天元建设集团有限公司二次结构施工方案1目录第一章编制依据··············································2第二章工程概况············································21、工程应用的主要规程、规范、标准··························22、工程应用的主要图集·····································23、工程概况············································2第三章施工部署·············································33.1施工准备················································33.1.1技术准备···············································33.1.2材料、机具准备··········································43.1.3劳动力准备···········································53.1.4现场准备···············································5第四章总体施工安排············································54.1植筋施工方法···········································54.1.1简介·················································54.1.2施工准备·············································74.1.3施工方法·············································74.1.4注意事项················································84.2构造柱、圈梁、过梁、拉结筋施工······························84.3加气混凝土砌块施··········································11第五章材料与质量控制···········································125.1砌块·················································.125.1.1主控项目·················································125.1.2一般项目·················································135.2构造柱····················································145.2.1主控项目·················································145.2.2一般项目·················································15第六章质量保证措施及质量通病的分析与控制.·······················156.1质量保证措施···············································166.2质量通病的分析与控制······································16第七章成品保护·················································17第八章安全文明施工措施·········································18天元建设集团有限公司二次结构施工方案2第一章编制依据1.1与工程建设有关的法律、法规和文件;1.2本工程涉及的国家现行的有关标准和技术经济指标;1.3《建筑施工组织设计规范》(GB/T50502-2009)1.4济南军区司令部凯旋花园小区(二标段)主体及配套工程建筑、结构施工图纸1.5工程施工范围内的现场条件、工程地质及水文地质、气象等自然条件。1.6本工程所使用的主要规范、标准、图集等第二章工程概况1.工程应用的主要规程、规范、标准序号规范、规程名称编号1《混凝土结构加固设计规范》GB50367-20062《砌体工程施工质量验收规范》GB50203-20023《建筑机械使用安全技术规程》JGJ33-20014《施工现场临时用电安全技术规范》JGJ46-20055《混凝土结构工程施工质量验收规程》DBJ/01-82-20056《建筑安装分项工程施工工艺规程》DBJ/T01-26-20037《建筑工程施工质量验收统一标准》GB50300-20018《砌体填充墙结构构造》06SG614-192.工程应用的主要图集序号类别图集名称编号1国家《建筑物抗震构造详图》03G329-22山东《蒸压加气混凝土砌块建筑构造》L06J1253国家《钢筋混凝土过梁》03G322-1~43、工程概况:工程名称济南军区司令部凯旋花园小区(二标段)工程地点济南市历城区花园路与七里河路交叉口建设单位济南军区司令部设计单位山东省建筑设计研究院地质勘察单位山东省城乡建设勘察院监理单位山东众成建设项目管理有限公司施工单位天元建设集团有限公司质量目标合格天元建设集团有限公司二次结构施工方案3场地类别II类抗震重要性丙类结构类型剪力墙结构结构层数17层/22层抗震设防烈度六度耐火等级一级屋面防水等级II级结构安全等级\二级建筑面积157001m2建筑高度78.65m最大高度m第三章施工部署3.1施工准备工序流程`3.1.1技术准备1)施工前应对图纸认真审核,了解各部位的材料选择、做法和技术要求。2)做好书面的技术(安全)交底,施工前由施工员进行现场交底。3)砌体材料的复试和砂浆配合比确定的准备工作。4)试验用具的准备。5)绘制砌块排列图:按砌块排列图在墙体线范围内分块定尺、划线,排列齐快的方法和要求如下:(1)砌块在砌筑前,应根据工程设计施工图,结合砌块的品种规格绘制砌体砌块的排列图,二次结构应预先设计好地导墙、配筋带(或圈梁)、接顶方法等,经审核无误,按图排列砌块砌筑施工。-(2)砌块排列应从基础面开始,排列时尽可能采用主规格的砌块,砌体中主规格的砌块应占总量的75%~85%。(3)外墙转角及纵横墙交接处,应将砌块分皮咬槎,交错搭砌,如果不能咬槎时,按设计要求采取其它的构造措施。(4)配制异形尺寸砌块。7)按照主体放线十字控制线,上下进行十字控制线复核,墙上抄的建筑1000mm标高控制线,控制线复核正确无误进行施工;轴线、水平线复核;机具、材料安置检验合格、拉墙筋、构造柱植筋砌体砌筑安装预埋构造柱浇筑检查合格、验收卫生间上翻砼门上圈梁砼浇筑、门过梁预制与安装天元建设集团有限公司二次结构施工方案48)水电、土建交圈审图:为避免专业之间不交圈出现的工程返工,装修前,由公司总工主持,公司及项目各专业人员参加,进行专业交圈审图,用计算机将在同一位置的所有设备、洞口、装置等绘制在一张图纸上,如有不交圈现象,在装修前提前解决3.1.2材料、机具准备1)材料准备:(1)砌块:加气混凝土砌块:体积密度级别B06,强度级别A3.5。砌块的主要规格尺寸(公称尺寸)180厚墙:加气砼砌块采用600×180×240mm(长×宽×高)200厚墙:加气砼砌块采用600×240×200;180厚墙:加气砼砌块采用600×240×180;100厚墙:加气砼砌块采用600×240×100;内外墙采用强度等级MU5.0的粉煤灰砖240X115X53组合打底四皮砖,斜砌紧部位如果不合适可以用粉煤灰砖找平。施工时所用砌块的产品龄期不应小于28d。严禁使用断裂砌块。(2)砌筑砂浆:室内外砌筑砂浆强度为M5混合砂浆;(3)水泥:A、采用32.5级的普通硅酸盐水泥或矿渣硅酸盐水泥。B、水泥进场使用前,应分批对其强度、凝结时间、安定性进行复试。C、当在使用中对水泥的质量有怀疑或水泥出厂超时三个月时,应复查试验,并按其结果使用。D、不同品种的水泥不得混合使用。(4)砂:采用中砂,砂含泥量不超过5%,不得含有草根等杂物,使用前用5mm孔径的筛子过筛。(5)钢筋:Φ12、φ8、φ6。(6)混凝土:构造柱、圈梁、过梁用商品混凝土,强度等级为C25。(7)其他材料:预埋件、刷防腐剂的木砖等。(8)根据施工期间的工程量、施工进度,确定材料的数量及进场时间,有专人负责,确保材料按时进场,并妥善保管。(9)材料进场后堆放整齐,上部覆盖严密,下部垫起架空,防止日晒雨淋。2)施工机具准备:施工机具:施工电梯、泵送砂浆机、砂浆搅拌机、二级配电箱、三级配电箱、钢筋调直机、钢筋弯曲机、钢筋切断机、钢筋剪刀、翻斗车、手推车、磅秤、手锯、托线板、线坠、钢卷尺、灰槽、小水桶、笤帚、水管、大灯、2m靠尺等。天元建设集团有限公司二次结构施工方案53.1.3劳动力准备本工程砌体分项工程安排二个劳务班组进行施工。4#-5#楼砌体工程为一个劳务队负责施工;6#、7#楼砌体工程为一个劳务队负责施工。劳动力的配置根据工程量及施工进度安排进行投入,总体施工人员在70人左右,并根据实际施工进度及时调整以满足施工需要。劳动力计划见表3.3-1:表3.3-1劳动力计划表序号工种人数1瓦工402钢筋工33木工44混凝土工45力工136安装27其它43.1.4现场准备1)对进场材料的型号、规格、数量、质量和堆放位置、次序等已经进行检查、验收,能满足施工要求。2)所需经机具设备已准备就绪,并已安装到位。3)放好砌体墙身控制定位线、门窗口等位置线和建筑100cm标高线,经验线合格后方可施工。4)立皮数杆:宜采用30×40木料制作,皮数杆上注明门窗洞口、拉结筋、圈梁等的尺寸标高。皮数杆宜在门窗和砌体转角处设立,一般距墙皮或墙角50毫米为宜。皮数杆应垂直、牢固、标高一致,经复核,办理预检手续。5)上道工序已经验收合格,并办好交接手续。6)墙体拉结筋已按设计、施工方案要求预埋,并经过隐蔽验收。7)根据最下面一皮砖的标高,拉通线检查,楼板结构或室内地坪出现偏差时应预先用1:2水泥砂浆找平,如水平灰缝厚度超过20毫米,用C25细石混凝土找平。8)样板墙砌筑:在正式施工前,应先砌筑样板墙,经各方验收合格后,方可正式砌筑。第四章总体施工安排4.1植筋施工方法4.1.1简介天元建设集团有限公司二次结构施工方案61)工程简介:本工程构造柱、圈梁、当洞口紧贴柱或钢筋混凝土墙时的过梁、砌筑墙体的拉结筋钢筋锚固生根,均采用后植筋锚固方案。2)建筑结构胶产品简介:本工程采用HF-3型植筋型锚固树脂胶(A级),该产品是由合成树脂高分子材料、无机填料及化学助剂组成的粘结材料。该产品特点及技术性能如下:(1)产品特点:A、可在负温下(-10°)施工,承载快、粘结力大、抗疲劳、耐老化(50年)、抗震动。B、施工方便,水平、顶孔均易施工并能保证孔内充满胶。C、锚固效果佳,成本低。D、凝胶时间(10-120min)。(2)产品性能:A、抗压强度:≥60Mpa。B、抗弯强度:≥50Mpa。C、金属粘结抗剪强度:≥16Mpa。D、抗冻融性能:50次循环后强度不降低。E、环保性能:符合《室内装饰装修材料胶粘剂中有害物质限量》GB18583-2001标准要求。(3)植筋参数设计:本工程植筋全部采用HF-3型植筋型锚固树脂胶(A级),该植筋胶约束拉拔条件下带肋钢筋与混凝土的粘结强度≥11MPa。植筋基本锚固深度和单根植筋锚固的承载力计算如下:(1)植筋基本锚固深度Ls=0.2αsptdfy/fbd式中:αspt-为防止混凝土劈裂
本文标题:二次结构施工方案111
链接地址:https://www.777doc.com/doc-3846529 .html