=1000KPa,产状SN45º/E。(二)水文状况某为常年径流,发源于昆仑山北坡,汇积XX而成,其下游称昆仑河,属内陆水系,最后汇入柴达木盆地的达步逊湖,河水多由雨、雪水及部分地下水补给,水质较好。一般6~9月份为汛期,11月份至来年4月份为枯水期。(三)气象工程地点属柴达木盆地干旱和青藏高原严寒半干旱气候区,冬季寒冷,相对湿度低,降雨量少,年平均气温6.7℃,平均气压724.9mb,极端最高气温35.5℃,极端最低气温-33.6℃,冬季大风日数高达每月20天左右,但多为短时山谷阵风,对工程施工有一定影响。最大冻结深度2.2m。6本地区地震基本烈度八度(四)交通运输及材料供给本桥位于青藏公路K2845+800处,交通较为便利;水泥、钢材等主材由局指统一供应,砂、碎石自采加工,不足部分自格尔木运输。由于本地无粘土,经调查德令哈的粘土质量较好,因此钻孔桩施工用粘土自德令哈运至工地。三、施工组织部署(一)施工机构:XX青藏指挥部XX公司机构齐全,设备精良,满足施工管理的要求,针对某特大桥专派一专业化桥梁施工队,各种条件均满足施工需要,人员配备齐全。施工组织机构见附图(一)。(二)工期安排:本桥为全线主要控制工程之一,为确保本桥能够按期完工,针对本桥墩高、圬工量大,工期紧等特点,实行流水作业,分班工作,工期安排如下:1、施工准备:2XXX年7月1日~2XXX年7月25完成钻孔桩准备,其它施工准备在7月31日完成。2、钻孔桩施工:2XXX年7月25日~2XXX年10月25日。3、扩大基础、挖井基础:2XXX年7月25日~2XXX年11月20日。4、承台施工:2XXX年8月16日~2XXX年11月30日。5、墩身施工:2XXX年9月15日~2XXX年7月30日(其中2XXX年12月1日~2XXX年3月31日放假)。76、桥台施工:2XXX年8月1日~2XXX年9月30日。7、附属工程及桥面系施工:2XXX年6月1日~2XXX年10月30日。施工进度详见“某特大桥施工进度横道图”(附图二)(三)机具设备、材料:详见“某特大桥主要机具设备表”(附表一)“某特大桥主要工程数量表”(附表二)“某特大桥材料需求量表”(附表三)。(四)劳动力安排:本桥计划配备劳动力300人,其中主要技术工人180人,见“某特大桥劳动力动态图”(附图三)。(五)施工顺序:1、扩大基础部分优先安排格台、拉台基础施工。挖井基础优先施工2#、20#、1#及19#墩。2、钻孔桩施工从桥两侧向中心方向移动,尽量在冬季前施工河床钻孔桩。3、墩台身施工:优先安排格台、拉台台身施工,为桥台两侧路基填土做好准备。空心墩实体部分优先安排施工,2XXX年11月30日前翻模施工完成第一批空心墩,其余空心墩安排在2XXX年4月1日以后施工。4、铺轨架梁之后进行桥面系施工。(六)准备工作:1、现场实地考察,了解地形地貌,合理布置施工现场,调查水、电、材料等资源情况。82、布置施工便道,解决水、电问题。3、认真审核图纸,进行图纸会审,编制实施性施工组织设计,明确安全、质量等保证措施并落实到施工过程中。4、合理进行场地布置,硬化料场,搭建临时房屋。5、劳动力、材料、机具设备等进场,检查存在问题,及时解决,准备充分,为开工创造条件。6、进行技术交底,测量复核,布设护桩。7、办理单位工程开工批复手续。(七)质量目标:本桥为青藏线全线的重点工程之一,因此必须创“部优”工程,科学施工管理,精心组织,严格施工工艺,采用先进技术和强有力的施工保证措施,确保工程保部优、争国优。四、大、小临设施:1、施工现场布置:首先进行场地平整,从实际出发,合理布置,既满足施工需要又经济节约,同时又便于管理,场地硬化4000m2,采用15cm厚的C15砼;4#、5#墩施工现场采用花格布及钢管脚手架封闭,现场布置必须清洁、整齐,并贯彻施工始终。2、队伍驻地:临时用地30亩,修建临时房屋11间,搭建帐篷15顶、铁皮房6幢,包括办公室、宿舍、厨房、锅炉房、发电机房,零星料房、厕所等。3、临时便道:沿某特大桥走向布置施工便道,长约1.5Km;另搭设便桥一座4-8m;进入格台施工便道自青藏公路K2842+200右侧引入,9长5.9Km;拉台施工便道自青藏公路K2847+900左侧引入,长6.8Km,用于
本文标题:青藏铁路某特大桥施工组织设计_secret
链接地址:https://www.777doc.com/doc-3446124 .html