您好,欢迎访问三七文档
地下室工程施工方案工程名称:益阳大厦银城华天扩建工程建设单位:益阳市资阳商贸投资有限公司监理单位:湖南安泰工程项目管理有限公司施工单位:湖南顺天建设集团有限公司目录1.编制依据················································································································32.工程概况················································································································33.施工准备················································································································43.1.技术准备·································43.2.基础施工阶段劳动力投入·························43.3.材料机械准备·······························43.4.施工顺序·································54.施工工艺················································································································64.1.人工清底·································64.2.混凝土垫层施工······························64.3.基础砖膜施工·······························64.4.防水层施工································74.5.防水保护层·······························184.6.施工缝做法·······························184.7.承台、地梁及底板施工·························184.8.墙柱及顶板施工·····························274.9.后浇带处理························································234.10雨季施工·························································235.质量保证措施·······································································································345.1.项目质量管理目标····························345.2.设置质量管理机构····························345.3.保证人员素质······························345.4.明确责任,实行奖罚制·························345.5.确保工程质量的技术管理措施······················356.安全生产管理措施·································································································356.1.安全管理的基本原则···························356.2.健全管理体系······························366.3.认真执行各项安全管理制度·······················366.4.安全生产教育······························37—第3页—1.编制依据1.1工程施工合同1.2本工程施工图纸及设计说明1.3图纸会审纪要及设计变更2.工程概况2.1益阳大厦银城华天扩建项目地处资阳一桥西侧与益阳市五一西路南面交界处,该工程由湖南城市学院规划建筑设计研究院设计,益阳市资阳商贸投资有限公司投资建设,湖南安泰工程项目管理有限公司监理,湖南顺天建设集团有限公司承包建设。该工程建筑占地面积8455.7㎡,总建筑面积68841㎡(其中地下5417㎡、地上63424㎡),建筑层数:地下室一层,地上二十三层(地上六层商场、一层转换层、十六层住宅),建筑物高度84.2m,屋面面层高度79.55m。本工程建筑结构形式:基础采用泥浆护壁旋挖成孔灌注桩,主体为框肢剪力墙结构,建筑等级为二级,结构设计使用年限50年,建筑抗震设防类别丙类,抗震设防烈度为六度,地基基础设计等级2级,砌体施工质量控制等级B级,设计防火类别为一类,耐火等级为一类,屋面及地下室防水等级为Ⅱ级。主要结构材料:砼强度等级:桩为C35,剪力墙、柱、梁板、楼梯:七层及以下为C45,(地下室抗渗等级为S8),八∽十二层为C40,十三∽十五为C35,十六∽十九层为C30,二十层及以上为C25,构造柱为C25,钢筋设计为HRB235级(湘钢产),HRB400(涟钢产),钢板采用Q235-B、Q345-B钢,吊钩、吊环采用HPB235级钢筋,填充墙:±0.00以上所有外墙采用MU10烧结空心砖、M5混合砂浆砌筑,其余均采用加气砼切块,M65砌块专用砂浆砌筑,±0.00以下(地下室除外)采用M10烧结普通砖,M7.5砂浆砌筑。装饰装修:外墙保温采用微晶无机保温砂浆外墙内保温系统,屋面保温采用40厚挤塑苯乙烯泡沫板。门窗工程:本工程的建筑外门窗抗风压性能分级为2级,气密性能分级为4级,水密性能分级为4级,防火墙和公共走廊上疏散用的平开防火门应设闭门器,双扇平开防火门安装。闭门器和顺序器,常开防火门须安装信号控制关闭和反馈装置。屋面工程为平屋面防水等级为二级,采用倒置式屋面。外墙装修:住宅部分为黄色外墙面砖,商场部分为蓝色隐框玻璃幕墙与干挂黄色花岗岩。2.2主楼与裙楼、地下车库底板均采用4mm厚SBS改性沥青防水层+50厚细石混凝—第4页—土(商品混凝土)保护层,承台、承台梁立面按设计图纸也采用50厚细石混凝土保护层。3.施工准备3.1.技术准备3.1.1组织有关施工人员认真熟悉图纸,制订材料进场计划。3.1.2根据工程的定额用工编排劳动力、机械及周转材料的进场计划。3.1.3制定施工进度计划。3.1.4做好桩基工程的验收与资料移交工作。3.2.基础施工阶段劳动力投入工种钢筋工木工混凝土工架子工电焊工电工防水工合计人数455510752151393.3.材料机械准备3.3.1主要周转材料:φ48脚手架钢管,十字扣件,山形卡,12厚木胶合板模板,12厚竹胶合板、木方等工程用材料:商品混凝土。3.3.2主要机械设备一览表:名称型号单位数量备注自升式起重机QTZ5610型台3混凝土搅拌机JD-350型台1钢筋成型弯曲机GW-40台2—第5页—汽车泵46m臂长台180型地泵台2对焊机UN1-150台1钢筋调直机JTK-2台2钢筋切断机GQ40台2交流电焊机BXI-500台3蛙式打夯机HW-60台2平刨机MB503台1圆盘锯MJ104A台1插入式振捣器HZ50台5应有备用数空气压缩机ZY-1.6/10台43.4.施工顺序机械开挖施工完毕人工挖土破桩头支设底板垫层模板浇筑底板垫层混凝土放线砖模20厚1:2水泥砂浆立面抹光、水平找平防水层施工防水保护层施工承台、地梁钢筋绑扎绑扎底板底层钢筋按支撑架绑扎底板上层钢筋墙柱插筋绑扎止水钢板焊接安装人防口部门框安装固定底板上口及导墙模板支设、加固人防工程隐蔽验收底板混凝土浇筑混凝土养护、测温搭设满堂架夹层地下室施工地下室墙柱钢筋绑扎地下室墙柱合模浇地下室墙柱砼拆墙柱模、养护支设地下室顶板模板绑扎地下室顶板钢筋地下室顶板混凝土浇筑地下室混凝土子分部验收地下室外墙防水层施工防水保护墙砌筑回填土地下室填充墙砌筑基础分部工程验收。—第6页—4.施工工艺4.1.人工清底4.1.1.人工清底4.1.1.1.人工清土应确保基底土不受扰动,且基底标高正确。4.1.1.2.人工清土应及时,清理出来的土方就近挖填平衡后,用塔吊吊运出基坑适当位置(便于外运,不影响正常施工的弃土场地)。4.1.2.基坑排水沿基底四周承台地梁砖胎膜先行砌筑到位,使周边自然形成集排水沟(承台边胎膜碍事处用¢150PVC管架通敷设),转角及现场适度部位增设抽水集水坑,确保场内不积水。4.2.混凝土垫层施工根据设计图纸中地梁与承台的平面尺寸放出基础垫层的边线位置,垫层外框模采用60×100mm木方制作,用¢12@1500mm,400mm长钢筋头打入土中控制垫层混凝土上口标高。混凝土采用C15商品混凝土浇筑,表面随打随抹。混凝土浇筑12小时后洒水养护,待表面强度达到1.2MPa以后才能允许人员在其上走动和进入其它工序。4.3.基础砖膜施工承台、承台梁模板根据设计要求采用砖模砌筑,砖膜厚度为240mm,座落在垫层上,采用M10水泥砂浆砌筑MU10红砖,砌筑前先在垫层上放出底板处轮廓线,砖模内侧边线比底板外皮线大120mm,为防水保护层厚度做法尺寸。砖模内侧抹20㎜厚1:2水泥砂浆,后做柔性防水后再在其面上做50厚C20细石商品混凝土,阴阳角做成弧形。—第7页—4.4.防水层施工其公司选派专业管理水平高,人员设备齐,技术力量雄厚的施工队伍负责施工,以确保施工质量。施工前应作好以下准备工作1、施工人员准备工作:由专业施工班组组织过硬的施工队伍,施工人员持证上岗,保证所有施工人员都能按有关操作规程,规范及有关工艺要求施工。2、施工技术准备:组织图纸学习及专业技术会审,进行设计交底,对图纸上存在问题及特殊部位的施工方法、施工要求进行答疑。对于复杂的施工分项以及重要施工部位,要事先编制具体施工方案。事先准备本工程的各项检查资料,确保资料真实,及时归档。3、防水材料的确定:根据设计要求,地下采用SBS防水卷材4mm厚,单层做法,热熔施工;4、施工组织:防水专业施工单位工地现场主管工长质检班组长、安全员工人5、施工前的准备工作:5.1施工机具准备:—第8页—防水卷材主要施工工具机具名称用途机具名称用途料桶装冷底油扁铲清理地面滚刷涂刷底油扫帚清扫地面刮板刮边弹线盒弹线丁字尺割量卷材喷灯热熔卷材裁纸刀切割卷材压辊压平卷材开刀封边灭火器防火5.2材料准备:将用于该工程的材料提前运到现场,做好施工前的一切准备工作。6、施工工艺:6.1、工艺流程:6.2、地下室施工工艺:清理基层涂刷基层处理剂弹线、定位铺贴附加层及特殊部位铺贴防水卷材收头、封边处理临时施工缝搭接预留临时固定处理工清理检查修正验收—第9页—6.2.1地下工程卷材防水采用外防贴法施工。(下附外防外贴法防水构造图)6.3、清理基层:把基层表面的尘土杂物清理干净。4、涂刷基层处理剂4.1基层处理剂的作用是:向水泥基面渗透,以堵塞水泥基础的毛细孔,防止地下水从毛细管析出。利用向地面渗透形成的“塞柱”,增加卷材与基础的附着力。4.2考虑了向地下渗透形成牢固的塞柱以及与卷材相匹配的情况,在选择卷材时,最好选择该厂的配套底油,以保证防水的整体性能。底油的涂刷要均匀一致,不能有漏刷,不能有堆积,一般须经过6小时左右,达到干燥程度方可施工附加层及细部处理。4.3对转角、积水坑、电梯井、特别是本工程底板柱帽等部位先作附加层,方法是按细部形状将卷材剪好,形状合适后,再将卷材的底面用汽油喷灯烘烤,将其底面呈熔融状态,立即粘贴在己涂刷基层处理
本文标题:地下室工程施工方案
链接地址:https://www.777doc.com/doc-3485543 .html