您好,欢迎访问三七文档
当前位置:首页 > 商业/管理/HR > 其它文档 > 红岩渠滑坡体稳定性分析与治理方案
2010.18、2008512,8.0。K3+360—K3+455,、,,,、,10~25cm。,,、31.5hm2、,。,。,、、,。、65m,18m,3300m3,。,:①。,,,,、。②。,、、、,,,。,,,,,,。③。,,、,、、。,,。,。、、、,:1.,0.15g。,、。,,,,,,,,:2010-07-22:(1966—),,。1,1,2(1.,611930,;2.,610065,):、,,,。:;;;LandslidestabilityanalysisandimprovingplanofHongyanCanal//HeRongzhi,ZhuLei,XiaChengzhaiAbstract:Itanalyzesthedeformation,impactfactorandinstabilitymechanismoflandslideinHongyanCanal.Mechanicalparametersaredeterminedbasedonantianalysismethodsandengineeringcomparison.Instabilitymechanismandthrustcalculationarefixedbyfoldingtransfercoefficientmethod.Asuitableimprovingplanisproposedbasedontheconclusionandactualsituation.Keywords:landslide;slidingsoil;antianalysis;improvingplan:P642.22:B:1000-1123(2010)18-0033-0233CHINAWATERRESOURCES2010.18,。2.,,,,C、准;,,,,。3.,,,,。,,,,。4.K3+365—K3+460“”,。,。,,,,。、1.,1(—′),;,—′。2.19.64kN/m3。,,。,,,K=0.99。3.:1:+;2:++。1,—′1.116;2,1.05,0.982,22.78kN/m,。2,,,。、,,、,,、。:①:,。②:,,C15M10,2cm。③:36,,0.11m,2.0m,6.5m,1.4m,,。④:(603.5m),50.5m。2.8m,1.5m,C20。⑤:,2,,,。、2009215,,,,,,,,、。■:[1].(DZ/T0219—2006)[S].:,2006.[2].(DZ/T0218—2006)[S].:,2006.[3],,.[J].,2010(2).[4],,,.[J].,2005(23).1—′34
本文标题:红岩渠滑坡体稳定性分析与治理方案
链接地址:https://www.777doc.com/doc-3681535 .html