您好,欢迎访问三七文档
当前位置:首页 > 办公文档 > 招标投标 > 3-8号楼外墙外保温施工方案
中铁建设集团中国铁建中铁建设集团西安分公司第三项目部外保温施工方案目录一、编制依据··························································································1二、工程概况··························································································1三、施工部署··························································································13.1外保温施工区域的划分······································································23.2外保温施工做法划分·········································································2四、施工工艺及施工方法:········································································24.1大模内置施工··················································································24.2粘贴法外保温施工············································································6五.质量保证措施····················································································125.1施工准备阶段的质量保证措施····························································125.2施工过程中质量保证措施··································································12六.安全及文明施工·················································································136.1安全技术措施·················································································136.2施工中具体作法··············································································146.3文明施工·······················································································14中铁建设集团中国铁建中铁建设集团西安分公司第三项目部外保温施工方案第1页共14页外保温施工方案一、编制依据《恒大城施工组织设计》;陕西晨光建筑设计院设计的《恒大城3-8号楼》施工图纸(建筑、结构);《膨胀聚苯板薄抹灰外墙外保温系统》JGJ149-2003《外墙外保温工程技术规范》JGJ144-2004《外墙外保温构造图集》陕2005J12《建筑工程质量验收统一标准》GB50300-2001《建筑节能工程施工质量验收规范》GB50411-2007二、工程概况序号项目内容1建筑面积3-5号楼建筑面积30221.8m26-8号楼建筑面积31031.6m22建筑层数3-5号楼:地上24层,地下1层商铺1层6-8号楼:地上24层,地下1层商铺2层(局部一层)。3建筑层高3-5号楼:地下1层4.3m;一层4.38m标准层3m6-8号楼:地下1层4.3m;一层4.38m标准层3m4建筑高程±0.000绝对标高3-5号楼401.900m建筑高度73.75m6-8号楼401.900m73.75m5保温外墙外墙处采用大模内置4cm厚XPS板保温层。三、施工部署中铁建设集团中国铁建中铁建设集团西安分公司第三项目部外保温施工方案第2页共14页3.1外保温施工区域的划分根据设计总说明及外保温示意图将外保温区域划分如下:3.1.1所用外墙除门窗洞口以外全部采用外墙外保温,材料采用40mm厚的XPS保温板。3.1.2分隔采暖与非采暖房间的内墙(见外保温位置示意图),材料采用10mm厚的XPS保温板。3.2外保温施工做法划分3.2.1外墙外保温从首层开始设置。3.2.2二层以上(包括二层)采用大模内置的施工方法。3.2.3分隔采暖与非采暖房间的内墙采用后贴法施工。3.2.4不能采用大模内置的一律采用后贴法施工。四、施工工艺及施工方法:4.1大模内置施工外墙钢筋绑扎验收固定保温板模板安装砼浇注模板拆除板面清理4.1.1大模内置施工做法构造做法:4.1.2施工准备中铁建设集团中国铁建中铁建设集团西安分公司第三项目部外保温施工方案第3页共14页4.1.2.1材料准备:40mm厚的EPS单面钢丝网架保温板(表面已经喷界面剂一道),规格1200×2900×40.4.1.2.2机具准备:电热丝切割器、钢锯条、剪刀等常用工具。4.1.2.3施工条件4.1.2.3.1所有建筑轴线放线完毕,且经检验合格。4.1.2.3.2墙身线及外墙模板水平控制线放线、复核,板面标高复测完毕,准确无误。4.1.2.3.3钢筋绑扎、预埋件安装完,且隐蔽验收合格。洞口模板安装完毕,位置、数量及其稳固性等经验收合格。4.1.2.3.4板面基层应清理干净,检查并避免钢筋网片与钢筋拉结及预埋管线等与大模板对拉螺栓处在同一位置,影响对拉螺栓安装。4.1.2.3.5安全防护网必须逐层上升至大模板顶相对标高1.2m以上。4.1.1.3.6所有外保温材料已经运至现场经检验合格。4.1.2施工做法:4.1.2.1钢筋绑扎:剪力墙钢筋严格按照图纸及规范要求绑扎到位,垫块按要求加设到位。4.1.2.2保温板安装:4.1.2.2.1安装保温板时,保温板就位后,将L筋按垫块位置穿过保温板,用镀锌铁丝将其与墙体钢筋绑扎牢固。中铁建设集团中国铁建中铁建设集团西安分公司第三项目部外保温施工方案第4页共14页4.1.2.2.2窗洞口处保温板安装:为了确保塑钢窗窗框与墙体的可靠连接,凡与塑钢窗连接的外墙处10cm范围内保温板不加,此处用砼浇筑。4.1.2.2.3外墙转角处的阳角保温板不宜断开,阳角处的拼缝采用企口法连接。这样可确保外保温的整体性,可避免由于温度或天气变化原因导致“冷桥”现象的发生。中铁建设集团中国铁建中铁建设集团西安分公司第三项目部外保温施工方案第5页共14页4.1.2.2.4外墙部分的框架梁、连梁也要求加外保温,在飘窗梁的外侧加保温板时,必须严格控制保温板的高度,防止由于外保温板伸入班内而影响结构砼板的质量,导致飘窗板“挂门帘”。4.1.2.2.5外墙外保温必须连续,拼缝要求严密确保不漏浆。4.1.2.2.6在砼浇筑过程中禁止将砼直接冲击在保温板上,防止将保温板打坏,影响剪力墙的实体质量。4.1.2.2.7模板拆除后立即检查外保温板面的质量,对于板面凹陷的不仅中铁建设集团中国铁建中铁建设集团西安分公司第三项目部外保温施工方案第6页共14页要求将保温板割掉重新修补,还要求将墙体砼的质量进行质量缺陷的修补(项目部出专项方案)。4.2粘贴法外保温施工4.2.1施工工艺施工准备基层墙体处理(基层不平时用1:3水泥砂浆抹平)刷界面剂一道粘结砂浆粘贴挤塑板钻孔及安装锚固件(挤塑板打磨找平)抹3厚的面层抗裂砂浆粘贴网格布挂镀锌钢丝网,锚胀管螺丝抹3-5厚底层抗裂砂浆面砖饰面4.2.2施工操作要点:4.2.2.1基层处理彻底清除基层墙体表面浮灰、油污、脱模剂、空鼓及风化物等影响粘结强度的材料。4.2.2.2为增加挤塑板与基层几面层的粘结力,应在挤塑板两面各刷界面剂一道。4.2.2.3配置专用粘结剂:4.2.2.3.1将5份(重量比)干混砂浆倒入干净的塑料桶,加入1份净水,应边加水边搅拌,然后用手持式电动搅拌器搅拌5分钟,直到搅拌均匀,且稠度适中为止。4.2.2.3.2将配置的粘结剂静置5分钟,在搅拌即可使用,配置好的粘结剂宜在1小时内用完。4.2.2.3.3专用粘结剂的配置只准许加入净水,不得加入其他添加物(剂)。4.2.2.4安装挤塑板4.2.2.4.1标准板规格尺寸为1200*600,对角线误差小于2,挤塑板用电热丝切割器或工具刀切割,尺寸允许偏差为±1.5。中铁建设集团中国铁建中铁建设集团西安分公司第三项目部外保温施工方案第7页共14页4.2.2.4.2网格布翻包:门窗洞口、变形缝两侧等处的挤塑板上预粘网格布,总宽度约200,翻包部分宽度为80,具体做法如下:网格布裁剪长度为180加板厚。首先在翻包部位抹长度为80宽度为2的专用粘结剂,然后压入80长的网格布,余下的甩出备用。4.2.2.4.3将配置好的专用粘结剂涂抹在挤塑板的背后,粘结剂压实厚度约为3,为保证粘结牢固,粘结方法可采用点粘法:4.2.2.4.3.1用抹子在每块挤塑板周边及中间抹宽50,厚度为10的专用粘结剂,再在挤塑板分隔区内抹直径为100,厚度为10的灰饼。中铁建设集团中国铁建中铁建设集团西安分公司第三项目部外保温施工方案第8页共14页4.2.2.4.3.2将抹好专用粘结剂的挤塑板迅速粘贴在墙面上,以防止表面结皮而失去粘结作用。不得在挤塑板侧面涂抹专用粘结剂。4.2.2.4.3.3挤塑板粘上墙后,应用2米靠尺压平操作,保证其平整度及粘贴牢固,板与板之间要挤紧,不得有缝,因切割不直形成的缝隙,用挤塑板条塞入并磨平。每粘完一块板,应将挤出的专用粘结剂清除。4.2.2.4.3.4挤塑板粘贴应分段自下而上沿水平方向横向铺贴,每排板应错缝1/2板长,局部最小错缝不得小于100。门窗洞口门窗洞口保温板排版注:1.保温板在洞口四角处不允许接缝,接缝距四角≥200以免洞口处的饰面出现裂缝。2.每排保温板应错缝,错缝长度为1/2板长。3.除门窗洞口以外的洞口做法参见门窗洞口。4.2.2.5安装固定件:中铁建设集团中国铁建中铁建设集团西安分公司第三项目部外保温施工方案第9页共14页4.2.2.5.1固定件在挤塑板粘贴8小时后开始安装,并在其后24小时内完成。按设计要求的位置用冲击钻钻孔,孔径10,钻入基层墙体深度约为60,固定件锚入基层墙体的深度约为50,以确保牢固可靠。4.2.2.5.2固定件个数按设计说明要求设置(每平米不能少于10个)。4.2.2.5.3自攻螺丝应挤紧并将工程塑料膨胀钉帽与挤塑板表面齐整或略拧入一些,确保膨胀钉尾部回拧,使其与基层墙体充分锚固。4.2.2.6挤塑板打磨:4.2.2.6.1挤塑板接缝不平处应用粗砂纸打磨,动作为轻柔的圆周运动,不要沿着与挤塑板接缝平行的方向打磨。4.2.2.6.2打磨后及时将挤塑板碎屑及浮灰用刷子清理干净。4.2.2.7作装饰线角:4.2.2.7.1根据设计要求用墨线弹出需要做线角的位置,并进行水平和竖直方向校正。4.2.2.7.2凹线角使用开槽器将挤塑板切成凹口,挤塑板凹口最薄处不小于15。4.2.2.7.3凸线角应按设计尺寸切割后,在线角及对应挤塑板两面刷界面剂一道,再涂满专用粘接剂,使其粘贴牢固。4.2.2.8抹底层聚合物砂浆:4.2.2.8.1聚合物砂浆的配置同专用粘结剂。4.2.2.8.2将配置好的聚合物砂浆均匀的涂抹在挤塑板上,厚度为24.2.2.9压入网格布固定镀锌钢丝网:4.2.2.9.1网格布应按工作面的长宽要求裁剪,并应留出搭接宽度。网格布的裁剪应顺经纬向进行。4.2.
本文标题:3-8号楼外墙外保温施工方案
链接地址:https://www.777doc.com/doc-4160211 .html